Skip to main content
Official casework recordAllowedCurrent release

Appeal 6003526

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

erection of 33No. external self-storage units (Class B8), refuse store, cycle shelter and reconfiguration of car parking layout without complying with a

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for the erection of 33No. external self-storage units (Class B8), refuse store, cycle shelter and reconfiguration of car parking layout at [site address] in accordance with the application [name]/1367/25 without compliance with condition 2 previously imposed on the planning permission [name]/0671/25 dated 9/9/25 subject to the conditions in the attached schedule.

  2. Section 03

    Background and Main Issue

    The appeal site includes a warehouse used for storage, as approved some ten years ago (the original use scheme)1. It is part of the Shoreham Harbour Regeneration Area (SHRA) which is designated for comprehensive redevelopment as set out in the Adur Local Plan (2017) (the Local Plan) and the Joint Area Action Plan (2019) (the JAAP).

    In recent years the Council resolved to approve the replacement of the warehouse with an 8 storey building comprising 62 residential units and commercial floor space2 (the mixed-use scheme), although ultimately the permission was not granted. 1 Application Ref AWDM/0099/16. 2 Application Ref AWDM/0886/23.

    More recently, permission was granted for the renovation of the warehouse and wider site3 (The renovation scheme). This is to support the appellant’s storage business and has since been commenced. After that, permission was granted for the erection of 33no. external self-storage units and other associated works on the land around the warehouse (the units scheme). By virtue of the disputed condition No 2 this was a temporary permission until September 2030. The appeal scheme seeks to remove this condition.

    The main issue in the appeal is whether the condition is reasonable or necessary to avoid prejudicing future opportunities for redevelopment of the appeal site.

  3. Section 04

    Reasons

    JAAP Policy SH3 states, at point (3), that prior to a site coming forward for redevelopment a temporary planning permission may be granted for the ‘continuation of current employment uses’. Similar language is used in the preamble to Local Plan Policy 8. The appellant emphasises that the units scheme did not seek permission for a continued employment use, which would have been unnecessary given the original use scheme, and contends that the policies were not, therefore, applicable.

    Point (3) of Policy SH3 sets out some circumstances in which temporary permissions may be considered; it does not suggest they are the only circumstances in which that approach may be taken. As a result, even if I accept that point (3) was not pertinent to the units scheme, that would not make a temporary permission inappropriate. Nor would it demonstrate an absence of conflict with the development plan policies referenced by the Council.

    Support for the JAAP is set out in the Local Plan. The appellant makes no argument that their storage use is consistent with the JAAP. To grant planning permission for permanent development within the SHRA which does not support the JAAP could undermine the latter by making it less likely that the site in question comes forward for redevelopment. As such, there is potential for conflict between the appeal scheme and the development plan, even though the units scheme did not involve the continuation of a current employment use.

    I now turn to consider (firstly) whether the site might reasonably be expected to come forward and (secondly), what difference the units scheme would make.

    On the first point; The Council accepts that the appellant is the freeholder of the land and intends to undertake the storage use for the long term. It does not contest that significant sums have been committed to the purchase of the land and to the renovation scheme.

    The Council wishes to assess the position again in 2030, but has provided me with no real reason to doubt the appellant’s position that, come that time, they will still be committed to the storage use at the site. The facts of the matter, particularly the degree of investment, do little to cast doubt on this.

    Whilst JAAP Policy SH3 sets out, at point (2), an intention to aid the relocation of existing occupiers displaced by new development in the SHRA, I have nothing before me to suggest that even exploratory discussions over relocating the 3 Application Ref AWDM/0305/25. appellant’s business have occurred. Overall, I see little reason to think that the site is likely to come forward or that the position is likely to be different in 2030.

    On the second point; It is central to the appellant’s case that the units scheme has little effect on their commitment to the storage use in the long term. I have all but nothing from the Council to counter this. Indeed, it tells me that a “permanent planning permission for the storage units would significantly reduce and hinder the likelihood that comprehensive regeneration would be delivered within the plan period” but does not tell me why it believes this to be the case, given the context described above.

    I recognise that the mixed-use scheme demonstrates what may be possible at the site. [name] have been given no indication of the value of the land if redevelopment were approved, I cannot discount the prospect that the appellant may cease the storage use despite having invested so heavily in it. That does not, however, show me that the units scheme would be a determinative factor in such a

  4. Section 05

    decision.

    The submissions do not suggest the units require a time consuming or complex construction process, nor give me reason to disagree with the Council’s observation that they would be easy to remove. I see little reason, therefore, to feel that the expense of erecting or removing the units would be so significant as to affect the chances of the site coming forward for redevelopment.

    The units could provide financial gain which, in turn, may reduce any chance of the appellant relocating. However, at some 8% of total storage floorspace at the site they would be a modest contributor to a business which appears viable regardless. Indeed, it is clear from the Council’s planning report that it does not associate the anticipated longevity of the business with the provision of the units. Overall, I see no reason to feel that the units would make it less likely that the site comes forward for redevelopment, given the context.

    The evidence before me does not demonstrate that the condition is reasonable or necessary to avoid prejudicing future opportunities for redevelopment of the appeal site.

  5. Section 06

    Conditions

    The Planning Practice Guidance makes it clear that decision notices for the grant of planning permission under section 73 should also restate the conditions imposed on earlier permissions that continue to have effect. [name] have no argument before me that the other conditions imposed on the units scheme planning permission are no longer appropriate, I shall impose all those that I consider remain relevant. In the event that some have in fact fallen away or been discharged, that is a matter which can be addressed by the parties. The units scheme permission did not include the standard time limit condition, so I have attached it.

  6. Section 07

    Conclusion

    For the reasons given above the appeal is allowed.

  7. Section 08

    Schedule of Conditions

    The development hereby permitted shall begin not later than three years from the 9 September 2025.

    The development hereby permitted shall be carried out in accordance with the following approved plans: FLOOD RISK ASSESSMENT & [name] 29141 ISSUE 01 [name] 2025-5313 SITE LOCATION PLAN DR-A-000 P1 EXISTING SITE PLAN DR-A-006 P0 [name]-005 P2 PROPOSED SITE PLAN DR-A-007 P3 [name] [name]-202 P4

    No operations or working shall take place on the site except between the hours of 7am and 9pm on any day.

    No external lighting shall be installed unless and until details have been submitted to and approved in writing by the Local Planning Authority. All external lighting shall be switched off within 30 minutes of the end of the operating hours set out in Condition 3 and shall not be switched on again until within 30 minutes before the re-opening of the store.

    The roller shutter doors on the self-storage units hereby approved shall be maintained regularly to ensure they do not create excessive noise.

    Construction shall not begin until a detailed surface water drainage scheme for the site has been submitted to and approved in writing by the Local Planning Authority. The surface water drainage scheme must prioritise the use of source control [name] (SuDS) in consideration of the [name] for SuDS and demonstrate no increase in flood risk as a result of the Proposed Development with sufficient supporting evidence provided to support its viability including supporting calculations for the 100% AEP (1 in 1 year), 3.33% AEP (1 in 30 year), 3.33% AEP (1 in 30 year) plus climate change, the 1% AEP (1 in 100 year) and the 1% AEP (1 in 100) plus climate change critical storms. The scheme shall subsequently be implemented in accordance with the approved details before the development is completed.

    The development hereby approved shall not be occupied until details of the maintenance and management of the sustainable drainage scheme have been submitted to and approved in writing by the Local Planning Authority. The drainage scheme shall be implemented prior to the first occupation of the development hereby approved and thereafter managed and maintained in accordance with the approved details in perpetuity. The Local Planning Authority shall be granted access to inspect the sustainable drainage scheme for the lifetime of the development. The details of the scheme to be submitted for approval shall include: I. a timetable for its implementation. II. details of SuDS feature and connecting drainage structures and maintenance requirement for each aspect including a drawing showing where they are located. III. a management and maintenance plan for the lifetime of the development which shall include details of design life and the arrangements for adoption by any public body or statutory undertaker, or any other arrangements to secure the operation of the sustainable drainage scheme throughout its lifetime. This will include the name and contact details of any appointed management company.

    No development shall take place, including any works of demolition, until a Construction Management Plan has been submitted to and approved in writing by the Local Planning Authority. Thereafter the approved Plan shall be implemented and adhered to throughout the entire construction period. The Plan shall provide details as appropriate but not necessarily be restricted to the following matters: • the anticipated number, frequency and types of vehicles used during construction, • the method of access and routing of vehicles during construction, • the parking of vehicles by site operatives and visitors, • the loading and unloading of plant, materials and waste, • the storage of plant and materials used in construction of the development, • the erection and maintenance of security hoarding, • the provision of wheel washing facilities and other works required to mitigate • the impact of construction upon the public highway (including the provision of temporary Traffic Regulation Orders), • details of public engagement both prior to and during construction works.

    Work to implement this permission shall not take place other than between the hours of 8am and 6pm Monday to Friday and 8.30am and 1pm on Saturdays. There shall be no working on Sundays or Public Holidays.

    The development hereby permitted shall be completed using the external materials and finishes specified in the application unless otherwise approved in writing by the Local Planning Authority.

    No development shall commence until details of the proposed surfacing material for the site has been submitted to and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details.

    No part of the development shall be first occupied until the car parking has been constructed in accordance with the approved site plan. These spaces shall thereafter be retained at all times for their designated purpose.

    No works or development shall take place until full details of all soft landscaping works and the proposed times of planting have been approved in writing by the Local Planning Authority and all soft landscape works shall be carried out in accordance with those details and at those times. Any plants which within a period of five years from the time of planting die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species unless the Local Planning Authority gives written consent to any variation.

    Prior to commencement of the development hereby approved the following components of a scheme to deal with the risks associated with contamination of the site shall each be submitted to and approved in writing by the Local Planning Authority, if ground works are proposed:- (1) A preliminary risk assessment which has identified:- • all previous uses • potential contaminants associated with those uses; • a conceptual model of the site indicating sources, pathways and receptors; and potentially unacceptable risks arising from contamination at the site. (2) A site investigation scheme, based on (1) above to provide information for a detailed assessment of the risk to all receptors that may be affected, including those off site. (3) The site investigation results and the detailed risk assessment (2) and, based on these, an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. (4) A verification plan providing details of the data that will be collected in order to demonstrate that the works set out in (3) are complete and identifying any requirements for longer-term monitoring of pollutant linkages, maintenance and arrangements for contingency action. Any changes to these components require the express consent of the Local Planning Authority. The scheme shall be implemented as approved above and, prior to commencement of any construction work (or such other date or stage in development as may be agreed in writing with the Local Planning Authority), a [name] demonstrating completion of the works set out in the approved remediation strategy and the effectiveness of the remediation shall be submitted to and approved in writing by the Local Planning Authority. The report shall include results of sampling and monitoring carried out in accordance with the approved verification plan to demonstrate that the site remediation criteria have been met. It shall also include any plan (a 'long-term monitoring and maintenance plan') for longer-term monitoring of pollutant linkages, maintenance and arrangements for contingency action, as identified in the verification plan, and for the reporting of this to the Local Planning Authority. Schedule Ends

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 5473No official casework-database value to compare
    Extracted decision date · page 1
    8 April 2026Matches the official casework database
    Extracted site visit dates
    18 March 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6003526
Application reference
AWDM/1367/25
Lead case reference
Not recorded
Planning authority
Adur District Council
Planning authority code
E07000223

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Other minor developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Removal or Variation of Conditions
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
3,568 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
12 January 2026
Valid date
12 January 2026
Start date
26 January 2026
Planning authority decision date
16 December 2025
Appeal decision date
8 April 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
87122
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21