Appeal 6003971
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
9 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
single-storey rear extension and double storey side extension.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
The Council raises no objection to the single-storey rear element of the scheme, and I agree that it is acceptable. My assessment therefore focuses on the proposed two-storey side extension.
Section 04
[name]
The main issues are: • The effect of the two-storey side extension on the living conditions of the occupiers of 1 and [address], with particular regard to outlook and light; • Whether it has been satisfactorily demonstrated that the development would be safe from flooding and would not increase flood risk elsewhere; • The effect of the two-storey side extension on the character and appearance of the host building and surrounding area.
Section 05
Living conditions
The appeal property is a two-storey end-of-terrace dwelling. To the north-west are 1 and [address] (Nos 1 and 3), a pair of semi-detached bungalows oriented perpendicular to the appeal terrace.
The rear elevation of No 3 contains ground floor living accommodation windows and a first floor dormer bedroom window that face directly towards the gable end of the appeal dwelling. The garden is short and the dividing boundary fence is modest in height.
The full-height flank wall of the two-storey side extension would rise substantially above the boundary fence. Owing to its proximity, height and massing, the extension would form a visually dominant feature that would materially increase the sense of enclosure experienced from the principal rooms and small garden at No 3. I therefore find that the two-storey side extension would result in a significant overbearing impact to the detriment of the living conditions of occupiers of No 3, notwithstanding the lack of objection from that neighbour.
I acknowledge that the removal of side-facing windows in the gable of the appeal property could improve privacy for No 3. However, this benefit does not negate or outweigh the harm that would arise from the increased sense of enclosure and harm to outlook identified above.
In terms of overshadowing, the appeal dwelling lies to the south-east of No 3. Although the two-storey side extension would be positioned close to the boundary, it would be no higher than the existing terrace, and the sun’s path means that any additional shadowing would be minor and limited to the morning. For most of the day the rear windows and garden of No 3 would continue to benefit from unobstructed daylight. I therefore do not share the Council’s view that there would be harmful overshadowing.
As the rear elevation of No 1 faces the open rear garden of the appeal property, the extension would not intrude materially into the primary outlook from its principal rooms, nor would it appreciably affect daylight or sunlight. I therefore find no unacceptable harm to the living conditions of the occupiers of No 1.
For these reasons, I conclude that the two-storey side extension would unacceptably harm the living conditions of the occupiers of [address] in terms of outlook, but not those at No 1. The proposal therefore conflicts with Policies CP4 and CP30 of the [name] 2010 (the CS), and Policies DMD8, DMD 11 and DMD 14 of the Enfield Development Management Document 2014 (the DMD), which collectively seek to safeguard the amenity of neighbouring occupiers.
Section 06
Flood risk and surface water drainage
The evidence before me indicates that [address] lies within [name] 2, with [name] to the rear forming part of a wider [name] 3 corridor. The Council’s SuDS Highway Services identify that the site is at risk from both surface water and fluvial flooding in the 1 in 100 year event including a +17% climate change allowance. This is consistent with the Strategic Flood Risk Assessment (SFRA), which records that the [name] catchment responds rapidly to rainfall and is affected by engineered channel constraints that heighten the sensitivity to extreme events. In such circumstances, a site-specific Flood Risk Assessment (FRA) is required to demonstrate that the development would be safe for its lifetime and that it would not increase flood risk elsewhere.
Although a FRA was submitted with the application, it does not address the specific sources of flood risk affecting the site. It provides no assessment of overland flow routes, nor does it quantify flood depths or hazards for the 1 in 100 year plus climate change scenario identified by both the consultee and the SFRA. The FRA also omits any proposal for level-for-level flood storage compensation.
The appellant’s SuDS pro-forma identifies an attenuation target of 6.97m3 for the 1 in 100-year event plus climate change, whereas only 2.55m3 would be provided. This is a substantial shortfall in provision, and no justification or alternative mitigation is advanced. A single SuDS feature of insufficient capacity would not ensure that runoff is managed close to source or maintain discharge rates at acceptable levels.
Policies SI12 and SI13 of the London Plan 2021 (the LP), together with [name] 21 and CP 28 of the CS and [name] 59–61 of the DMD, require development to be safe from flooding, avoid increasing flood risk elsewhere, and to incorporate SuDS in accordance with the established hierarchy. The SFRA emphasises the need for robust site-specific FRAs in locations subject to fluvial and surface water interaction, including ensuring no loss of flood storage and the provision of attenuation that accounts for climate change. In the absence of a reliable assessment of flood hazards, compensatory storage or a SuDS strategy capable of attenuating runoff for the critical storm events, I cannot be satisfied that the development would satisfy these requirements.
Although the appellant suggests that the Council could have requested further details, it is the responsibility of the applicant to provide sufficient information at the point of determination to demonstrate that the proposal satisfies the relevant flood-risk and drainage requirements. Given the importance of the deficiencies identified, which relate to the fundamental question of whether the development can operate safely and without increasing flood risk, it would not be appropriate to leave such matters to planning conditions.
For these reasons, it has not been demonstrated that the development would be safe from flooding and that it would not increase flood risk elsewhere. The proposal is therefore contrary to the flood-risk and drainage objectives of the policies listed above, and section 14 of the National Planning Policy Framework.
Section 07
Character and appearance
The Council expresses concern that the two-storey side extension’s width, height and proximity to the boundary would create an impression of a terracing effect with [address].
However, No 3 is a single-storey dwelling (with dormer), oriented at a right angle to the appeal terrace and separated by its rear garden. Given this geometry, the proposed extension would not read as part of a continuous facade and no realistic terracing effect would arise. Even in the absence of a 1-metre gap from the boundary, a clear spatial break would remain, preventing any perception of the dwellings merging visually.
Furthermore, I do not consider that a set-down or set-back at first floor would be appropriate in this case as it would introduce an awkward and visually disruptive step into the otherwise simple roof form of the terrace. By maintaining the established roofline, the extension would sit comfortably with the form and proportions of the host building.
I therefore conclude that the two-storey side extension would not harm the character or appearance of the host building and surrounding area, and so, complies with the design objectives of Policies D3 and D4 of the LP; Policies CP4 and CP30 of the CS; and Policies DMD6, DMD8, DMD14 and DMD37 of the DMD.
Section 08
Other Matters
The appellant refers to several extensions that have been built in the surrounding area. However, each proposal must be assessed on its own merits. Here, the specific relationship between the appeal dwelling and [address], together with the site-specific flood-risk and drainage considerations, are determinative factors. These circumstances are not shown to be replicated in the examples cited, which consequently carry little weight.
I recognise that the proposal would improve the internal accommodation available to the occupiers of the appeal property. However, this benefit does not outweigh the harms identified in respect of neighbouring living conditions and flood-risk.
Section 09
Conclusion
While the single-storey element is acceptable, the development as a whole would cause unacceptable harm to neighbouring living conditions and fails to demonstrate compliance with flood-risk and drainage policy requirements. These harms are decisive. The proposal therefore conflicts with the development plan taken as a whole and there are no material considerations to justify a decision otherwise. Accordingly, the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 597No official casework-database value to compare
- Extracted decision date · page 1
- 17 March 2026Matches the official casework database
- Extracted site visit dates
- 3 March 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6003971
- Application reference
- 25/03262/HOU
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Enfield
- Planning authority code
- E09000010
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Householder
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 288 m²
- Number of residences
- Not recorded
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 21 January 2026
- Valid date
- 21 January 2026
- Start date
- 28 January 2026
- Planning authority decision date
- 28 November 2025
- Appeal decision date
- 17 March 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office
- Dataset status
- Current release
- Catalogue record ID
- 86054
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21