Appeal 6004185
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
change of use of no. [site address] across the ground floor to a hot food takeaway ([name]) and installation of external ventilation and extraction equipment without complying with conditions attached to planning permission Ref 25/00472/FUL, dated 19 September 2025.
Section 02
Decision
The appeal is dismissed.
Section 03
Background
Planning permission was granted in September 20251 (‘the original permission’) for the change of use of the ground floor of the appeal property to a hot food takeaway (‘the takeaway’) subject to various conditions. The takeaway is not yet trading.
Condition 5 of the original permission limits opening hours to safeguard the amenities of local residents. The appellant now wishes to amend Condition 5 as originally imposed, to allow the takeaway to open between 4pm and 11pm Monday to Sunday, including bank holidays. Flexibility in the approval of external extraction equipment is also sought by an amendment to Condition 4 to include the phrase ‘such other details as may be agreed in writing with the Local Planning Authority.’ 1 [name]. 25/00472/FUL
Section 04
[name]
The main issues are: • the effect that varying Condition 5 would have on the living conditions of occupiers of nearby residential properties, with particular regards to noise and disturbance; and • whether Condition 4 is necessary and reasonable having regard to safeguarding the amenities of local residents.
Section 05
Reasons
[site address] (No 4) is a two-storey property at one end of a short terrace formed with 6 and [address] (No 6 and 8), which are dwellings. It is located just outside the town centre boundary of Chorley on the southern side of [address]. There is an existing takeaway (‘[name]) and plumbing business on the opposite side of the road, but as it extends away from the town centre [address] comprises predominantly tight-knit terraced housing.
Extending the opening of the takeaway to 11pm would be to a time in the evening when neighbours should reasonably expect a lower level of activity, even close to a town centre and where other commercial uses exist. It would realistically increase noise and disturbance from customers and delivery drivers stopping, parking and entering/exiting the premises. This would be most keenly felt by the close-by neighbouring occupiers of No 6 and 8, and there is potential for customers to gather or wait outside the takeaway, and close to the living room window of No 6, relatively late in the evening. The absence of an objection from the occupiers of these dwellings does not amount to an absence of harm.
I observed that parking along much of the length of [address] is restricted to residents permit holders, but those bays either side of the road outside No 4 would be available for customers of the takeaway. At the time of my late afternoon site visit these bays were fully occupied. I have not been provided with any information regarding the expected number of delivery drivers, or the modes of transport which would be used. However, given the popularity of home delivery, even in residential areas, I would also expect there to be a reasonable number of delivery movements to and from the takeaway. The increase in the duration of use of the closest parking bays and associated vehicle movements would be clearly noticeable to residents along this part of [address]. It would result in a level of additional noise and disturbance which would cause harm to their living conditions.
The appellant would be prepared to accept a condition which would restrict the opening hours of the takeaway to 10.30pm, but this would nevertheless be relatively late in the evening particularly on a weekday. Furthermore, it would still likely coincide with customers leaving licensed premises in the wider town centre. Such a reduction in opening hours would not therefore reduce activity, noise and disturbance associated with the takeaway to an acceptable level.
The ‘[name] takeaway diagonally opposite No 4 operates between the hours of 4.30pm to 10.30pm Tuesday to Sunday, but I note the Council’s evidence is that this is an historic use, as are its hours of operation. I accept that consistency in decision-making in the planning system is important, but every case must be assessed on its own merits with regards to the development plan and other considerations in effect at the time of each decision.
I acknowledge that the Council’s Environmental Health Officer raised no objection to the proposed longer opening hours and the appellant asserts that no complaint history exists for the appeal property. However, it does not follow that if the hours of opening were extended, this would not give rise to future complaints regarding noise and disturbance given the nature of the use and proximity of neighbours. Therefore, whilst it may be considered precautionary, I find the opening hours of the original permission strikes an acceptable balance between additional activity associated with a new takeaway use, in an area where there is already some evening activity, and the need to protect the amenity of residents of [address].
It is also proposed to amend Condition 5 such that the takeaway could open half an hour earlier in the afternoon at 4pm, seven days a week. I visited on a weekday at a similar time of day and observed this end of [address] to be relatively busy with vehicles using the short-term parking bays outside the appeal property and pedestrians walking to and from [address]. Customers would be largely consumed in this existing activity, and the earlier opening of the takeaway would not therefore harm the living conditions of neighbours. I note the Council’s evidence that the opening hours on the original permission sought to avoid school leaving times, but I have no evidence to demonstrate that there is a school in walking distance of the appeal property.
Nevertheless, for the above reasons, I conclude that varying the evening opening hours as proposed would have a harmful effect on the living conditions of occupiers of nearby residential properties, with particular regards to noise and disturbance. Consequently, it would conflict with Policy BNE1 of the Chorley Local Plan 2012-2026 (2015) in so far as it requires that proposals do not cause an unacceptable degree of noise and disturbance to surrounding land uses. Condition 4
Condition 4 is proposed to be amended to include the ‘tailpiece’ phrase ‘such other details as may be agreed in writing with the Local Planning Authority.’ Such wording should be avoided where possible, because it can create a risk that significant changes could be made to the development and/or to circumvent the statutory routes to vary conditions, depriving third parties of the opportunity to comment. The inclusion of such a tailpiece in the proposed wording of Condition 5 raises the same concerns.
The appellant accepts and does not dispute the reason for refusal in respect of Condition 4. In the absence of any further evidence before me, I therefore find Condition 4 as worded on the original permission to be necessary and reasonable having regard to the need to safeguard the amenities of local residents.
Section 06
Other Matters
I acknowledge that extending the opening hours may better reflect local demand, supporting the viability of the business as well as local economic activity, but this does not outweigh the harm I have found to living conditions.
Section 07
Conclusion
The proposal conflicts with the development plan and material considerations do not indicate that the appeal should be decided other than in accordance with it. For the reasons given above, I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 5577No official casework-database value to compare
- Extracted decision date · page 1
- 16 April 2026Matches the official casework database
- Extracted site visit dates
- 2 April 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6004185
- Application reference
- 25/01166/FUL
- Lead case reference
- Not recorded
- Planning authority
- Chorley Borough Council
- Planning authority code
- E07000118
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Minor retail and services
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Planning Appeals - Full
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 90 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- No
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 26 January 2026
- Valid date
- 26 January 2026
- Start date
- 9 February 2026
- Planning authority decision date
- 7 January 2026
- Appeal decision date
- 16 April 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office-s78
- Dataset status
- Current release
- Catalogue record ID
- 87484
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 20 August 2026 at 16:29