Skip to main content
Official casework recordDismissedCurrent release

Appeal 6002864

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the change of use of first and second floor from offices to flats including the erection of first floor extension and rear dormer extension to accommodate 3no. flats.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    [name]

    The Council amended the description of development during the consideration of the application to one which is more concise and removes superfluous text from that given in the application form. I have taken the description above which also appears in the appeal form. I am therefore satisfied that the main parties would not be prejudiced by use of the above description. I have determined the appeal accordingly.

  3. Section 04

    Main Issue

    The main issue is whether the proposed development would provide acceptable living conditions for future occupiers, with regard to internal floorspace, outdoor amenity space and noise.

  4. Section 05

    Reasons

    The appeal site comprises a two-storey mid-terrace commercial property situated on an arterial route. The surrounding area has a mixed-use character, with commercial frontages along the main road, some with residential uses above, and residential properties situated to the rear. A large single storey extension now occupies the entirety of the plot to the rear, leaving the site with no external space.

    The proposal includes a first-floor rear extension and rear dormer to facilitate the change of use of the first and second floors into 3 separate flats. The ground floor would be internally reconfigured to provide access to the flats from the front.

    The bedrooms of the proposed development exceed the minimum standards for rooms with 2 bedspaces within the ‘Technical housing standards - nationally described space standards’ (2015), which have been adopted within Policy JP-H3 of the Places for Everyone Joint Development Plan Document 2022 to 2039 (March 2024) (the DPD). Notwithstanding the stated intended single occupancy, I find it reasonable that the size of the bedrooms is used to determine how the occupancy of the flats should be assessed, which in this case would be one bedroom, 2 person occupancy. This occupancy establishes the minimum gross internal floor areas that the DPD states must be provided. I have therefore considered the appeal on this basis, which is consistent with the Council’s

  5. Section 06

    assessment.

    I therefore find that Flats 1 and 2 would fail to meet the minimum standard of 50 sq.m. [name] 1 would only have a marginal shortfall, Flat 2 would be substantially below the minimum standard. The undersized living space within these flats would result in cramped conditions and would therefore provide inadequate living conditions for future occupants. I have considered whether it would be possible to limit the occupation of the flats to one person, however, I find that such a condition would fail to meet the tests within the National Planning Policy Framework (the Framework), with particular regard to enforceability.

    Section 3 of the General Design Principles Supplementary Planning Document (the SPD) stipulates minimum sizes for private sitting-out areas for new flat/apartment developments. However, the development would not provide any private outside amenity space for the future occupiers. The appellant contends that similar arrangements exist within this terrace block and that, in this urban location, with nearby gym and leisure facilities, public parks and green spaces within walking distance, the absence of private amenity space is not, in itself, grounds for refusal. However, limited information on these facilities has been provided. I am therefore not satisfied that these would mitigate the lack of provision of private outside amenity space. Furthermore, given the undersized living accommodation proposed, the lack of any outside amenity space further compounds the detrimental impact on the amenity of future occupiers.

    The proposed accommodation would be sited above an existing commercial premises. No noise assessment has been submitted in connection with the proposal. While the Council’s Pollution Control Officer did not object to the application, they recommended that conditions relating to acoustic insulation and ventilation were necessary. Such a condition is also proposed by the appellant.

    In the absence of a noise assessment, there is nothing to indicate how substantial such a scheme might be or the effect of its implementation on other matters. Nor that it would be possible. This condition would therefore be unreasonable. Permitting the application without such a condition means that I cannot be satisfied that the proposed scheme would provide a satisfactory living environment for future occupants in terms of noise.

    I have identified harm to the multiple matters of internal floorspace, outdoor amenity space and noise. Taken together this would result in wholly unacceptable living conditions for future occupiers, and the nature of this harm is serious.

    Therefore, I conclude that the proposal would provide unacceptable living conditions for future occupiers with regard to outdoor amenity space, internal floorspace and noise. It would therefore conflict with Policy CG4 of Bolton’s Core Strategy Development Plan Document (March 2011) and [name]-H3.1., JP- P1.15.a. and JP-C5:1.k. of the DPD which together seek to secure new development which provides a high level of amenity and mitigates impacts from noise pollution. The SPD supports these policy aims.

  6. Section 07

    Other Matters

    My attention has been drawn to a number of appeals (APP/Z4310/W/20/3262111, APP/X1118/W/18/3193299 and APP/H1840/W/21/3289648) with regard to the need for outside amenity space, the assessment of the level of occupation and internal floorspace and the use of conditions to secure noise mitigation. However, I am not provided with these decisions and, based on the evidence in this case, these references do not appear to relate to specific appeals which reference the relevant matters in this appeal. Therefore, I am not satisfied as to the accuracy of this material. I afford it little weight in this decision.

    I acknowledge that the proposal would not adversely affect the living conditions of any neighbouring occupiers. However, this is a neutral factor which does not weigh in the developments favour.

  7. Section 08

    [name]

    I have found that the scheme would result in unacceptable living conditions for future occupiers. It would therefore not accord with the development plan as a whole. This is a matter that counts significantly against the scheme.

    However, the Council confirm that it cannot demonstrate a 5-year supply of deliverable housing sites. Therefore, the presumption in favour of sustainable development as contained within paragraph 11d) of the Framework is engaged. This requires that planning permission should be granted unless any adverse impacts of doing so would significantly and demonstrably outweigh the benefits, when assessed against the policies in the Framework taken as a whole having particular regard to key policies.

    The proposal would make a modest but worthwhile contribution to housing supply in a sustainable location and would make efficient use of the underused building. However, given the small number of units proposed, these benefits attract only limited weight. On the other hand, the development would result in unacceptable living conditions for future occupiers such that it would not secure a well-designed place or make an effective use of land in this regard.

    Evidence as to the extent of the housing land supply has not been provided, however even if there were to be a significant undersupply, the serious adverse impacts of the scheme would significantly and demonstrably outweigh the benefits when assessed against the policies in the Framework as a whole. Therefore, the presumption in favour of sustainable development would not apply in this case.

  8. Section 09

    Conclusion

    For the reasons given above, I have found conflict with the Development Plan as a whole. The material considerations in this case, including the Framework, do not indicate a decision other than in accordance with the Development Plan. This leads me to conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 5699No official casework-database value to compare
    Extracted decision date · page 1
    23 March 2026Matches the official casework database
    Extracted site visit dates
    3 March 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6002864
Application reference
20009/25
Lead case reference
Not recorded
Planning authority
Bolton Metropolitan Borough Council
Planning authority code
E08000001

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Change of use
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Planning Appeals - Full
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
195 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
18 December 2025
Valid date
18 December 2025
Start date
22 December 2025
Planning authority decision date
19 June 2025
Appeal decision date
23 March 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
86367
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29