Skip to main content
Official casework recordDismissedCurrent release

Appeal 6003224

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

changing the use of a retail premises to a 1-bedroom residential property.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    [name]

    The main issues are: • whether the proposal would provide adequate living conditions for the future occupants of the development, with specific regard to outlook, privacy and outdoor amenity space; and, • whether the proposed development would provide a biodiversity net gain.

  3. Section 04

    Living conditions

    The proposed development involves the change of use of the rear section of a retail premises to a residential unit. The ground floor would comprise a kitchen and lounge area, together with a bathroom and a utility cupboard. During my site visit, it was evident that, following the removal of existing walls and the installation of new partitions, this area would form a long but narrow internal space. It would be served by three windows. However, these windows would face directly onto a tall rear boundary wall and an external staircase, both positioned in close proximity. This arrangement would result in poor outlooks from the ground floor accommodation, falling short of a reasonable standard.

    The upper floor of the appeal site would accommodate a bedroom, with a bathroom positioned to the rear. As a habitable room, the bedroom would be served by a set of patio doors. Beyond these doors are the windows serving the rear elevation of [address]. The Residential Design Guide Supplementary Planning Document 2014 (SPD) establishes minimum separation distances between habitable rooms, specifying a requirement of 21 metres in circumstances such as this. The appeal proposal would fall significantly short of that standard.

    While it is acknowledged that the SPD provides guidance rather than absolute policy, it nonetheless constitutes an important material consideration. Applying my planning judgement, I consider that the markedly short separation distance in this case would give rise to an unacceptable level of overlooking, resulting in a material loss of privacy.

    The SPD also sets out the minimum private amenity space expected for residential development. For a one‐bedroom dwelling, it specifies a requirement of 50 m2. There is no substantive evidence before me to demonstrate that the proposal would meet this standard. As a result, the development would fail to provide an outdoor area of sufficient size to enable occupants to comfortably relax outside or undertake basic activities typically associated with private amenity space, such as drying laundry outside.

    It is suggested that the identified shortcomings could be addressed through design amendments. While that may be possible in principle, the responsibility for presenting an acceptable and policy‐compliant scheme rests with the appellant. I am required to determine this appeal on the basis of the plans that were before the Council at the time of its decision. I acknowledge that the proposal would meet certain requirements, including the minimum internal space standards, which weighs as an absence of harm. However, the scheme fails to comply with the relevant provisions of the SPD in other key respects.

    To conclude, the proposed development would conflict with Policies HG5 and ST1 of the Ashfield Local Plan Review 2002 (LPR), along with the provisions of the National Planning Policy Framework (the Framework). These policies seek for the design and layout of dwellings to minimise overlooking and to provide an adequate garden space. The Framework stipulates at Paragraph 135 (f) that developments should create spaces that have a high standard of amenity for future occupants.

  4. Section 05

    Biodiversity

    The appellant contends that the appeal site is not subject to [name] (BNG) considerations. The reason given for this is that it is a change of use, with all external space in its existing form being hard surfaced, and therefore there is no ecology on site.

    Schedule 7A of the Town and Country Planning Act 1990 (as amended) introduced a statutory framework for BNG, and it applies to all planning applications for non-major development submitted on or after 2 April 2024. Under the statutory framework, subject to some exceptions, every grant of planning permission is deemed to have been granted subject to the [name], which requires that at least a 10% increase in biodiversity value is met.

    The Council refused the proposal on the basis that the application did not identify the value of existing habitats. The Planning Practice Guidance sets out the minimum information requirements for BNG that must accompany a planning application. This includes, amongst other things, a completed biodiversity metric calculation that establishes the pre-development ecological value of the site. Even if this is zero, as contended, this must be established through an evidenced based metric evaluation. Regardless of whether the appellant agrees with this stipulation, it is a mandatory national requirement.

    These requirements allow for consideration of existing habitat baselines for relevant applications so there is a common understanding about the pre-development biodiversity value of the development’s onsite habitat at this stage. In determining an application, it is essential to assess whether any proposed condition relating to BNG could realistically be discharged. In this case, in the absence of key evidence, there is no basis to justify an exception to this established principle.

    In view of the above, the proposal would not comply with the requirements of Schedule 7A of the Town and Country Planning Act 1990, the provisions of the Framework and Policy ST1 of the LPR. This policy requires development to not adversely affect the quality of the environment.

  5. Section 06

    Planning Balance

    The parties note that the Council cannot demonstrate a five-year housing land supply. As such, Paragraph 11 of the Framework states that development plan policies which are most important for determining the application should be considered out of date. As there are no relevant policies protecting areas or assets of particular importance in this case, the requirements of Paragraph 11di)ii of the Framework therefore apply.

    I have found conflict with Policies ST1 and HG5 of the LPR on the two main issues of this appeal. On that basis, I conclude that there is conflict with the development plan as a whole. These policies are in general conformity with the aims of the Framework and therefore, I attribute significant weight to these policies.

    The Framework refers to significantly boosting the supply of housing. One additional unit, for a one-bedroom property, would make a small contribution to the currently low supply in Ashfield. Although this would indeed be a very small contribution, in an era of national, and in this case, local housing shortages, every home matters. This attracts considerable weight in my balance of the appeal scheme.

    However, the proposal would fail to provide adequate living conditions for its future occupant, nor would it satisfy the national requirements relating to BNG. In considering the first main issue, I fully acknowledge the clear and pressing need for housing. Nevertheless, such provision must be delivered in a manner that ensures acceptable living conditions for those who will reside there. The degree of harm I attribute to this issue is not outweighed by the absence of a five‐year housing land supply in Ashfield.

    When assessed against the policies in the Framework when taken as a whole, the adverse impact in relation to the living conditions of the future occupants of the proposal and the failure to provide the mandatory requirements into BNG related matters, this harm would significantly and demonstrably outweigh the benefits of the scheme.

  6. Section 07

    Conclusion

    For the reasons given above, I conclude that the proposal would conflict with the development plan as a whole and there are no material considerations that indicate that the development should be determined otherwise than in accordance with it. Therefore, the appeal should be dismissed. [planning inspector] INSPECTOR

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 4No official casework-database value to compare
    Extracted decision date · page 1
    17 April 2026Matches the official casework database
    Extracted site visit dates
    14 April 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6003224
Application reference
V/2025/0477
Lead case reference
Not recorded
Planning authority
Ashfield District Council
Planning authority code
E07000170

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Change of use
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Planning Appeals - Full
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
1,000 m²
Number of residences
Not recorded
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
3 January 2026
Valid date
3 January 2026
Start date
21 January 2026
Planning authority decision date
15 October 2025
Appeal decision date
17 April 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
87533
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29