Appeal 6003392

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

erection of a first floor side extension and the extension of the rear dormer to provide an internal domestic mobility lift.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Appeal Procedure and [name]

    The site visit was undertaken by a representative of the Inspector whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal scheme. The main issues in regard to which are a) whether it would be inappropriate development in the Green Belt; it’s effect on b) the openness of the Green Belt and c) the character and appearance of the area; and d) whether any harm by reason of inappropriateness, and any other harm, would be clearly outweighed by other considerations, so as to amount to the very special circumstances required to justify the proposal.

  3. Section 04

    Inappropriate Development

    Paragraph 154 of the National Planning Policy Framework (the Framework) states that development in the Green Belt is inappropriate subject to a number of exceptions. These include the extension or alteration of a building provided that it does not result in disproportionate additions over and above the size of the original building. Policies DP10 and DP13 of the Tandridge District Local Plan Part 2: [name] 2014-2029 (2014) (LPP2) set out similar provisions.

    For the purposes of Policy DP13, and in the case of an extension or alteration to an existing dwelling, the ‘original building’ is taken to be the dwelling as it existed on 31 December 1968 or, if constructed after 1968, as it was built originally. The Framework defines the date of an ‘original building’ as 1 July 1948, or as originally built if constructed after that date. Nevertheless, the LPP2 policies are broadly consistent with the Framework.

    The Framework does not define what disproportionate might be. The justification to DP13 suggests a pragmatic approach and that each proposal will be judged on its individual merits, taking into account the size of the original building, the bulk, height, mass and prominence of the extension and its impact on the openness of the Green Belt.

    The dwelling has previously been extended. The appellant calculates that the proposed first floor and rear dormer extensions would result in the volume of the dwelling being extended over and above the ‘original building’ by approximately 86%. The Council does not dispute this figure. The appellant additionally states that the proposal would represent an approximately 3.7% increase in volume over the existing dwelling.

    The Council accepts that the extensions would introduce a relatively small increase in volume, without any increase in footprint. However, the agreed calculation indicates that the appeal dwelling has been very substantially extended over time. Although the proposal would add only a modest amount of additional volume, its form and proportions would nonetheless appreciably add to the building’s overall bulk and mass. When taken together, the sum total of existing and proposed extensions would represent disproportionate additions to the original building.

    Consequently, the appeal scheme would be inappropriate development within the Green Belt as defined by the Framework. It would also conflict with Policies DP10 and DP13 of the LPP2, which together with the Framework, advise that inappropriate development is, by definition, harmful to the Green Belt.

  4. Section 05

    Openness

    The Government attaches great importance to the Green Belt. Two of its key components are its openness and permanence. Openness can be perceived spatially and visually.

    By extending upwards over the existing catslide roof and enlarging the bulk of the rear dormer, the proposal would occupy areas of the site which are currently undeveloped, thereby diminishing its spatial openness. The first floor element would be seen from the road as having a greater height and massing than the existing catslide feature. Overall, there would be a plainly noticeable reduction in Green Belt openness in both aspects. This would result in further harm thereto as well as that arising from the scheme’s inappropriateness resulting, accordingly, in further conflict with the Green Belt protection aims of the Framework and the aforementioned development plan policies.

  5. Section 06

    Character and Appearance

    The appeal site comprises a detached dwelling positioned towards the end of a no-through road, occupying an elevated position within a sharply sloping plot that rises above its approach. [address] Peak is positively characterised by the individuality of its dwellings within a mature spacious setting, while maintaining a coherent identity through shared architectural features and a consistent palette of traditional materials.

    The existing shallow-pitched rear dormer is wide, however its massing and overall presence is currently mitigated through its discreet containment within the central section of the dwelling’s roof, separated from the side catslide feature. Extending the dormer fully across to the building’s flank elevation would significantly increase its impact, in doing so unbalancing and dominating the rear elevation through its sheer breadth. It would also create an awkward junction with the side hipped slope to the new first floor addition’s roof.

    Although it would remove the catslide, the first floor extension would nevertheless appear suitably subordinate to the existing dwelling when viewed from the front. The use of matching materials throughout would also be appropriate. The resultant box-like, clumsy form where the two extensions intersect towards the rear would however be perceptible in more angled views. While the property benefits from a good degree of natural boundary screening, limited wider visibility does not obviate the need to achieve high quality design that positively responds to its context.

    Due to differences in their individual design, size, positioning and spatial relationship with their host dwelling, neither scheme at Nos 17 nor [address] Peak are sufficiently comparable to the appeal proposal. Thus, they do not lead me to a different conclusion on this issue.

    The proposal would have a harmful effect on the character and appearance of the area. It would conflict with Policy DP7 of the LPP2 and Policy CP18 of the Tandridge District Core Strategy (2008). These policies, amongst other things, expect new development to be of a high-quality design which integrates with its surroundings and reflects and respects existing character, setting and local context.

  6. Section 07

    [name]

    In reference to the appellant’s evidence concerning their own health issues, I have had due regard to the Public Sector Equality Duty set out under Section 149 of the Equality Act 2010. Article 8 of the Human Rights Act is also engaged as the proposal could affect the health, wellbeing or quality of life of persons within their home.

    The appeal scheme would enlarge an existing bedroom, with the plans also indicating the installation of a mobility lift within the newly extended part of the dwelling. By enhancing the existing accommodation to better meet the appellant’s needs, I have no reason to doubt that the proposal would provide a benefit to their living conditions. This is a personal circumstance to which I afford weight in favour of the appeal.

    Nevertheless, there is no sufficiently conclusive evidence to demonstrate that the appellant’s requirements cannot be met through alternative measures, for example an alternative location for the mobility lift, which might have a lesser impact than the appeal scheme. I am also mindful that personal circumstances and ownership of land can change, but the effect of the development would be permanent. Thus, dismissing the appeal would be justified and proportionate in this case, as it would protect the wider public interest in terms of the Green Belt and the character and appearance of the host dwelling and area.

    No harm has been demonstrated with regard to the effect of the proposal upon neighbouring living conditions. This is a neutral matter which would not weigh in favour of the scheme.

  7. Section 08

    Conclusion and Recommendation

    The proposal would be inappropriate development in the Green Belt and unacceptably reduce its openness. These matters, as Green Belt harms, are worthy of substantial weight. There would also be harm to the character and appearance of the area. Overall, the factors weighing in support of the proposal do not attract sufficient weight to clearly outweigh them. As a result, the very special circumstances necessary to justify the development do not exist.

    The proposal conflicts with the development plan and there are no material considerations, including the Framework, that indicate that a decision should be made otherwise than in accordance with it. I therefore recommend that the appeal should be dismissed.

  8. Section 09

    Inspector’s Decision

    I have considered all the submitted evidence and my representative’s report and on that basis the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 1895No official casework-database value to compare
    Extracted decision date · page 1
    10 June 2026Matches the official casework database
    Extracted site visit dates
    12 March 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6003392
Application reference
TA/2025/1127
Lead case reference
Not recorded
Planning authority
Tandridge District Council
Planning authority code
E07000215

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Householder
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
1,487 m²
Number of residences
Not recorded
Site in Green Belt
Yes
Agricultural holding
Not recorded
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
8 January 2026
Valid date
8 January 2026
Start date
12 January 2026
Planning authority decision date
9 December 2025
Appeal decision date
10 June 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office
Dataset status
Current release
Catalogue record ID
90157
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21