Skip to main content
Official casework recordDismissedCurrent release

Appeal 6003499

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

pedestrian gate, double drive gate and fence measuring 1.8 metres tall and a total length of 7 metres at the front of property.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    I have made some very slight changes to the description of development within the banner heading to limit that wording to the description of development only.

    At the time of my site visit the fence and gates were already in place at the property and broadly accorded with the plan that is before me.

  3. Section 04

    [name]

    The main issues are the effect of the gates and fence on the character and appearance of the area and on highway safety.

  4. Section 05

    Character and appearance

    [address] is a residential cul-de-sac which is set back from the main road through Beeford. Front boundary treatment within the immediate area, where constructed, is broadly formed of low fencing or walls. Other front boundary treatment is formed via hedges which were generally at a low height at the time of my site visit although the neighbouring property to the appeal site had a tall hedge to the front.

    I note that the evidence indicates that the frontage to the appeal site was previously formed of a tall hedge. There is a boarded timber fence opposite the appeal site which is of similar height to the fence and gates in place at the appeal site although this forms the side boundary of No. [address] (No.7) and not the front boundary.

    The appeal property is set back from the main street, well within the cul-de-sac. However, the gates and fencing form tall, solid and enclosing features within [address] by reason of their height and solidity which creates a sense of enclosure within this section of the street and which is at odds with other parts of [address].

    East Riding Council has a clear and up to date Design Code1 (DC) which states that boundary treatments for residential properties fronting public realm must not exceed 1.2m in height, citing concerns amongst other things around enclosure and natural surveillance.

    It advises that where there are existing boundary features within an established street which exceed 1.2 metres, a justification for a higher boundary may be acceptable. However, the fence and gates have enclosed the whole of the public facing frontage in a manner which does not allow for any element of overlooking or natural surveillance. The taller fence across the street does not therefore provide justification given that the frontage of that property caters for overlooking and natural surveillance to and from that dwelling.

    The fence and gates therefore have an adverse impact on the character and appearance of the area. The scheme conflicts with Policy ENV1 of the East Riding Local Plan Update (2025) (LP) which amongst other things states that development will be supported where it achieves a high quality of design, which contributes to a sense of place and beauty, including by having regard to the specific characteristics of the site’s wider context and the character of the surrounding area and including by having an appropriate scale and height. There would also be conflict with the DC.

  5. Section 06

    Highway safety

    Whilst the plans indicate that the gates open inwards, the height and solidity of the gates and fencing mean that anyone driving out from behind the fence and gates would have very limited visibility of anyone who may be using the footway on [address].

    I accept that use of the footpath is likely to be limited given there are two properties at the head of the cul-de-sac and given that road conditions are likely to be quiet such that pedestrians may choose to use the carriageway instead.

    Nonetheless, the height of the fence is such that it could lead to conflict between drivers exiting the gates and pedestrians using the footpath such that there is a material detriment to highway safety as a result of the proposal. This is again a point made out clearly within the DC, which states that high boundary features next to accesses can reduce visibility for those leaving the plot. The taller fence to the side of No.[address] to the driveway entrance.

    The fence and gates therefore have a detrimental impact on highway safety. The scheme subsequently further conflicts with Policy ENV1 of the LP which amongst other things states that development will be supported where it achieves a high quality of design including by minimising highway safety risks. There would again be conflict with the DC. I have not found direct conflict with Policy EC4 of the LP and the effect of the proposal on access and egress if all parking spaces in the front garden were occupied are not clear from the evidence before me. 1 [name] – April 2025 – [name] of Yorkshire Council p111.

  6. Section 07

    Planning Balance and Conclusion

    The fence and gates conflict with the development plan and there are no considerations which indicate that a decision should be made otherwise than in accordance with it. The appeal should therefore be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 6752No official casework-database value to compare
    Extracted decision date · page 1
    27 April 2026Matches the official casework database
    Extracted site visit dates
    15 April 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6003499
Application reference
25/01794/PLF
Lead case reference
Not recorded
Planning authority
East Riding of Yorkshire Council
Planning authority code
E06000011

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Householder
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
341 m²
Number of residences
Not recorded
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
12 January 2026
Valid date
20 January 2026
Start date
29 January 2026
Planning authority decision date
24 October 2025
Appeal decision date
27 April 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office
Dataset status
Current release
Catalogue record ID
87895
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21