Appeal 6003012
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
change of use of agricultural building to form 1no. dwellinghouse and associated building operations.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
The description of development in the banner heading above is taken from the original application form, albeit shortened to only include necessary information.
Section 04
Background and [name]
Under Article 3(1) and Schedule 2, Part 3, Class Q, of the Town and Country Planning (General Permitted Development) (England) Order 2015 as amended (the Order), development is permitted for the change of use of a building and any land within its curtilage, from use as an agricultural building to a use falling within Class C3 (dwellinghouses) together with building operations reasonably necessary to convert that building, subject to limitations and conditions.
The Council may refuse the application where it considers that the proposed development would not comply with, or that the developer has provided insufficient information to enable the Council to establish whether the proposed development complies with, the conditions, limitations or restrictions set out in paragraphs Q.1 and Q.2.
The Council refused the application in relation to the extent of the works which would be required to enable the building to function as a dwelling and the suitability of the appeal building for conversion and, consequently, its non-compliance with paragraph Q.1(i). The Council has also refused the application on the grounds that the location of the dwelling would be unsuitable for conversion to residential use under paragraph Q.2(1)(e).
The main issues are, therefore, whether the proposed development would constitute permitted development in respect to Class Q and paragraph Q.1(i); and, if the proposal is found to constitute permitted development, whether prior approval would be required and should be granted.
Section 05
Reasons
The appeal building is a steel-framed barn comprising a metal frame with a shallow pitched sheet metal roof. The building is open to two sides, one of which is enclosed by the external wall of the adjacent building. The other two sides comprise blockwork walls to the lower half and vertical timber cladding above.
[name].1(i) of the Order indicates that development is not permitted if it would consist of building operations other than the installation or replacement of windows, doors, roofs, or exterior walls, or water, drainage, electricity, gas, or other services to the extent reasonably necessary for the building to function as a dwellinghouse. Planning Practice Guidance (PPG) states that it is not the intention of the permitted development right to allow rebuilding work which would go beyond what is reasonably necessary, and that it is only where the existing building is already suitable for conversion to residential use that it would be considered to have the permitted development right.
In addition, the PPG specifically refers to the case of Hibbitt and another v Secretary of State for Communities and Local Government (1) and Rushcliffe Borough Council (2) [2016] EWHC 2853 (Admin) (the Hibbitt case). This case has also been referred to by both main parties. Amongst other things, the Hibbitt case explored the distinction between works required for the conversion of an existing agricultural structure or building to a dwellinghouse, and works amounting to its rebuilding or, in effect, the creation of a new building. [name] set out that this distinction is a matter of legitimate planning judgement.
In the case before me, the appellants have provided a [name], dated May 2025 (the structural appraisal). This concludes that the barn is in good structural order, that the steel portal frame and timbers are in good order and that there are no signs of leaks in the roof. Nevertheless, the structural appraisal does refer to bulging and cracking in the blockwork which I also saw on site.
While the existing barn might be in good condition overall, and I have no reason to dispute the findings of the structural appraisal, and no substantive evidence from the Council that challenges the appellants’ findings, whether the level of works involved would constitute a conversion is a matter of planning judgement. Whether the existing building is suitable for conversion to residential use, or whether the works amount to the creation of a new building, does not wholly depend on whether the existing structure needs wholescale demolition or rebuilding.
The two open sides would require the construction of new walls and the structural appraisal advises that the existing blockwork would require localised repair. The structural appraisal does not advise how much of each blockwork bay would be required to be rebuilt and there is no definition of ‘localised’. From my own observations, even without an alternative structural engineer’s assessment, the blockwork on three out of five bays would need to be rebuilt to some extent.
The rebuilding of the blockwork and the construction of two new walls would comprise new elements which, albeit not required to structurally support the existing frame, would be new structural elements. The extent of these structural elements, although not resulting in wholescale demolition or rebuilding, is significant due to the lack of existing walls and the extent of the damage to the blockwork. Consequently, it is my judgement that the works would amount to significant rebuilding.
In this regard the appeal before me is materially different to the [name] appeal1 referred to by the appellants in which the existing blockwork walls were to be retained and one new wall built. In that case the Inspector found sufficient differences to the Hibbitt case and also concluded that a considerable proportion of the existing building would remain.
The appeal before me has more similarities with the Hibbitt case, which was largely open to three sides and where the existing structure was capable of taking the loading for the new panels. Nevertheless, the judgment determined that the proposed works would not amount to conversion. Although there are similarities with Hibbitt, each case should be determined on its own merits, having regard to the particular circumstances. In this case, I have considered the evidence before me and my own observations.
Although internal works, such as the provision of both a new base and first floor, and insulation to the walls, would not constitute development, these works would not result in a building that is capable of conversion without the substantial new elements proposed in the current appeal.
I, therefore, find that the works required to infill the two open elevations, and to repair the existing blockwork walls, go a long way beyond building operations that are reasonably necessary for the existing building to function as a dwelling. The existing building is, therefore, not suitable for conversion. Indeed, while the proposed dwelling would retain the general appearance of the existing building, I am satisfied that, having regard to the Hibbitt case, the proposal would be more akin to a partial rebuild and new building work, rather than a conversion.
For the above reasons, the proposed development falls outside the scope of permitted development rights under Class Q.1(i). Accordingly, the proposal would not be permitted development.
Section 06
Whether prior approval is required and should be granted
I note the Council’s reasons for refusal included that the location and siting make the building impractical or undesirable for residential use due to its proximity to a farm yard and buildings. However, given my findings above I have not assessed the proposal against Q2 of the Order. I have, therefore, also not considered the occupation condition.
Section 07
Other Matters
[name] saw that the adjacent building was not in use for animal housing or intensive agriculture storage, as it was used for storage of a horse wagon, logs and bales, it could be brought back into agriculture use without any further planning permission. The appellants current use and intended use of the other buildings within the farm would not justify the appeal scheme. 1 APP/D0840/W/18/3208377
Section 08
Conclusion
For the reasons given above, and taking into account all other matters raised, the appeal is therefore dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 4777No official casework-database value to compare
- Extracted decision date · page 1
- 26 March 2026Matches the official casework database
- Extracted site visit dates
- 10 March 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6003012
- Application reference
- DET/2025/0021
- Lead case reference
- Not recorded
- Planning authority
- Staffordshire Moorlands District Council
- Planning authority code
- E07000198
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Other minor developments
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Prior Approval
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 1,500 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- Yes
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- No
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 22 December 2025
- Valid date
- 22 December 2025
- Start date
- 6 January 2026
- Planning authority decision date
- 15 July 2025
- Appeal decision date
- 26 March 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office-s78
- Dataset status
- Current release
- Catalogue record ID
- 86568
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 20 August 2026 at 16:29