Appeal 6004383
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the erection of up to three self or custom-build dwellings.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
Planning Practice Guidance (PPG) advises that permission in principle is an alternative way of obtaining planning permission for housing led development. The first stage establishes whether a site is suitable in-principle, whereas the second technical details consent (TDC) stage is when detailed development proposals are assessed. This appeal relates to an application for permission in principle. The scope of the considerations for such applications is limited to location, land use and amount of development.
Section 04
Procedural Matter – Habitats Development
The appeal site lies within the buffer zone for recreational pressure on the Salisbury Plain Special Protection Area (SPA) and the ‘yellow’ medium risk zone of the [name] (TBMS) associated with the Bath and Bradford on Avon Bats Special Area of Conservation (SAC), which are [name] afforded protection under the Conservation of Habitats and Species Regulations 2017 (as amended) (the Habitats Regulations).
Article 5B(1) of the Town and Country Planning (Permission in Principle) Order 2017 (as amended) (‘the Order’) states that permission in principle cannot be granted for development which is habitats development. Habitats development is defined in the Order as development which is likely to have a significant effect on a qualifying European site (either alone or in combination with other plans and projects) and is not directly connected with or necessary for the management of the site.
If a proposed permission in principle development is likely to have a significant effect on a qualifying European Site without any mitigating measures in place, an Appropriate Assessment (AA) must be undertaken by the competent authority to establish whether the development would adversely affect the integrity of the protected site. If the outcome of the AA is unfavourable, it would preclude the grant of permission in principle, and it becomes unnecessary to consider any further matters in relation to location, land use and amount of development.
For the purposes of this appeal, I am the competent authority responsible for considering the effects on European sites and undertaking an AA.
Section 05
[name]
The Salisbury Plain SPA is an area of calcareous grassland which is designated for its qualifying feature of breeding and wintering birds, including the Stone-curlew. Such ground nesting birds are vulnerable to disturbance from walkers, especially those with dogs. As the appeal site lies within the 6.4km [name] Zone there is therefore potential that residents from the proposed housing, in combination with other development, could result in adverse effects on the integrity of the SPA through additional recreational pressure.
The appellant highlights that the Council’s strategy to protect the integrity of the SPA from such recreational pressure is outlined in its Habitats Regulations Assessment and [name] for [name]. This confirms that the Council, as a CIL charging authority, would specifically collect funding via its CIL to mitigate the effects of housing on the SPA.
In view of the above, given that the Council would be able to secure funds via the CIL to deliver the infrastructure necessary to support initiatives at the SPA to mitigate recreational pressure, I am satisfied there would be no adverse effect on the integrity of the SPA.
Section 06
The Bath and Bradford on [name]
The Bath and [name] comprises a network of significant underground sites including caves, mines and man-made tunnels which are used by bats for hibernation and breeding. Although not part of the SAC designation itself, lying in the surrounding yellow medium risk zone, the appeal site is identified as an area with habitats vital for the bats for feeding and commuting.
The proposal would be likely to displace some grassland and hedgerow and therefore encroach physically into habitat that contributes to supporting the bat population. In addition, up to three dwellings would have associated lighting and human activity which could deter foraging and commuting bats.
It has been put to me that the individual effects of the development on the SAC would be limited (being restricted to ‘the loss of grassland and some potential hedgerow loss’) and as such, the proposal does not comprise Habitats Development for the purpose of the Order, since it necessitates a ‘significant effect’ not a ‘limited’ effect on a European Site. However, the Habitats Regulations require me to consider the effect on the SAC either alone or in combination with other plans and projects. Such repeated relatively modest residential development within a sensitive zone for bats would be likely to have a significant impact. On that basis, I do not agree that this prevents the proposal from amounting to habitats development for the purposes of the Habitats Regulations. Consequently, I find the proposal would be likely to have a significant effect on the SAC.
It is therefore appropriate to consider whether mitigation measures could address the harmful effect. To ensure development does not result in adverse effects on the integrity of the SAC, the TBMS expects that residential development proposals in the yellow zone to fully mitigate the loss of habitat on site. This should be demonstrated by use of an established metric (preferably the [name] or subsequent version). Secondly, proposals are expected to make a proportionate financial contribution towards strategic habitat mitigation.
Given the limited details associated with a permission in principle application, doubt remains as to the extent of habitat loss, and therefore, whether it could be fully mitigated on site.
In addition, the main parties agree that a financial contribution would be required in accordance with the tariff set in the TBMS in order to mitigate the effects of the development on the SAC. However, there is no mechanism before me to secure such a financial contribution.
Hence, the information before me fails to show beyond all reasonable scientific doubt that any adverse effect on the integrity of the SAC would be avoided.
Neither is it shown that there are imperative reasons of overriding public interest of a social or economic nature sufficient to overcome the harm that would be caused to the SAC. Nor has it been demonstrated that there are no alternative solutions. Ultimately, this results in an unfavourable AA.
It is contended that mitigation measures could be specified and secured at a TDC stage. Logic dictates that this could only follow a grant of permission in principle. I am not provided with any substantive evidence as to how such an approach would avoid the proposal from amounting to habitats development at this point. The Order explicitly states that a local planning authority (and by extension a planning inspector) may not grant permission in principle in relation to development which is habitats development. In the absence of evidence to show otherwise, I am not satisfied such a course of action would be lawful.
My approach is reinforced by that of the Inspector in an appeal brought to my attention (APP/Y2620/W/25/3368039). In that case the Inspector went on to grant permission in principle only having first established that the development, with mitigation, would not adversely affect the integrity of protected sites. Unlike the case before me, in that instance mitigation was set out and secured by way of legal agreements at the permission in principle stage.
For the above reasons, I therefore conclude that irrespective of the merits of the scheme, it is exempted from qualifying for permission in principle because it amounts to habitats development. It is therefore unnecessary to consider the matters of location, land use and amount any further as they would not be determinative to the outcome of the case. Accordingly, the proposal must be rejected on procedural grounds.
Section 07
Conclusion
For the reasons given above I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 4996No official casework-database value to compare
- Extracted decision date · page 1
- 8 June 2026Matches the official casework database
- Extracted site visit dates
- 14 April 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6004383
- Application reference
- PL/2025/07087
- Lead case reference
- Not recorded
- Planning authority
- Wiltshire Council
- Planning authority code
- E06000054
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Minor Dwellings
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Planning Appeals - Full
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 3,500 m²
- Number of residences
- 3
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- No
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 30 January 2026
- Valid date
- 30 January 2026
- Start date
- 2 February 2026
- Planning authority decision date
- 25 September 2025
- Appeal decision date
- 8 June 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office-s78
- Dataset status
- Current release
- Catalogue record ID
- 89997
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 20 August 2026 at 16:29