Appeal 6004659
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
for a change of use from Class C3 (Dwellinghouse) to Class C2 ([name]) to facilitate the provision of care to children with emotional and behavioural needs. The home will provide short- and medium-term placements for children aged 7 to 16 years, with a maximum of three resident children at any one time.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
In the banner heading above, I have used the description of development taken from the appeal form, as opposed to the application form, as it more accurately and succinctly describes that for which permission is sought. However, I have also had full regard in my reasoning to the description on the application form.
The address on the application form includes reference to ‘ [site address] ’. This is a description of the location, rather than part of the address. For this reason, I have omitted it from the banner heading above.
Section 04
Main Issue
The effect of the proposal on highway safety, with regard to parking.
Section 05
Reasons
The appeal site comprises a four-bedroom detached house located along [address], a narrow lane within the open countryside. The property is one of three newly constructed houses that are accessed off the lane via a shared driveway. The shared driveway is a small, paved area, serving each property.
The three houses are located at the end of a small, linear row of properties that extend along the lane, in an otherwise rural landscape. The properties along the lane each have off road parking at the front, accessed off the lane.
The appeal property has a single detached garage to the side, as do the two neighbouring properties. In addition to the detached garages, the three houses each have designated parking spaces and turning areas to the side and front, accessed via the shared driveway.
The proposed site plan shows two tandem parking spaces in front of the garage and one space to the front of the dwelling. Even though the garage would provide a parking space, the use of that space would be hindered by staff members parking in front of the garage. Indeed, with two staff members at night and two in the day, during shift change over times there could be four vehicles at the property at the same time. As such, any of the two staff members parked in the tandem spaces or the garage would need to leave before arriving members of staff could park in front of the garage.
As a four-bedroom family house, there would be vehicle movements and activity on the site frontage during certain times of the day and in the evening period, as residents attend school, appointments and activities. The use of the parking spaces throughout the day and in the evening would also be similar. However, although movements during shift change over times would be predictable, they would not be comparable to the movements of a family. In particular, although as a family home the tandem parking arrangements would require one vehicle to let the other vehicle out, during shift change over times, vehicle movements at the site would be greater.
While the appellant suggests that vehicle movements would be carefully managed, no further details have been provided. As a consequence, I am not persuaded that during the two staff change over periods vehicles would not impede the shared access driveway or have to park on the lane.
As a narrow country lane with tall hedgerows, opportunities to park a vehicle safely on the road are limited. Existing driveways and field entrances also restrict safe parking along the lane. Indeed, larger vehicles, in particular those associated with nearby agricultural enterprises could be frequent and would be impeded by vehicles parked on the road. Likewise, vehicles parked on the highway would impede visibility from the shared driveway and / or the access and parking areas of other neighbouring properties. In these circumstances, even though the instances would be for a relatively short period and no recorded accidents have occurred to date, the access arrangements and parking provision for the proposal would not be suitable and safe. As a result, unacceptable highway safety implications would arise.
Based on the evidence before me, planning conditions limiting the number of children to two would not overcome those concerns to an acceptable degree. Furthermore, without a management plan before me, there is no certainty that a suitably worded planning condition would secure appropriate measures to control and manage parking during shift change overtimes.
Consequently, for the above reasons, I conclude that the proposal would have an unacceptable impact on highway safety, with regard to parking. Therefore, it would not accord with Policy CS6 of the Shropshire Local Development Framework: [name] 2011, which seeks, amongst other things, to create sustainable places, ensuring that all development is safe with appropriate car parking provision. It would also be contrary to Paragraphs 115 and 116 of the National Planning Policy Framework (the Framework), which seek to ensure safe and suitable access to the site for all users, that prevents unacceptable impact on highway safety.
Section 06
Other Matters
The proposed development would make an efficient and appropriate use of an existing residential property to meet an identified local social need by providing safe, inclusive, and accessible accommodation for two young people in the community. The proposal would also avoid the need to create a new care facility elsewhere and it would add to the range and mix of homes in the area, to meet the needs of present and future generations. The appeal scheme would also support the local economy through the creation and retention of employment for care staff, as well as ongoing engagement with local service providers and suppliers. However, I have no substantive evidence before me that this site is the only option available, and that there are no alternative sites which would have a less harmful impact on highway safety. In these circumstances I only attach modest weight to the benefits of the scheme.
The development respects and preserves the character and quality of the local built environment, and it would safeguard the living conditions of neighbouring properties. Nevertheless, these are requirements of planning policy and taken together they carry neutral weight.
My attention has been drawn to a previous appeal decision1 elsewhere in England, also for a children’s home. However, that scheme related to a six-bedroom home in a residential area. In that case, the Inspector found no conflict with the policies of the development plan. Inevitably, it is the detail and specific context of any development which determines whether it is acceptable in practice. As such, that previous appeal decision is not comparable to the scheme before me for a four-bedroom house, located within the open countryside with unacceptable parking provision. Given this, it does not add weight in favour of the development. Accordingly, as I am required to do, I have determined the case before me on its own merits.
Overall, taking all other matters into consideration, for the reasons set out, the benefits of the scheme would not outweigh the harm to highway safety that would result from the proposed development.
Section 07
Conclusion
The proposal conflicts with the development plan as a whole and material considerations do not indicate that the appeal should be decided other than in accordance with it. For the reasons given above, I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 4685No official casework-database value to compare
- Extracted decision date · page 1
- 22 April 2026Matches the official casework database
- Extracted site visit dates
- 9 April 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6004659
- Application reference
- 25/02672/FUL
- Lead case reference
- Not recorded
- Planning authority
- Shropshire County Council
- Planning authority code
- E06000051
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Change of use
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Planning Appeals - Full
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 207 m²
- Number of residences
- -1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- No
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 5 February 2026
- Valid date
- 5 February 2026
- Start date
- 12 February 2026
- Planning authority decision date
- 19 September 2025
- Appeal decision date
- 22 April 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office-s78
- Dataset status
- Current release
- Catalogue record ID
- 87736
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 20 August 2026 at 16:29