Skip to main content
Official casework recordDismissedCurrent release

Appeal 6004706

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

5 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

Prior approval application for Change of use from Commercial, Business and Service (Use Class E) to form 9 residential units (Use Class C3) under the Town and Country Planning (General Permitted Development) (England) Order 2015 as amended Schedule 2, Part 3, Class MA.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Background and Main Issue

    The description of development has been amended since the original application submission. This revised description has been adopted by both main parties within their appeal submissions and, as it provides greater precision and clarity, I have also done the same.

    The appellant has referred to a subsequently refused prior approval application on the appeal site1. However, as this decision post-dates the close of submissions for this appeal and no substantive details have been provided, I attach no meaningful weight to it.

    Under Article 3(1) and Schedule 2, Class MA of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (the GPDO), planning permission is granted for a change of use of a building from a use falling within Class E (commercial, business and service) to a use falling within Class C3 (dwellinghouses), subject to conditions. These include a requirement to apply to the local planning authority for a determination as to whether prior approval will be required in respect of various matters.

    The Council determined that prior approval was required and was refused, for a single reason, this forms the basis for the main issue for this appeal - whether the proposed building would be safe from flooding. 1 RU.26/0228

  3. Section 04

    Reasons

    The appeal site lies within [name] 2 and is therefore at risk of fluvial flooding associated with the [name]. The current use of the site is classified as ‘less vulnerable’, whereas the proposed change of use would increase this to a ‘more vulnerable’ residential use. Whilst the building itself is only predicted to experience shallow flooding during the design flood event, the surrounding area, including the local road network, is shown to be affected. As a result, the key issue is whether future occupants would be able to safely access and exit the site during flood conditions. The proposed access route in this case would run from the appeal site along [address] and the [address].

    The SFRA sets out that a safe access/egress route should allow occupants to safely enter and exit buildings and be able to reach land outside of the flooded area, without the intervention of emergency services or others during flood conditions, including climate change allowances. It also sets out that it is acceptable for access/egress routes to be wet in Runnymede so long as the flood hazard is no greater than ‘[name] – Caution’ along the full length of the access/escape route. The route should also be along publicly accessible roads or paths.

    The above policy context and mitigation expectations are broadly consistent with the Framework. This states that development should only be allowed in areas at risk of flooding where safe access and escape routes are included where appropriate, as part of an agreed emergency plan. National Planning Policy Guidance (NPPG) further guides that access routes should enable occupants to safely access and exit their dwellings during design flood conditions.

    The appellant contends that the road is slightly higher than the EA flood model shows. Whilst the Council does not directly dispute this, it considers that it is not possible to adjust part of the model without recalculating the whole system, as doing so could generate unreliable results. In this regard, I am mindful that flood models operate as interconnected systems, and even small local changes in ground levels have the potential to affect flood depths, routes and velocities elsewhere.

    The appellant’s approach compares updated survey data with the EA model and recalculates hazard ratings along the route, based on a relatively minor difference in land levels of around 100mm. I recognise the concern that the EA model does not fully reflect real-world conditions, including buildings and obstructions, which may overestimate flood velocities and create unrealistic flow paths. The appellant suggests floodwater would instead pond locally.

    However, whilst I acknowledge the argument that more detailed modelling may be disproportionate for a development of this scale, this “real world” scenario has not been tested within a recalibrated model. As such, the extent to which flood behaviour may differ from the EA outputs remains uncertain. Although the Council has not fully engaged with the limited scale of the level differences or the short length of the route, I accept that unmodelled changes introduce uncertainty.

    In any event, even if I were to accept the appellant’s methodology, both parties agree that part of the route would still exceed the “very low hazard” threshold. The access and egress route runs from the appeal site along [address] and then onto the [address], providing the only connection to land outside the flood extent. The route to safety is approximately 140m in length, and on the appellant’s own assessment a localised section of around 30m, just over 20% of the route, is subject to higher hazard ratings. This section corresponds with lower ground levels and is predicted to experience deeper flooding, with hazard levels reaching “moderate” to “significant” at peak conditions, indicating a potential risk to people.

    National guidance expects access routes to remain safe, taking account of flood depth, speed and overall hazard. Similarly, the [name] advises that routes should avoid anything above “very low hazard – caution”. As this section exceeds that level, it suggests that people would need to pass through potentially unsafe conditions, which does not align with the expectations for a safe escape route.

    I appreciate that the appellant considers these conditions to be manageable and notes that the route follows an urban street environment with footways and crossing points. These characteristics, together with the enclosed form of the street, may mean that conditions are less severe than those indicated by the model. Nevertheless, the route represents the only means of escape from the site to the [address] and beyond, and the presence of footways and urban features does not remove the potential for hazardous flooding where water depths or velocities are sufficient.

    Importantly, the test is whether the route as a whole is safe, not whether the majority of it meets the relevant threshold. Although the section of concern is limited in extent and may, in reality, behave more like shallow, slow-moving or ponded water, it is unavoidable and represents the weakest part of the route. Given the absence of robust evidence confirming how floodwater would behave in this location, and the reliance on untested assumptions, I cannot conclude with sufficient certainty that a safe means of access and egress would be available during the design flood event.

    I note that the appellant places reliance on a [name] and Evacuation Plan, with occupants expected to leave the site in advance of flooding. However, I am not persuaded that it provides a sufficient level of certainty in this case. Similar to the decisions at [address] (3360609) and [address], Chertsey (3365693), there is no guarantee that occupants would evacuate at an early stage, particularly where their own properties are not immediately at risk. As such, reliance on behavioural responses and management measures cannot replace the need for a clearly safe and reliable access and egress route.

    Furthermore, even where adequate warning time may exist - the appellant indicates it would be passable for up to 11 days, the presence of a higher hazard section along the route remains. The existence of an evacuation strategy does not overcome concerns where occupants would still be required to pass through areas of elevated flood hazard, or where the route itself is not consistently safe. In this case, the effectiveness of the evacuation plan depends on assumptions about how occupiers would respond and does not remove the need to demonstrate that the route itself would remain safe during the design flood event.

    The PPG states that proposals that are likely to increase the number of people living in areas of flood risk require particularly careful consideration, as they could increase the scale of any evacuation required. It would therefore be unreasonable to add to demands on the emergency services who would already be under pressure during a flood event.

    My attention has been drawn to a number of approvals for schemes where there is reliance upon an evacuation plan and/or management measures. These include a number along [address], including Marchamont House2, The White Lion3 and [address] Road4. [name] note that these schemes also identified short sections of higher hazard along the route, and in some cases relied on evacuation plans and trigger points, the full circumstances of those decisions are not before me. I have limited information regarding the precise flood modelling, route conditions and the safeguards that were secured. As such, I cannot conclude that those schemes are directly comparable or that the same conclusions should apply in this case.

    In relation to Lakeside East5, I note that this was a large-scale development, with on-site management and specific trigger mechanisms, including a flood gauge, forming part of the evacuation strategy. This differs materially from the current proposal in terms of scale and operational control, and it is not clear that the same level of management and coordination could be relied upon here. Similarly, [address] appears to have been accepted on the basis of active site management by the local authority itself, which again represents a materially different context.

    Other examples, such as the [name] Station6, are said to have raised similar concerns about sections of the route exceeding “very low hazard”, but the outcome appears to have depended on site-specific evidence and judgement. Without the full detail of those cases, including how the hazard was assessed and what weight was given to it, they provide only limited assistance in determining the current appeal.

    Overall, whilst these schemes indicate that similar issues have arisen elsewhere, they do not outweigh the specific evidence before me, which identifies a section of the route exceeding acceptable hazard thresholds and lacks sufficient certainty as to its safety.

    I have also been referred to the [name] as a factor in reducing flood risk. However, this is a large-scale infrastructure project which does not currently have consent, as no formal application has been submitted through the [name] process, and works have not commenced. As such, there is no certainty as to its delivery, timing or the extent of flood risk reduction that would be achieved at the appeal site. Accordingly, this attracts very modest weight.

    In light of the above, I am not satisfied that it has demonstrated that future occupants would be safe from flood risk, or that safe access and egress would be available during the design flood event. The proposal would therefore fail to satisfy condition MA.2(2)(c) of Class MA in respect of flooding risks in relation to the building, and prior approval should not be granted. 2 RU.20//0814 3 RU.18/1719 4 RU.21/0530 5 RU.21/0483 6 RU.15/1800

    Insofar as they are relevant, the proposal would also conflict with Policy EE13 of the Local Plan, the related provisions of the SFRA, and the aims of the Framework in respect of managing flood risk for new development.

  4. Section 05

    Conclusion

    For the reasons set out above, the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 5315No official casework-database value to compare
    Extracted decision date · page 1
    27 May 2026Matches the official casework database
    Extracted site visit dates
    20 May 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6004706
Application reference
RU.25/1507
Lead case reference
Not recorded
Planning authority
Runnymede Borough Council
Planning authority code
E07000212

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Change of use
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Prior Approval
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
460 m²
Number of residences
9
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
5 February 2026
Valid date
5 February 2026
Start date
11 February 2026
Planning authority decision date
9 December 2025
Appeal decision date
27 May 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
89387
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29