Appeal 6003794
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
prior approval for the change of use of an agricultural building to 1 dwelling under Class Q.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
Schedule 2, Part 3, Class Q (a) of the GPDO permits development consisting of a change of use of a building and any land within its curtilage from a use as an agricultural building to a Class C3 use (dwellinghouse). This provision also includes, at (c) development referred to in Paragraph (a) together with any building operations reasonably necessary to convert the building.
The Council’s second reason for refusal refers to the extent of the curtilage of the building as a distinct issue. Though the appellant indicates that the curtilage could be revised to an area of no larger than the building itself which would meet the requirements under the GDPO, I have not seen a plan to this effect. However, I have assessed the appeal on the basis that the curtilage could be redefined as such and deal with the issue about the building’s location separately below.
Section 04
Main Issue
The main issues in the appeal are, having regard to Schedule 2, Part 3, Class Q, Q.1 (p) and Q.2 (1) (e), whether the building has suitable existing access to a public highway and whether the building’s location or siting render it impractical or undesirable for use as a dwelling.
Section 05
[name]
The appeal building lies in a countryside position to the south of Coldridge. It is accessed via a field gateway from the B3220 which is a 60mph rural road and which, in the vicinity of the site, is straight, relatively level and enclosed on either side by established hedgerow.
The appeal building is set back approximately 40m from the edge of the highway. There is a short downward sloping section into the field immediately behind the gated access. There are some loose hardsurfacing materials along tyre tracks within the field which are presumably used as an access track to the barn. The depth and height of the hedges either side of the gateway limit emerging visibility and the straight alignment of the road mean that drivers have effectively no visibility in either direction.
The B3220 is a high-speed rural road and the Council’s evidence details that serious collisions have occurred on it within 3km of the appeal site within the recent past. The visibility splays necessary to offer safety to users of the highway would be 215 metres (m) from a 2.4m set back in both directions. Additionally, a suitable track into the site to serve a residential use, including access by emergency vehicles, would also be necessary. Without these works, the intensification of the access to an average of around 8 or more daily trips would result in consequential effects on highway safety.
The works suggested to improve the access would include the removal of lengths of hedgerow to provide the visibility splays. The alternative suggestion of the appellant includes reducing the height and trimming back of some hedgerow, providing a non-migratory surface to the point of access and adding additional hardsurfacing to the existing vehicle route across the field. The highways consultee has provided a caveated response with the appellant’s Statement that if these works were undertaken, the related objection to the scheme could be removed.
However, I am not persuaded that the trimming back and lowering of the hedge height would amount to much less than the entire removal of the hedgerows within the visibility splays. The works to provide a non-migratory surfaced entrance and improved track along the rest of the 40m length also necessitate relatively extensive works. In any event, Schedule 2, Part 3, Class Q, Q.1 (p) requires consideration as to whether the building to be converted has suitable existing access to a public highway. It presently does not and the works to make it suitable do not fall under the scope of Q.1 (p) of Class Q, Part 3, Schedule 2 of the GPDO.
Section 06
Location of Building
The building occupies a position around 40 metres into an existing field. Save for a relatively insubstantial hedge close to the building which runs in a southerly direction to the roadside hedge, there are no boundary features which separate the building from the wider field. The existing vehicle route to the building from the access is not separated by any form of enclosure either.
To provide some separation from the adjoining land uses, such as for livestock grazing, some form of enclosure would need to be provided around the building. A fence might well serve this purpose; however, my view is that the improved access track would also need to be enclosed, and then the land between the track and the aforementioned hedge would most likely be impractical to access for continued agricultural purposes. These aspects highlight that the building’s location makes it impractical and undesirable to be converted to a residential use under the GDPO and could not be practically and comprehensively addressed under Schedule 2, Part 3, Class Q, Q.2 (1) (e) given the limitations on the curtilage size means.
Section 07
Other Matters
The Council’s evidence indicates that no structural stability report was submitted which would otherwise be expected. Whilst there is limited evidence on this point either way, it is not a decisive issue given that the appeal is failing for other reasons in any event.
Section 08
Conclusion
For the reasons set out above and taking into account all other matters raised, I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 160No official casework-database value to compare
- Extracted decision date · page 1
- 9 April 2026Matches the official casework database
- Extracted site visit dates
- 25 March 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6003794
- Application reference
- 25/01482/PNCOU
- Lead case reference
- Not recorded
- Planning authority
- Mid Devon District Council
- Planning authority code
- E07000042
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Change of use
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Prior Approval
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 84 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Yes
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- No
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 18 January 2026
- Valid date
- 18 January 2026
- Start date
- 26 January 2026
- Planning authority decision date
- 18 December 2025
- Appeal decision date
- 9 April 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office-s78
- Dataset status
- Current release
- Catalogue record ID
- 87173
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 20 August 2026 at 16:29