Skip to main content
Official casework recordDismissedCurrent release

Appeal 6003614

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as ‘erection of 1 x self build bungalow dwelling following demolition of existing stables and vehicle workshop.’

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    The proposal is for permission in principle (PiP). The Planning Practice Guidance (PPG) advises that this is an alternative way of obtaining planning permission for housing-led development. The PiP route has two stages: the first stage (or permission in principle stage) establishes whether a site is suitable in-principle, and the second ‘technical details consent’ stage is when the detailed development proposals are assessed. This appeal relates to the first of these two stages.

    The scope of considerations for PiP is limited to location, land use and the amount of development. All other matters are considered as part of a subsequent technical details consent (TDC) application if PiP is granted. As such, I have treated the plans of the dwelling as indicative only.

    The site lies within the High Weald National Landscape (NL) and I am required to give great weight to conserving and enhancing the natural beauty of the NL. However, this is not a matter in dispute between the parties and from the evidence before me, I have no reason to disagree. As such I do not need to deal with this matter further.

    The appeal site lies within the zone of influence (ZOI) of the Ashdown Forest Special Protection Area (SPA) and the Ashdown Forest Special Area of Conservation (SAC). Both are designated European habitat sites protected under the Conservation of Habitats and Species Regulations 2017 (the Habitat Regulations), which I refer to collectively as ‘the habitat sites’ hereafter.

  3. Section 04

    [name]

    The main issues are: • the effect of the proposal on the integrity of the habitats sites; and • whether the site is a suitable location for a residential dwelling, having regard to the spatial strategy and its accessibility to services and facilities.

  4. Section 05

    Habitat sites (including Appropriate Assessment)

    Article 5B (1) of the Town and Country Planning (Permission in Principle) Order 2017 (as amended) (hereafter the Order) states that PiP cannot be granted for development which is habitats development. This is defined in Article 5B (5) of the Order as development which is likely to have a significant effect on a qualifying European site1, either alone or in combination with other plans and projects, and is not directly connected with or necessary for the management of the site. If a proposed PiP development is likely to have a significant effect on a qualifying European site without any mitigating measures in place, an Appropriate Assessment (AA) must be undertaken by the competent authority to establish whether the development would adversely affect the integrity of the protected site. If the outcome of the AA is unfavourable, it would preclude the granting of PiP.

    Policy WCS12 of the Wealden District Core Strategy Local Plan (2013) (CS) seeks to protect Ashdown Forest SPA and SAC by reducing the recreational impact of visitors from new housing development. Additionally, it seeks to reduce associated nitrogen emissions emanating from the increased number of vehicles in its vicinity. Amongst other things, saved Policies EN1 and EN15 of the Wealden Local Plan 1998 (WLP) seek to pursue sustainable development, through considering location and assessing the effects of proposals on the environment, and to safeguard protected areas, including Ashdown Forest, having regard to their status, securing conditions and/or planning obligations to provide appropriate compensatory measures.

    The SAC includes one of the largest continuous blocks of lowland heath in south-east England supporting various species of flora and fauna, including European dry heaths and [name] wet heath. The conservation objectives are to ensure the favourable conservation status of its qualifying features including by maintaining and restoring qualifying habitats. The main threat to the SAC relates to air pollution, related to the increase in traffic in its vicinity from visitors.

    The evidence before me indicates that both Natural England and the Council are content that this level of development either alone or cumulatively, would not adversely affect the integrity of the SAC regarding air quality, and that no mitigation is necessary. In light of this, as the competent authority in this appeal, I have no reason to reach a different view. As such, I am satisfied that a likely significant effect on the SAC can be ruled out.

    The SPA is an extensive area of common land comprising a mosaic of wet and dry heath, valley bog and woodland, supporting uncommon plants and a rich invertebrate fauna. Its qualifying features are the [name] and [name], both species of breeding birds. The conservation objectives for the SPA are to ensure that the integrity of the site is maintained or restored as appropriate, and to ensure that the site contributes to achieving the aims of the [name]. The main threats to the SPA are through development pressures and 1 As defined by regulation 8 of the Conservation of Habitats and Species Regulations 2017 (as amended). additional recreational disturbance, resulting in damage and disturbance to the bird’s habitat.

    The proposal would create a net gain of one dwelling and, in combination with other developments permitted in the area, there would be a likely significant adverse effect on the SPA.

    My attention is drawn to the Ashdown Forest SPA Mitigation Zone Background Paper (2019) and the Ashdown Forest SPA Strategic Access Management and Monitoring Strategy Tariff Guidance (2019). These set out a strategic approach to mitigation by pooling tariff style financial contributions made per dwelling, towards a range of mitigation and avoidance measures. The strategy includes the provision of Suitable Alternative Natural Greenspace (SANGS) to provide an alternative destination for visitors and a programme of [name] and Mitigation (SAMM) as well as monitoring.

    It is clear that the contributions towards the SANGS and SAMMS are necessary to mitigate adverse impacts, which would be used towards supporting an alternative recreational destination and thereby relieving pressure from the SPA, an approach supported by Natural England.

    The SAMM Strategy Tariff Guidance requires mitigation to be secured prior to the determining of a planning application, and in the case of a PiP, it is the granting of the TDC which has the effect of granting planning permission for the development. However, in these circumstances, the PPG is clear that PiP can only be granted if, after taking account of mitigation measures in the AA, a decision-maker concludes the development would not adversely affect the integrity of the habitat sites. To come to such a conclusion, I must be satisfied beyond all reasonable scientific doubt that any adverse effect on the integrity of the habitat sites would be avoided.

    This means there must be certainty that any necessary mitigation would be delivered. I note the appellant is inclined to deal with the mitigation at TDC stage. However, in carrying out this AA, I must take a precautionary approach. In the absence of an effective mechanism before me through which the payment of the tariff could be secured, I do not have the necessary certainty that any adverse effects on the integrity of the habitat sites would be avoided. A condition would not be appropriate in this situation. Furthermore, no legal agreement or undertaking is before me to include the mitigation provisions with the trigger for its delivery linked to the associated TDC.

    Imperative reasons of overriding public interest of a social or economic nature are not present that would be sufficient to overcome the harm that would be caused to the habitat site. In the absence of any mitigation, the proposal for a new dwelling would be likely to increase recreational pressure, and thus would, in combination with other plans and projects, have a likely significant effect on the integrity of the SPA. Therefore, I must conclude that the proposed dwelling would have an adverse effect on the SPA, contrary to the Habitats Regulations. The proposal would also be contrary to CS Policy WCS12 and [name] EN1 and EN15, the objectives of which, I have already outlined above.

    As the outcome of the AA is unfavourable, irrespective of the merits of the scheme, it is exempted from qualifying for PiP. Consequently, it follows that PiP cannot be granted. Nevertheless, for completeness, I will now consider the other matter in dispute. Suitable location - Spatial strategy

    A strategic approach to development is set out in the CS which focuses development towards the ‘Primary centre’, which sits at the top of the district’s seven tier settlement hierarchy and has the infrastructure to support growth.

    The appeal site relates to a small holding which, amongst other things, contains a modest sized open fronted agricultural structure within the [site address] site, to the north of [site address] , Hurstwood. Located outside of any defined settlement boundaries, the appeal site lies within the open countryside.

    The nearest settlement is said to be [name], a ‘Neighbourhood centre’ within the sixth tier of the settlement hierarchy. It is defined in the CS as a settlement ‘with limited, basic or no facilities but with access to another centre, or a settlement with facilities but poor accessibility or access only to a service or local centre’. Crowborough lies further afield. This is a third tier ‘District centre’ settlement and according to CS Policy WC32, is expected to contribute to housing development during the plan period.

    CS Policy WCS6 sets out a rural area’s strategy. It contains 4 tiers of rural settlements expected to accommodate a proportion of growth over the plan period. [name] is not named in this policy as a settlement expected to contribute to growth. Moreover, development in the open countryside is strictly controlled by Policies GD2 and DC17 of the WLP, unless it accords with other specific policies of the plan. I have not been pointed to any other policies that it conforms with, bringing the scheme into conflict with them.

    Despite the age of these policies, they remain broadly consistent with the objectives of the National Planning Policy Framework (the Framework) insofar as they seek to direct development to the most sustainable locations, reduce the need to travel and protect the countryside from inappropriate sporadic development. - Accessibility

    WLP Policy EN1 is clear that the Council will pursue sustainable development, having regard to principles in government guidance and its own strategies for the environment, in considering the location of development. Furthermore, [name] SP07, seeks to encourage the reduction of the need to travel by car by concentrating development where it can most closely relate to public transport opportunities, and by making it easier to travel by more sustainable modes of transport. These policies align with the thrust of the Framework which highlights that priority should be given first to pedestrian and cycle movements, and second to facilitating access to high quality public transport.

    While the site is not isolated given the presence of a neighbouring dwelling to the east, it would be relatively remote from the services and facilities upon which future occupants would rely. There is dispute between the parties over the distance from the site to Crowborough, a ‘District centre’ containing a range of services and facilities, including public transport which is not reliant on other centres within the district to meet residents’ day-to-day needs. The appellant indicates the distance is around 2.5km but the Council suggest the distance exceeds 4.5km to the centre.

    Irrespective of the exact distance, the site is in a distinctly rural location. Access to facilities in Crowborough that would meet residents’ day‐to‐day needs would be highly likely to occur by private car, given the absence of public transport connections and the hilly, winding nature of the country lanes leading to the site, which are subject to the national speed limit and devoid of footpaths and streetlighting. These factors would be strong deterrents to the use of more sustainable transport modes.

    Given the remoteness of services and facilities, the proposal would make only a very limited contribution to maintaining or enhancing the vitality of the rural community. The site therefore does not occupy a location supported by Paragraph 83 of the Framework.

    The lack of accessibility of the location compared to services and facilities is not a matter that could be adequately mitigated by condition. I acknowledge that opportunities to maximise sustainable transport solutions will vary between urban and rural areas and the proposal is not a significant development. Nevertheless, the proposal would not represent a location which is sustainable, as contrary to the Framework, it would not be located where the need to travel would be limited. - Conclusions on suitable location

    There is an acceptance by the Council that settlement boundaries will need to be breached to achieve the necessary housing requirements. [name] would expect an action plan to include strategies like considering development on land immediately abutting settlement boundaries. I do not have a Housing Action Plan before me in evidence. Nevertheless, I find that its inaccessibility far from services and facilities would render this scheme particularly unsustainable.

    Drawing the above together, the appeal site is not a suitable location for the development, having regard to the spatial strategy and its accessibility to services and facilities. The appeal scheme runs counter to [name] GD2, EN1 and DC17 and [name] SPO7, SPO13, [name] WCS2, WCS6 and WCS14, the objectives of which I have outlined above, and amongst other matters, seek to achieve sustainable development and expect real contributions to addressing climate change issues.

  5. Section 06

    Other Matters

    The appellants assert that if they were able to reside on site, it would negate twice daily vehicle movements associated with animal welfare checks. However, whilst the site currently accommodates a small number of animals, this may not always be the case, as any planning permission would run with the land not the appellant. As such, this carries only limited weight in favour of the appeal.

    The appellant suggests that the site is previously developed land (PDL). Having regard to the Framework definition, this specifically excludes land that is or was last occupied by agricultural or forestry buildings. Noting the evidence before me, including the appellants own description of the site, it has not been demonstrated that the land constitutes PDL in whole or in part.

    My attention is drawn to a number of appeal decisions. Limited information is before me in respect of them. Two of these2 relate to development in the Green Belt, where development would be assessed against different policy and criteria. The main issues in another decision3 cited, focused on highway safety and living conditions, not whether it was suitably located.

    The appeal decision relating to Perrysfield Farm4 comprised an application for full planning permission for 29 dwellings, including 10 affordable homes and 10 for older active persons, and related to the conversions and demolition of dwellings, such that even noting it had compromises in terms of sustainability of transport options, it had an entirely different context to the appeal before me. Similarly, the PiP appeal relating to the Barn at [address] Lane5 was also of greater scale, related to the conversion of an agricultural building, had better options for pedestrians and was closer to public transport connections.

    The PiP appeal on land rear of Godolphin View6 was an affordable housing led scheme of greater scale, that in contrast to this appeal before me, was located to immediately abut existing housing. Better accessibility options were available in respect of the dwelling at the heart of the appeal relating to land at Thornhill Stables7, and the housing land supply position was considerably worse at just 1- year, than in the case before me. Consequently, none of these appeals cited are directly comparable and they do not alter my findings.

    The Council can only demonstrate a 3.44 years supply of housing land, representing a sizeable deficit against the five years supply requirement. WLP Policy WCS14 relates to the presumption of sustainable development and despite its age, broadly aligns with the Framework. Paragraph 11(d) of the Framework states that where there are no relevant development plan policies, or the policies which are most important for determining the application are out-of-date, granting permission unless (i) the application of policies in the Framework that protect areas or assets of particular importance provides a strong reason for refusing the development proposed.

    Footnote 7 of the Framework identifies that habitat sites are areas of particular importance in this context, and I have found the lack of mitigation would indeed provide a strong reason for refusal. The presumption in favour of sustainable development does not therefore apply.

    Even had this not been the case, whilst the scheme would deliver a small but important boost to housing supply in a district where housing need is pressing, and even taking into account the associated economic and social benefits which collectively weigh heavily in favour of the appeal, as a scheme for just one dwelling, in my judgement the harm from its unsustainable location would have still significantly and demonstrably outweighed those benefits.

  6. Section 07

    Conclusion

    The proposal conflicts with the development plan and there are no material considerations, either individually or in combination, that outweigh the identified 2 APP/M3645/W/24/3347328 and APP/M3645/W/24/3347815 3 APP/C1435/W/25/3367636 4 APP/M3645/W/24/3352066 5 APP/C1435/W/25/3364183 6 APP/D0840/W/24/3349443 7 APP/Z3825/W/25/3361339 harm and associated development plan conflict. Moreover, the unfavourable AA means that it is exempted from qualifying for PiP, and it cannot be granted.

    Therefore, I conclude the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 5506No official casework-database value to compare
    Extracted decision date · page 1
    24 March 2026Matches the official casework database
    Extracted site visit dates
    23 March 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6003614
Application reference
WD/2025/2584/PIP
Lead case reference
Not recorded
Planning authority
Wealden District Council
Planning authority code
E07000065

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Minor Dwellings
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Planning Appeals - Outline
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
2,700 m²
Number of residences
1
Site in Green Belt
No
Agricultural holding
Yes
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Yes
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
14 January 2026
Valid date
14 January 2026
Start date
27 January 2026
Planning authority decision date
6 January 2026
Appeal decision date
24 March 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
86450
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29