Skip to main content
Official casework recordDismissedCurrent release

Appeal 6004678

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the erection of a single-storey extension across all nine existing blocks to create 15no. self-contained flats with associated amenity space and provision of 11 additional car parking spaces and 26 cycle spaces.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary and Procedural Matters

    Under Article 3(1) and Schedule 2, Part 20, Class A of the Town and Country Planning (General Permitted Development)(England) Order 2015 (as amended) (hereafter “the GPDO”), the construction of up to two additional storeys of new dwellinghouses immediately above the existing topmost residential storey on a building which is a purpose-built, detached block of flats, is permitted development. This is together with any or all associated: (a) engineering operations reasonably necessary to construct the additional storeys and new dwellinghouses; (b) works for the replacement of existing plant or installation of additional plant on the roof of the extended building reasonably necessary to service the new dwellinghouses; (c) works for the construction of appropriate and safe access to and egress from the new and existing dwellinghouses, including means of escape from fire, via additional external doors or external staircases; (d) works for the construction of storage, waste or other ancillary facilities reasonably necessary to support the new dwellinghouses.

    Permission is subject to the limitations set out in paragraph A.1., and is also contingent upon compliance with conditions in paragraph A.2., as well as the grant of prior approval for a specific proposal. The matters for which prior approval must be sought are set out in sub-paragraphs A.2.(1)(a) to (j); among them, (a) relates to transport and highways impacts, (e) to the external appearance of the building, and (g) to impacts on amenity of the existing building and neighbouring premises.

    The decision notice issued by the Council gave four reasons for refusal. The first related to the nature of the development, and the Council’s view that it would go beyond the scope of that permitted by Schedule 2, Part 20, Class A. The other reasons related to the three prior approval matters which I have summarised in the preceding paragraph. These four reasons form the basis of the main issues in this appeal.

  3. Section 04

    [name]

    Having regard to the above, the main issues are: • Whether the proposed development would be permitted development as provided for by Schedule 2, Part 20, Class A of the GPDO; and, if so • Whether prior approval should be granted, having regard to the matters set out in [name].2 (1) of Part 20, Class A of the GPDO; in particular:  The external appearance of the buildings;  Impacts on the amenity of the existing building and neighbouring premises including overlooking, privacy and the loss of light; and  The transport and highways impacts of the development.

  4. Section 05

    Whether permitted development

    The appeal relates to nine purpose-built, four-storey blocks of flats, dating from the mid-1970s, together referred to by the appellant as the [address] and [address] Estate. They are on a broadly L-shaped site which slopes down from south-east to north-west; Blocks 1 to 6 are at the eastern end of the site, grouped around [address], Blocks 7 to [address] at the western end. At present there are 220 flats in total in the nine blocks.

    The proposed development is the addition of new fourth-floor rooftop extensions to all nine blocks. 15 new flats would be created: two on each of Blocks 1, 2, 5, 6, 7, 8 and 9, and one on Block 4. Where blocks would have two new flats, the pair would be connected (to each other and to two access stairwells) by walkways covered with canopies; a similar canopy-covered walkway on Block 4 would link the single flat proposed for that block to two access stairwells. [name] 3 (which would not have any new flats added), 4 and 7, “rooftop pavilions” would make up considerable parts of the new additional storey.

    The Council’s decision was that these canopies and pavilions would not fall within the definition of development permitted by Part 20, Class A1. The appellant disagrees with that assessment, arguing that the canopies and pavilions would be “either engineering operations reasonably necessary to support the new dwellings or ancillary facilities that serve them”.

    The appellant has suggested that engineering operations “relate to ancillary forms of development distinct from the building of the additional storey of living accommodation”. I do not think that is a persuasive definition. [name] have set out in paragraph 3 above, Part 20, Class A allows at [name].(a) those engineering operations reasonably necessary to construct the additional storeys and new 1 While the Council’s officer report might, on my reading, perhaps be considered somewhat ambiguous as far as the canopies are concerned, its appeal statement is not; I therefore address both elements here. dwellinghouses. Neither the canopies nor pavilions would, as far as I am aware, have any structural or other physical supporting role as far as the buildings (existing or extended) are concerned, nor is there anything to suggest that erecting them would be a necessary step on the way to constructing the additional storeys and flats. Even applying a generously broad interpretation of the term, there is nothing before me which in any way convincingly supports the argument that the canopies or pavilions would be “engineering operations” in the sense required b the GPDO here.

    I am more comfortable with the appellants’ suggested interpretation of ancillary facilities as relating “to features of the development that support the proposal”, though I might put a stronger emphasis on the subsidiary role implied by the term. The proposed canopies would be found on all of the blocks apart from Block 3. These would cover the walkways from the new flats on the proposed fourth floor to the extended stairwells and, as the appellant put it, it would “avoid residents and visitors being impacted by inclement weather and providing a pleasant access and egress environment”.

    Whether it would be reasonably necessary for the canopies to be as extensive as proposed here is perhaps debatable. For example, Blocks 2, 5 and 7 would have very long covered walkways, and I have not been made aware of any particular reason why each pair of flats would need to be connected in that way. Broadly speaking, however, I do not think it would be inherently unreasonable to provide, or for future residents to expect, covered routes to and from their flats. I am therefore of the view that canopies and covered walkways could, at least in some form, be considered reasonably necessary ancillary facilities.

    I do not, however, think that the same could be said of the proposed rooftop pavilions. These were described in the submitted Design and [name] as having been a response to the constraint existing rooflights on Blocks 3, 4 and 7 would put on potential development, and having been proposed “to maintain a unified architectural language across the estate”. The pavilions would incorporate landscaped rooftop gardens, but these would be accessible only for maintenance purposes – they would not provide any amenity space (whether private or communal) for the new flats, nor would they appear to have any other practical purpose in relation to them.

    The pavilions and rooftop gardens would not be minimal or incidental elements of the appeal proposal. For the reasons I have set out in the preceding paragraph, I cannot sensibly find that they would be ancillary facilities reasonably necessary to support the new dwellinghouses. As such, I conclude that the proposal would not be permitted development.

  5. Section 06

    Prior approval matters

    I have found that the proposal would not be development permitted by Schedule 2, Part 20, Class A of the GPDO. It is not therefore necessary for me to consider the detailed prior approval matters set out in [name].2., as any findings on those issues could not change my overall decision.

  6. Section 07

    Other Matters

    Among the site’s planning history are three other appeal decisions to which both main parties referred. These are: • A February 2020 decision relating to a development described as the “erection of part 1, part 2 storey rooftop extensions to seven existing blocks to create 19no. self-contained flats, with private amenity space and ancillary gym within Block 7 and external lift shafts to each block. Provision of 21 additional parking spaces, 50 cycle spaces, external children’s play space, photovoltaic (PV) panels and upgrading of existing refuse and recycling stores and new landscaping and access arrangements” 2; • A September 2021 decision relating to a development described as “a single storey rooftop extension to provide 48 additional residential dwellings” 3; and • An October 2022 decision relating to a development described as “the erection of single storey rooftop extension across all blocks to create 48no. self-contained flats with provision of 16 additional car parking spaces and 50 cycle spaces” 4. The first of those appeals related to a refusal to grant planning permission, the second and third to applications for prior approval under Schedule 2, Part 20, Class A of the GPDO.

    The appellant considered that this proposal has addressed the reasons for which those previous appeals were dismissed. [name] have found that the current appeal scheme would not be permitted development, it has not been necessary for me to consider the prior approval matters – indeed, to do so could unreasonably fetter a decision maker dealing with any future proposal which might come forward. My conclusion in this appeal would not have any bearing on any subsequent similar application for planning permission which might be made.

  7. Section 08

    Conclusion

    For the reasons given above, I conclude that the proposal would not be permitted development under Schedule 2, Part 20, Class A of the GPDO. The appeal is therefore dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 155No official casework-database value to compare
    Extracted decision date · page 1
    16 June 2026Matches the official casework database
    Extracted site visit dates
    30 April 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6004678
Application reference
25/2595/PNV
Lead case reference
Not recorded
Planning authority
London Borough of Barnet
Planning authority code
E09000003

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Major dwellings
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Prior Approval
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
24,000 m²
Number of residences
15
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
5 February 2026
Valid date
5 February 2026
Start date
13 February 2026
Planning authority decision date
15 August 2025
Appeal decision date
16 June 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
90467
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29