Skip to main content
Official casework recordDismissedCurrent release

Appeal 6004315

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the extension of existing park homes estate for [address] homes falling under the definition of a 'caravan' under the [name] and Control of Development Act 1960 and the Caravan Sites Act 1968 (or any Act revoking and re-enacting those Acts)

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    Following the refusal of planning permission on drainage grounds, the appellant has submitted a revised [name] (DSR), Drainage Strategy Plan (DSP), and [name] as part of the appeal.

    I have considered the additional drainage information in consideration of the Holborn Studios Ltd v The Council of the London Borough of Hackney [2017] EWHC 2823 judgement. The DSR, DSP and hydraulic calculations provide further supporting information regarding the drainage of the site but do not amend the proposal. As such, I have considered whether accepting the information would cause procedural unfairness to interested parties. The Council has provided comment on the revised DSR, DSP and the calculations.

    As the DSR does not amend the proposed development from that seen within the application, this evidence does not make a substantive change to the proposal, and no objections have been received in relation to the proposal. As a result, the acceptance of the DSR, DSP and calculations would not unfairly deprive those entitled to be consulted on the application, the opportunity to make a representation. Whilst my decision has therefore taken the DSR, DSP and calculations into consideration, no drainage statement that evaluates this technical evidence has been submitted to assist me in understanding the implications of this data.

    Whilst on site I observed that the appeal site has been subject to development undertaken that is not shown on the proposed layout plan. A caravan has been provided (number 9) adjacent to number 26, and two concrete pads have been laid, one of which is adjacent to number 23 and the other is adjacent to the new caravan at number 9. These fall within the red line boundary of the appeal site and would appear to prevent the development being laid out as proposed on the site layout (drawing number 0172_P_300E). Nonetheless, I have assessed the proposal based on the plans before me.

  3. Section 04

    Main Issue

    The main issue is whether the site can be adequately drained for both foul and surface water.

  4. Section 05

    Reasons

    Policy ER11 of the Telford and Wrekin Local Plan (2011-2031) (TWLP) addresses sewerage systems and water quality and requires that the development demonstrates that it can be drained appropriately for both foul and surface water against a set of five criteria. TWLP Policy ER12 covers flood risk management and requires development to comply, where applicable, with a set of ten criteria relating to flood risk and surface water management.

  5. Section 06

    Foul water management

    The application form states that foul water would be discharged to the mains sewer with no change to the existing public sewer connection. The site has a private sewer network that connects to [name] network. Several drainage surveys have been undertaken which have failed to identify a connection point to the [name] network. I note the evidence of a connection to the public sewer network following the submission of a [name] bill for one of the existing properties on the [site address] site.

    The DSR has identified that a foul water drain runs alongside the existing units at numbers 10, 11 and 13 [site address] which feed into a combined foul and surface water drain adjacent to number 26 [site address] . This combined sewer appears to connect to the public sewer adjacent to number [address], at the rear of the [site address] site. However, this does not appear to concur with the plan of the sewer/drain network within the evidence from [name]. The DSR also identifies that parts of the private on-site drainage network are in a poor condition and require remedial works or replacement.

    As a result and given that the connection to the public sewer network was not found as part of the survey work, I am unable to conclude with reasonable certainty that a foul water connection for the appeal site is available and that the existing drainage network on site is serviceable to allow for the further expansion of [site address] . Whilst a planning condition could be imposed that requires confirmation of a connection agreement with [name], without further information to ascertain that it can be achieved, this would not be reasonable.

  6. Section 07

    Surface water management

    The DSP has amended the proposed attenuation basin to reduce the permanent water level that would remain within the attenuation basin. The Lead Local Flood Authority (LLFA) has identified that the despite the amendment, a level of stagnant water would remain within the basin that could become a health hazard and would hinder the biodiversity of the site. I also acknowledge the LLFA’s concerns regarding the storage capacity of the basin in relation to the 1 in 100 year +45% CC and whether this would be sufficient without using the ‘freeboard’ of the basin. As no further commentary has been provided by the appellant as to why the basin cannot be dry except during periods where the basin is required for the storage of surface water or regarding its storage capability, I am not satisfied that the attenuation basin has been appropriately designed and calculated to accommodate the surface water requirements of the appeal site.

    The submitted water management statement identifies that surface water would be addressed using soakaways, for new roof and hard surfaced areas. These appear to drain into the proposed attenuation basin where water would then be pumped into the private drainage system in the wider [site address] .

    The Council’s Sustainable Drainage Systems (SuDs) Handbook 2019 [name] (the [name]) identifies that the pumping of surface water for new development will not be permitted. It goes on to advise that development should be directed to where the discharge of surface water via gravity can be achieved. I acknowledge that infiltration of surface water is not allowed on the site due to the presence of shallow mine works and a mine shaft. However, no evidence is before me regarding alternative sustainable drainage solutions, or confirmation provided, that demonstrates that the pumped solution is the only viable surface water management scheme for the site.

    Overland exceedance surface water flows, as indicated on drawing number LM25017-XX-DR-C-520 P01, appear to fall towards the wooded area to the west of the appeal site. Due to the site topography, the surface water would appear to flow down towards the B4373 [site address] Way. Consequently, should the proposed pumped system fail and/or the storage capacity of the basin not be sufficient, the proposal could lead to a surface water flood risk on and off site, including onto the B4373. On this basis, I am unable to conclude with reasonable certainty that the proposed development has adequately calculated and accommodated surface water drainage and management within the proposal. I also note that the Council considers that the SuDs proposed are not of a suitable quality for adoption.

    Whilst a sustainable drainage condition could be imposed, this would not be reasonable where doubt remains as to whether an appropriate drainage system can be accommodated on site. The evidence provides no alternatives or reasoning for the drainage solution before me. Accordingly, I am unable to conclude that both an appropriate foul and surface water drainage system can be achieved on site. Therefore, a condition that may not be capable of being complied with would not be reasonable.

    Accordingly, for the reasons given above, the proposal would conflict with Policies ER11 and ER12 of the TWLP. These policies, amongst other things, require development to demonstrate how foul flows produced by the development will be drained and the identification of the agreed point of connection to the public foul sewerage network. They also require development to include appropriate sustainable drainage systems to manage surface water appropriate to the hydrological setting of the site and that a management and maintenance plan is in place that includes arrangements for adoption by a public authority or statutory undertaker. The proposed development also fails to accord with the Council’s SuDs Handbook.

  7. Section 08

    Other Matters

    The proposed development would provide nine residential units that would contribute to the Government’s objective to significantly boost the supply of homes. The units would also provide housing for a wide range of the population, including older people. These factors attract only modest weight in favour of the scheme.

  8. Section 09

    Conclusion

    Whilst the proposal would provide nine additional residential units, these do not outweigh the requirement for the site to be adequately and appropriately drained. For the reasons given above the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 4715No official casework-database value to compare
    Extracted decision date · page 1
    3 June 2026Matches the official casework database
    Extracted site visit dates
    26 May 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6004315
Application reference
TWC/2025/0247
Lead case reference
Not recorded
Planning authority
Telford and Wrekin Council
Planning authority code
E06000020

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Change of use
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Planning Appeals - Full
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
14,800 m²
Number of residences
9
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
29 January 2026
Valid date
29 January 2026
Start date
2 February 2026
Planning authority decision date
31 July 2025
Appeal decision date
3 June 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
89760
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29