Appeal 6002928
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
Change of use and conversion of agricultural building to dwellinghouse (Use Class C3).
Section 02
Decision
The appeal is allowed and prior approval is granted under the provisions of Article 3(1) and Schedule 2, Part 3, Class Q of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) for Change of use and conversion of agricultural building to dwellinghouse (Use Class C3) at [site address] in accordance with the application P/PAAC/2025/05451 and the details submitted with it.
Section 03
Preliminary Matters
The Town and Country Planning (General Permitted Development) England (Amendment) Order 2024 came into force on 21 May 2024. This appeal relates to these ‘New’ permitted development rights and I have determined the appeal on this basis.
Under Article 3(1) and Schedule 2, Part 3, Class Q of the GPDO planning permission is granted for (a) change of use of a building that is part of an established agriculture unit, or a former agricultural building, and any land within its curtilage to a use falling within use class C3 (dwellinghouses) together with (b) the extension of the building and (c) building operations reasonably necessary to convert the building or to extend that building, subject to limitations and conditions.
[name].1(j) indicates that development is not permitted by Class Q(b) if it would consist of building operations other than the installation or replacement of windows, doors, roofs, or exterior walls, or water, drainage, electricity, gas or other services, to the extent reasonably necessary for the building to function as a dwellinghouse. The Council consider that the building operations would go beyond what could reasonably be considered a conversion, and so would not comply with the limitations of Class Q.1(j).
Based on the submissions of the main parties, there is no reason for me to believe that the other criteria of Class Q are not satisfied. Consequently, there is no need to give them further consideration in this decision.
Section 04
Main Issue
In light of the Preliminary Matters above, the main issue is whether the required building operations are to the extent reasonably necessary to carry out the conversion of the building to comply with [name].1(j) of the GPDO.
Section 05
Reasons
The appeal building is constructed of treated timber poles and struts. The northern elevation comprises full height ‘hit and miss’ timber cladding. The majority of the eastern elevation comprises ‘hit and miss’ and timber cladding above fixed base boards. At the time of my site visit, the southern part of the building under an offshoot roof was partly open below the roof and above fairly loosely fitted base boards and gate. However, there was some cladding above loosely fitting base boards to the western elevation of the off shoot. The remainder of the western elevation comprises high level timber cladding above the two main openings to the barn. The roof is constructed from timber with metal sheeting. The floor to the barn comprises compacted earth and stone.
The GPDO states at paragraph Q.1(j) that development under Class Q(b) is not permitted if it would consist of building operations other than the installation or replacement of windows, doors, roofs or exterior walls, or water, drainage, electricity, gas or other services to the extent reasonably necessary for the building to function as a dwelling house. Under paragraph Q.1(h), protrusions of up to 0.2 metres to accommodate building operations under Q.1(j) are permitted.
Paragraph 105 of the Planning Practice Guidance (PPG) advises that the right under Class Q assumes that the agricultural building is capable of functioning as a dwelling. However, the PPG is clear that it is not the intention of the permitted development rights to allow rebuilding work that would go beyond what is reasonably necessary for the conversion of the building to a residential use. Accordingly, it is only where the existing building is already suitable for conversion to residential use that the building would be considered to benefit from the permitted development rights.
Neither the GPDO nor the PPG define the term ‘reasonably necessary’. Consequently, this is a matter of planning judgement based on fact and degree of an individual case. My attention has though been drawn to the Hibbitt judgement 1 which relates to the difference between conversions and rebuilding dealt with under Class Q. This is important because if a development does not amount to a conversion it would fail to be development permitted under Class Q.
The Hibbitt case suggested that an agricultural building may be so skeletal and minimalist, that the works needed to alter it to be used as a dwelling would be of such a magnitude that it would be tantamount to a new build or rebuild as opposed to a conversion. Furthermore, Hibbitt reinforces that it is a matter of planning judgement as to whether the level of works involved would still constitute a conversion.
A Structural Inspection – Overview of [name] (the [name]) has been provided by the appellant. The Structural Report states that the existing building is reasonably sound and considered suitable for conversion under Class Q. 1 Hibbitt and another v Secretary of State for Communities and Local Government (1) and Rushcliffe Borough Council (2) [2016] EWHC 2853 (Admin). The Council have not provided any substantive evidence questioning the structural suitability of the building, provision of an upper floor, internal partitions or provision of concrete insulated floor, and I have no reason to disagree.
The proposal would retain the roof with the insertion of rooflights with retention of the existing timber frame structure, and cladding, with new internal wall lining as well as the introduction of doors and windows. No substantive concerns are raised by the Council with regard to these works.
Notwithstanding, I have had regard to the Council’s concerns about the extent of existing openings to the building and to base board panels being loosely fitting. I have also had regard to the Councils’ concerns regarding the inclusion of new walling comprising building paper, new 100mm timber frame fitted to the existing weatherboarding and fitted with insulation and new cladding, and the need for these works to enclose and weatherproof the building. Given that these works are detailed within the [name] and reflected on the [name] and Elevations ([name]. 24-0902/P1), I find that these works are proposed as part of the application.
However, the [name] and plans are clear with regard to the retention of the existing timber poles, cladding and roofing resulting in much of the existing fabric being retained. Furthermore, with regard to the new timber frame wall and weatherboarding, Class Q.1(j)(i) (aa) allows for the installation or replacement of windows, doors, roofs, and exterior walls to the extent reasonably necessary for the building to function as a dwelling house. It also allows for the partial demolition to the extent reasonably necessary to carry out these building operations with the PPG advising that internal works are not generally development. Moreover, paragraph Q.1(h), allows protrusions of up to 0.2 metres to accommodate building operations under Q.1(j). Therefore, to my mind the vast majority of the works reasonably necessary for the building to function as a dwellinghouse are covered under these items, including additions to, and changes to the walls.
Whilst some relatively considerable works to the building are proposed, particularly with regard to additional cladding/walling to infill existing openings and to replace base boards, particularly to the southern off shoot, many aspects will be retained, including the height, scale and footprint of the building. Furthermore, such boards and openings to barns are not unusual and, in this case, do not comprise the majority of overall elevational coverage with the building generally enclosed. As such I find that these works are all permitted under the GPDO. Furthermore, due to the retention of much of the existing building, lack of substantive evidence to suggest that the new walling would be required to structurally support the building, and with the installation and replacement of walls expressly permitted under Class Q, the appeal building would be capable of conversion to residential use and the proposed building operations would not amount to the complete or substantial re-building of the pre-existing structure, as was found to be the case within Hibbitt.
Therefore, based on the evidence provided, I am satisfied that the building operations proposed would be reasonably necessary in this instance and would not exceed the limitations set out in paragraph Q.1(j) of the GPDO. As such, the proposal would constitute permitted development as set out under Schedule 2, Part 3, Class Q of the GPDO.
Section 06
Conditions
Any prior approval and planning permission granted for the development under Article 3(1) and Schedule 2, Part 3, Class Q of the GPDO is subject to the condition under Q.2 (3) which specifies that the development shall be completed within a period of 3 years starting with the prior approval date. [name](12) of Schedule 2, Part 3 of the GPDO requires development to be carried out in accordance with the details submitted.
[name](13), Schedule 2, Part 3 of the GPDO allows conditions to be imposed that are reasonably related to the subject matter of the prior approval. In relation to this, I note the condition suggested by the Council related to barn owls. However, ecology is not a prior approval matter, with their protection covered by other legislation. Furthermore, as the GPDO requires development to be carried out in accordance with the submitted details, that in this instance includes the mitigation outlined within the [name] Assessment to address the potential presence of barn owls.
Section 07
Conclusion
For the reasons given above, I conclude that the appeal should be allowed and prior approval granted under Schedule 2, Part 3, Class Q of the GPDO subject to the standard conditions set out in paragraph Q.2 of Class Q.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 4181No official casework-database value to compare
- Extracted decision date · page 1
- 30 April 2026Matches the official casework database
- Extracted site visit dates
- 8 April 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6002928
- Application reference
- P/PAAC/2025/05451
- Lead case reference
- Not recorded
- Planning authority
- Dorset
- Planning authority code
- E06000059
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Other minor developments
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Prior Approval
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 115 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- Yes
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- No
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 19 December 2025
- Valid date
- 19 December 2025
- Start date
- 23 December 2025
- Planning authority decision date
- 20 October 2025
- Appeal decision date
- 30 April 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office-s78
- Dataset status
- Current release
- Catalogue record ID
- 88091
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 20 August 2026 at 16:29