Appeal 6004635
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as “the erection of a single storey dwelling with rooms in the roofspace. Associated amenity space”.
Section 02
Decision
The appeal is dismissed.
Section 03
[name]
The description on the application form is inaccurate as it refers to the erection of a two storey building which is not evident from the plans and other appeal documents. Therefore, I have used the amended description from the decision notice and appeal form which I consider is a more accurate description of the development proposed.
Section 04
Main Issue
The main issue is whether the site is a suitable location for the proposed development, with particular regard to national and local policy relating to flood risk.
Section 05
Reasons
The appeal site is a vacant plot of land located between existing houses on [address]. The site is currently bound by hoarding and has extensive overgrown vegetation. The River Brent runs adjacent to the site boundary to the northwest. The proposal comprises the erection of a residential dwelling fronting [address], with associated garden space to the rear.
Policy ECC03 of the Barnet Local Plan 2021-2036 (adopted March 2025) (the Local Plan) and paragraphs 173-175 of the National Planning Policy Framework (December 2024) (the Framework) seek to ensure that development proposals are located in areas at the lowest risk of flooding from any source, via the application of the sequential test (ST). Paragraph 023 of the flood risk and coastal change Planning Practice Guidance (PPG) explains that avoiding flood risk through the ST is the most effective way of addressing flood risk because it places the least reliance on measures like flood defences, flood warnings and property level resilience features.
Paragraph 175 of the Framework provides an exception to the requirement for a ST, in situations where a site-specific flood risk assessment demonstrates that no built development within the site boundary, including access or escape routes, land raising or other potentially vulnerable elements, would be located on an area that would be at risk of flooding from any source, now and in the future (having regard to potential changes in flood risk).
Paragraph 027 of the PPG states that a proportionate approach should be taken in applying paragraph 175 of the Framework. Where a site-specific flood risk assessment demonstrates clearly that the proposed layout, design, and mitigation measures would ensure that occupiers and users would remain safe from current and future surface water flood risk for the lifetime of the development (therefore addressing the risks identified e.g. by Environment Agency flood risk mapping), without increasing flood risk elsewhere, then the ST need not be applied.
Parts of the site fall within [name] 1, 2 and 3. The proposed garden space would be within [name] 2 and 3, which are areas with a higher flood risk. The flood risk assessment submitted with the appeal lacks substantive detail regarding the impact on the proposed garden area. While there is no built form proposed within the garden space, it would constitute built development for the purposes of paragraph 175 of the Framework as it would be a potentially vulnerable element of the proposal where flood risk could cause risk to future occupiers.
The flood risk assessment identifies a range of mitigation measures to mitigate fluvial flood risk in parts of the site with higher flood risk. While such solutions could be effective, they would introduce reliance on specific measures rather than avoiding flood risk, which is not consistent with the aim of the sequential approach. The identified measures also seem to focus on the proposed dwelling rather than the whole site including the rear garden area.
Given the lack of detail provided, it would not be appropriate to employ the proportionate approach advocated by the PPG in this instance, and therefore, the ST exception in the Framework would not apply.
I have been referred to previous appeals at the site from May 20241 and May 20252, which were both dismissed for reasons including the failure to submit sufficient substantive evidence which demonstrates the application of the ST. A ST has been submitted as part of the current appeal, but submission does not in itself ensure compliance with policy. Therefore, the previous appeals have very limited weight insofar as they relate to the content of the ST.
The Inspector in the May 2025 appeal found that the proposal did not benefit from an exception to the ST requirements in the Framework as the proposed garden of the development was at risk of flooding. The circumstances in the current appeal are very similar and therefore I have no reason to take a different approach to that taken by my colleague previously. 1 Appeal Ref: APP/N5090/W/23/3326494 2 Appeal Ref: APP/N5090/W/24/3358000
I note that there was formerly a residential use on the site, but this does not trigger an exemption to the ST requirements, as this is determined based on the development proposed.
Taking these issues into account, the proposal would trigger the requirement for a ST. PPG provides guidance on several aspects of preparing a ST, including the identification of the search area and establishing what is a ‘reasonably available’ site. However, PPG does not set out prescriptive requirements, meaning there is significant discretion on the scope of the ST.
The submitted ST sets out a clear methodology including information on the search area, site size threshold and what constitutes a ‘reasonably available’ site.
While the proposed methodology is largely acceptable and consistent with the Framework and PPG, I note the omission of sites with extant planning permission. Such sites could provide a suitable source of alternative sites and should form part of the assessment. There are sites included within the ST via other sources that have extant permission, therefore this should not be a barrier to consideration of a site in principle.
I also have concerns regarding the approach in the ST to establishing whether a site is ‘reasonably available’. The criteria identified in the ST refers to whether a site can be viably developed and whether a site is available for purchase at a fair market value. This would require detailed consideration of different aspects to determine with any accuracy; however, the ST methodology does not provide any metric or process for such an assessment, even at a high level.
Notwithstanding these concerns, the ST establishes a longlist of 236 sites from various sources, which includes some double counting of sites that are counted via multiple sources. The ST concludes that, following assessment of these sites against the methodology, there are no sequentially preferable sites for the proposed development.
Of the 236 total sites, 17 sites address most of the criteria identified in the ST and are ruled out as they are not considered to be ‘reasonably available’. Mostly, the justification given is acceptable, for example, the site has extant permission for a greater quantum of development, or there are long leaseholders on the site which would affect deliverability of development.
However, there are 2 sites where the justification provided is inadequate. Site [address] is excluded as there is an extant permission on the site for a single dwelling with a basement, which the appellant is not seeking to develop due to accessibility and cost issues. Site [address] is excluded as there is extant permission for a bungalow, which the appellant states is insufficient to meet their needs.
The PPG states that sites should be considered ‘reasonably available’ if they are able to meet the same development needs as the proposal. While the housing typologies in the extant permissions differ from the proposal, the ST suggests that both permissions relate to a single dwelling which would meet general housing needs. There is no evidence that the appeal proposal is intended to address any specialist rather than general housing needs, meaning that Sites 230 and 231 would be ‘reasonably available’ sites.
While 2 sites out of 236 is a very small proportion, the purpose of the ST is to ensure that areas at little or no risk of flooding from any source are developed in preference to areas at higher risk. As the submitted ST indicates that there could be sequentially preferable sites, the ST is not passed.
The Environment Agency have not objected to the ST. However, a lack of objection does not equate to the ST being acceptable, and therefore the lack of objection would not be determinative in my assessment of the appeal.
In addition to the 2 previous appeals on the site, I have also been provided with extracts from other appeal decisions which concluded that the ST should be applied pragmatically. However, I have not been provided with these decisions or the appeal reference numbers. I am also not provided with any details of these cases to demonstrate that the circumstances are similar to the appeal proposal. Therefore, they are not determinative in my decision.
However, the issues they purportedly raise are reflected in the Framework and PPG which are material considerations that I have had regard to when determining this appeal.
In conclusion, the proposal would not be in a suitable location with regard to flood risk and therefore would not be in accordance with Policies ECC01, ECC03, CDH02 and CDH07 of the Local Plan and Policy SI 12 of the London Plan 2021 (adopted March 2021). These policies, taken together, seek to manage the impacts of flood risk through prioritising lower risk sites and requirements relating to sustainable design and water management, to contribute to efforts to mitigate and adapt to climate change.
The proposal would not accord with paragraphs 173-175 of the Framework and the PPG, which aim to steer new development to areas with the lowest risk of flooding from any source.
The proposal would also not accord with section 2.15 of the Council’s Sustainable Design and Construction Supplementary Planning Document, which reiterates the sequential approach to the location of development and provides guidance on the scope of STs.
Section 06
Other Matters
The proposal accords with policies in the development plan and the Framework which encourage the supply of new housing in sustainable locations, identify that small sites can make an important contribution to housing delivery and promote and support the development of under-utilised land. However, these benefits would only attract limited weight in my determination of this appeal.
Several matters were raised by an interested party, including the potential for impacts relating to character and appearance and the living conditions of neighbouring occupiers. As the appeal is being dismissed for other reasons, these matters do not need to be explored in detail.
Section 07
Conclusion
The proposal would conflict with the development plan as a whole and there are no other material considerations which indicate a decision should be taken otherwise than in accordance with it. Therefore, the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 4906No official casework-database value to compare
- Extracted decision date · page 1
- 21 May 2026Matches the official casework database
- Extracted site visit dates
- 8 April 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6004635
- Application reference
- 25/3743/FUL
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Barnet
- Planning authority code
- E09000003
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Minor Dwellings
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Planning Appeals - Full
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 315 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- No
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 4 February 2026
- Valid date
- 4 February 2026
- Start date
- 11 February 2026
- Planning authority decision date
- 15 January 2026
- Appeal decision date
- 21 May 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office-s78
- Dataset status
- Current release
- Catalogue record ID
- 89154
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 20 August 2026 at 16:29