Skip to main content
Official casework recordDismissedCurrent release

Appeal 6004122

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

10 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as a “retrospective application for retention of boundary fencing, sliding access gate and raising height of stone pillars”.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Appeal Procedure

    The site visit was undertaken by a representative of the Inspector whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal scheme, which seeks retrospective planning permission.

  3. Section 04

    [name]

    The main issues are a) whether or not the fencing and gates are inappropriate development in the Green Belt; their effect on b) the openness of the Green Belt; and c) the character and appearance of the area; and d) if the fence and gates are inappropriate development, whether the harm by reason of inappropriateness, and any other harm, is clearly outweighed by other considerations, so as to amount to the very special circumstances necessary to justify them.

  4. Section 05

    Inappropriate Development

    In regard to Green Belt development, the National Planning Policy Framework (Framework) sets out, amongst other things, that such is inappropriate unless it falls within a given set of exceptions. Policy PG 3 of the Cheshire East Local Plan Strategy 2010-2030 (LPS) and Policy RUR 11 of the Cheshire East Local Plan, Site Allocations and Development Policies Document (LP) reflect the stance of the Framework in this regard. The proposals do not fall within any of the exceptions listed in paragraphs 154 or 155. Therefore, the appeal scheme is inappropriate development in the Green Belt.

  5. Section 06

    Openness

    Openness is a fundamental attribute of the Green Belt and comprises both spatial and visual elements. Spatial openness is not limited to the absence of buildings but also relates to the extent to which land is perceived as open and free from development. In this case, the appeal scheme has introduced extensive and continuous timber fencing, together with solid entrance gates, along the full extent of the site’s publicly visible boundaries. These features create a defined and enclosed domestic curtilage where no such enclosure previously existed. While the site was formerly bounded by a low dry‐stone wall with post‐and‐wire fencing, these elements were visually permeable and rural in character and did not result in the same degree of enclosure. By contrast, the current fencing and gates materially reduce the spatial openness of the Green Belt by enclosing and subdividing land that would otherwise read as open countryside.

    The fencing and gates also reduce the visual openness of the Green Belt. The site occupies a prominent and exposed position fronting [address], with a public footpath running along the northern and western boundaries. From both of these public viewpoints, the fencing presents a strong, visually solid boundary that interrupts views across and through the site and restricts the perception of openness beyond. In particular, the close-boarded fencing along the footpath creates an enclosing and urbanising presence that is at odds with the open and rural character of this part of the Green Belt.

    The appeal scheme significantly limits visual permeability and reinforces the impression of a private, self-contained residential compound. This results in a clear loss of both spatial and visual openness, causing harm to the Green Belt as well as that arising from the development’s inappropriateness.

  6. Section 07

    Character and Appearance

    The appeal property is a detached dwelling, set within a strongly rural and verdant landscape, with woodland to the north, east and west and open views to the south. It is set back from a tree lined road that experiences a steady flow of traffic. The character of the immediate area is informed by low-key and informal boundary treatments, predominantly dry-stone walls and post-and-wire fencing, which allow for visual permeability and positively reinforce the open countryside character.

    The horizontal timber fencing along the highway frontage, by reason of its height, length and uniform appearance, appears as an incongruous and visually dominant feature within this rural context. Similarly, the close-boarded fencing erected along the public footpath forms a continuous and imposing boundary that creates a pronounced sense of enclosure for users of the footpath, unacceptably eroding its rural and informal character. Taken together, the fencing, entrance gates and pillars, by virtue of their scale, materials and design, result in a domesticated and suburban form of boundary treatment that is poorly related to the quality of character of the surrounding countryside.

    Consequently, the development conflicts with Policies GEN1 and HOU11 of the Cheshire East Local Plan Site Allocations and Development Policies Document, 2022 and Policy SE1 of the Cheshire East Local Plan Strategy 2010-2030, 2017, and guidance contained in the Cheshire East Borough Design Guide Supplementary Planning Document Volume 1 which, amongst other things, seek to ensure that development is of a high quality design that reflects the local character, with regards to scale and appearance.

  7. Section 08

    [name]

    The appeal scheme may improve security for the appeal site, but it remains unclear as to whether this could not have been achieved through other, less harmful means. Neither this, nor the absence of harm to residential amenity or highway safety, nor the lack of objections from local residents, is sufficient to make the scheme acceptable.

    I understand that the appellant did not intend to undertake development that required planning permission and that they expressed a willingness to amend the proposals, including additional planting and alternative boundary treatments. Whatever discussions may have taken place between the main parties during the application process, this decision must be based on the proposal as submitted to, and determined by, the Council, and on which interested parties had the opportunity to comment.

    Whilst the apparent lack of engagement from the Council has caused frustration, these matters are between the main parties and do not affect my consideration of the main issue. Any concerns relating to conduct are best addressed through direct engagement with the Council, utilising any complaints procedure that it may have.

    In relation to the photographic examples of other local boundary treatments cited across the wider area, the full planning history of each is not available to me. I am unaware of their planning status and the finer details such as the circumstances and context which prevailed at the time. It also remains unclear whether these treatments were implemented recently.

  8. Section 09

    Conclusion and Recommendation

    The appeal scheme constitutes inappropriate development in the Green Belt. It also results in a reduction in openness, both spatially and visually. In accordance with the Framework, I give substantial weight to these harms. In totality, the weight I would ascribe to the other considerations would be insufficient to clearly outweigh it. Accordingly, the very special circumstances necessary to justify the development do not exist.

    The proposal therefore conflicts with the aims of the development plan as I have set them out above and there are no other material considerations, including the provisions of the Framework, that indicate a decision other than in accordance therewith. I therefore recommend that the appeal should be dismissed.

  9. Section 10

    Inspector’s Decision

    I have considered all the submitted evidence and my representative’s report and on that basis the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 1895No official casework-database value to compare
    Extracted decision date · page 1
    22 April 2026Matches the official casework database
    Extracted site visit dates
    30 March 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6004122
Application reference
25/4356/HOUS
Lead case reference
Not recorded
Planning authority
Cheshire East
Planning authority code
E06000049

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Householder
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
4,750 m²
Number of residences
Not recorded
Site in Green Belt
Yes
Agricultural holding
Not recorded
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
24 January 2026
Valid date
24 January 2026
Start date
28 January 2026
Planning authority decision date
7 January 2026
Appeal decision date
22 April 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office
Dataset status
Current release
Catalogue record ID
87723
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21