Skip to main content
Official casework recordAllowedCurrent release

Appeal 6004334

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the erection of a dormer to the side and change rear roof from hip to gable.

  1. Section 02

    Decision

    The appeal is allowed, and planning permission is granted for the erection of a dormer to the side and change rear roof from hip to gable at [site address] in accordance with the terms of the application reference 25/02220/PFUL3 (PP-14535028) subject to the following conditions:

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: A100, A101, A102 and the Location Plan, which shows the site edged red.

  2. Section 03

    Main issue

    The Council raises no objection to the proposed hip to gable alteration or the Juliette style balcony to the rear of the enlarged dwelling. From the submitted evidence, I have no reason to disagree with that finding. Therefore, the main issue is the effect of the proposed dormer on the living conditions of the occupiers of neighbouring properties with particular regard to privacy.

  3. Section 04

    Reasons

    The appeal property is a detached single storey dwelling within a predominantly residential area. To the south is an electricity substation, beyond which is a two-storey dwelling at [address]. Although the reason for refusal refers to neighbouring properties to the south of the site, No 64 is the nearest and so most directly affected by the proposed dormer.

    The electricity substation between the appeal property and No 64 creates a meaningful physical buffer between the proposed dormer windows and the side and rear of this neighbouring property. As a result, the relationship between the new dormer windows and the neighbouring dwelling is not one of direct side-to-side juxtaposition of the kind commonly found between residential properties.

    The proposed dormer windows would serve bedrooms and a bathroom within the enlarged roof space of No 96. Whilst it is inevitable that some views towards No 64 would be available from these windows given their elevated position, the key question is whether the outcome would be unacceptable harm to the privacy of the occupiers of this adjacent property.

    From what I saw, any views from the proposed dormer windows would be angled across the side boundary area of the site with its tall boundary fences and the intervening substation would largely mask the flank wall of No 64. Part of the outdoor area at the back of No 64 would be visible from the new dormer albeit at some distance and at an acute angle. None of the front or rear elevations of No 64 would be evident from the new dormer.

    Upper-floor windows are commonplace within residential areas such as this and a degree of mutual visibility between neighbouring properties is often unavoidable. In this case, the degree of overlooking that may occur would be limited. It would not materially diminish the reasonable expectation of privacy enjoyed by neighbouring occupiers. Given this finding, there is no need to consider measures such as obscure glazing to overcome potential overlooking problems.

    On the main issue, I conclude that the living conditions of the occupiers of No 64 or any other neighbouring properties would not be materially reduced. Accordingly, there is no conflict with Policy 10 of the [name] 1 Local Plan or Policy DE1 of the Land and Planning Policies Development Plan Document Local Plan Part 2 insofar as they seek to safeguard residential amenity.

    A neighbouring occupier raises concern that the proposed rooflights could reduce the efficiency of their solar panels through overshadowing. The submitted plans show that the new rooflights would be placed high on the side roof slope of No 96 and project minimally above the roof plane. I am satisfied that this arrangement would not result in any appreciable overshadowing to the extent that it would adversely affect the performance of the neighbouring solar panels. Any impact in this regard would be minimal and would not justify withholding planning permission.

    The appellant is critical of the Council and states that the decision to refuse planning permission was taken shortly after the Officer’s site visit despite a willingness to revise the scheme to address any potential concerns. My remit is, however, solely to determine this appeal.

  4. Section 05

    Conditions

    In addition to the standard time limit condition, it is necessary to impose a condition requiring the development to be carried out in accordance with the approved plans for certainty. The external materials to be used are specified on the submitted drawings and these would be appropriate to ensure the satisfactory appearance of the finished dwelling.

  5. Section 06

    Conclusion

    Overall, there are no material considerations that indicate that the development should be determined other than in accordance with the development plan. For the reasons given above I conclude that the appeal should be allowed. [planning inspector] INSPECTOR

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 287No official casework-database value to compare
    Extracted decision date · page 1
    1 June 2026Matches the official casework database
    Extracted site visit dates
    29 May 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6004334
Application reference
25/02220/PFUL3
Lead case reference
Not recorded
Planning authority
Nottingham City Council
Planning authority code
E06000018

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Householder
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
46 m²
Number of residences
Not recorded
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
29 January 2026
Valid date
21 April 2026
Start date
6 May 2026
Planning authority decision date
27 January 2026
Appeal decision date
1 June 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office
Dataset status
Current release
Catalogue record ID
89610
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21