Skip to main content
Official casework recordDismissedCurrent release

Appeal 6003309

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as the redevelopment of the site to create first floor level; conversion of dwelling to 5 flats (4 x 1 bed and 1 x 2 beds); parking; communal rear garden; boundary treatment; landscaping; bin / cycle storage; alterations to vehicle access; external alterations (demolition of front extension and bay window; attached garage, shed and outbuilding).

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    Since the determination of this application, the London Borough of Harrow Local Plan 2021-2041 (2026) (the Local Plan) has been adopted and now forms the adopted local plan. As such, the [name] (2012) and the Development Management Policies (2013) have been superseded, and I have determined the appeal on this basis. The relevant policies have not materially changed, and as such I am satisfied that no party’s interests have been prejudiced.

  3. Section 04

    Background and main Issue

    Whilst the reason for refusal within the decision notice makes reference to the character of the area, the Council confirm within their appeal statement that the sole reason for refusal relates to the effect on family sized homes.

    Therefore, the main issue is the effect of the proposal on the supply of family sized homes.

  4. Section 05

    Reasons

    The appeal property forms a detached single storey dwelling with a footprint of approximately [address] metres. The proposal would extend the existing dwelling, converting it to five individual flats of between one and two bedrooms, each with a gross internal floor area (GIA) of between 50 and [address] metres.

    Policy HO2 of the Local Plan seeks to ensure that residential conversions into multiple homes do not have a detrimental impact on the stock of family sized housing. The policy requires proposals for the conversion of family sized homes into smaller self-contained residential units to provide at least one family sized home with a GIA of at least [address] metres and be capable of providing a 3- bedroom, 4-person dwelling.

    Whilst the existing dwelling may only have two bedrooms, it is significantly above the [address] metre GIA Policy HO2 identified as a family sized dwelling, and would therefore likely be capable of providing at least three bedrooms. The proposal would therefore result in the loss of a family sized dwelling. Given the proposed flats are notably below the required [address] metre GIA for a family sized dwelling, the appeal development would not mitigate this loss.

    For the above reasons, the proposal would have an unacceptable effect on the provision of family sized homes and therefore conflict with Policy HO2 of the Local Plan.

  5. Section 06

    Other Matters

    The proposal would result in five dwellings on a small brownfield site, within a sustainable location close to shops and services, providing acceptable parking levels and living conditions for future occupiers, and replacing impermeable surfaces with permeable ones including opportunities for planting. Further, there would be some economic benefits during the construction phase and for local businesses from future occupiers. Nonetheless, these benefits do not outweigh the above identified harm to the supply of family sized homes.

    Whilst the proposal may not harm the living conditions of neighbouring occupiers, a lack of harm is not a benefit and therefore weighs neither for nor against the proposal.

    The appellant raises the time taken for the Council to determine the application, however this is a procedural matter and not something I can consider as part of this appeal.

  6. Section 07

    Conclusion

    Paragraph 38(6) of the Planning and Compulsory Purchase Act 2004 requires that applications for planning permission be determined in accordance with the development plan unless material considerations indicate otherwise. I have weighed the considerations in favour of the appeal proposal against the policy conflicts I have identified. As a result, I find that the other considerations do not outweigh the policies of the development plan and therefore the appeal should be determined in accordance with its policies.

    The appeal is therefore dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 5960No official casework-database value to compare
    Extracted decision date · page 1
    5 May 2026Matches the official casework database
    Extracted site visit dates
    17 April 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6003309
Application reference
PL/1975/24
Lead case reference
Not recorded
Planning authority
London Borough of Harrow
Planning authority code
E09000015

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Other minor developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Planning Appeals - Full
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
1,000 m²
Number of residences
5
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
6 January 2026
Valid date
6 January 2026
Start date
21 January 2026
Planning authority decision date
6 January 2026
Appeal decision date
5 May 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
88259
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29