Appeal 6004707
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
replacement of a residential studio with a self-build dwelling.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
I have adopted the description of development from the appeal application form.
The application is made in outline form with all matters save for access reserved for future consideration. As such, I have treated the submitted plans depicting the layout as largely indicative in nature.
Section 04
Main Issue
The main issue in the appeal is whether the proposal complies with the development plan in relation to access to services and minimising the need to travel by private vehicle.
Section 05
Reasons
The appeal site is located in [name] which is close to the village of Rattery, a modest distance to the north-east. Rattery has a nucleated centre, including a public house and place of worship. It has a concentration of dwellings around these facilities and the Village Hall is located a short distance to the south.
The appeal site is a part of the domestic curtilage associated with the host dwelling, Fairlight. A separate residential use of land appears to exist to the north, formed from a subdivision of the sizeable planning unit associated with Fairlight. The appeal site sits between the host dwelling and separate residential use of land. The main part of the site is occupied by a large blockwork building which the evidence indicates has existed since the early 1980s. It still appears to be in good, functional condition and is used for the storage of garden implements.
In terms of the applicable planning policies, the development plan for the area includes the Plymouth and South West Devon Joint Local Plan (JLP) 2014-2034 (adopted 2019). JLP policy SPT1 sets out an overarching strategy for development of the area and indicates that development will be planned for and managed to deliver sustainable economic, societal and environmental change, including through ensuring that neighbourhoods have a mix of local services and community assets and greenspace to meet their needs, as well as sustainable and health promoting transport options to enable access to local education, services and jobs.
JLP policy SPT2 sets out the principles of sustainable rural communities and sets out how the creation of communities should support the overall spatial strategy through the creation of neighbourhoods. The requirements include for communities to have reasonable access to a vibrant mixed use centre, which meets daily community needs for local services such as neighbourhood shops, health and wellbeing services and community facilities and where they are well served by public transport, walking and cycling opportunities.
JLP policy TTV1 sets out the principles for distribution of homes and jobs across a defined hierarchy of settlements which comprises four tiers. Sustainable villages form the third tier of the hierarchy and are where development intended to meet a locally identified need and to sustain limited services may be acceptable in principle. The lowest tier of the hierarchy is made up of the smaller villages, hamlets and the countryside where development is only likely to be permitted if it can be demonstrated to support the principles of sustainable development and communities as outlined in policies SPT1 and 2 and policies TTV26 and TTV27.
In the preamble to policy TTV1, Rattery is listed as a Sustainable Village. The JLP also apportions a housing growth allowance to the [name] in the latter stages of the plan period. The undisputed evidence of the appellant indicates that Rattery is intended to deliver up to around ten dwellings over the plan period but that as at the date of refusal of the appeal scheme, no dwellings have been built in the village.
Policy TTV26 (1) relates to isolated development in the countryside. The Council’s position is that the development is not isolated in this sense and I do not find reason to conclude otherwise.
Policy TTV26 (2) sets out that in order to protect the special characteristics and role of the countryside, where appropriate, development should meet a range of criteria, including those relating to protection of public rights of way; re-use of traditional buildings; avoiding prejudicial effects on agricultural operations; responding to a proven agricultural, forestry and other occupational need for a countryside location; avoiding Best and [name]; and helping to enhance the immediate setting of the site. The development does strictly engage any of the criteria of TTV26 (2), but of most relevance, does not seek to respond to a strict need for a countryside location.
Policy TTV27 relates to affordable housing, the benefits of which can, in some cases, outweigh the harm associated with developing in a location that is less than optimum in terms of its relationship with the existing built form and connectivity to services. However, the proposal has not been offered on the basis that it is an affordable dwelling to meet an identified local need and therefore is not applicable.
The proposal is promoted as a replacement of the studio building which does not have a lawful use for residential purposes in its own right. Its use is incidental to the host dwelling, Fairlight. Therefore, the proposal would introduce an additional residential dwelling to this location.
I accept that Rattery is defined as a Sustainable Village under the terms of the JLP and has an allocation for a small amount of housing growth. The built form of the sustainable villages is not defined in the JLP and there is no neighbourhood plan specific to Rattery to indicate the built limits of the village or where housing growth should or could occur.
However, on the ground, and despite signage that welcomes visitors to Rattery village on arrival at [name], the appeal site sits someway out of the built limits of the village. The built limits of the village appear to encompass the Village Hall to the south, the nucleated development in the centre around [address] and extends up to dwellings along [name] to the north. [address] Cross is a ribbon form of development, it does not extend along the length of the road towards the Village Hall. It is divorced from the main built form by a stretch of road which is typically rural and narrow, subject to the national speed limit and without footways or streetlighting. Whilst the character of the roads within Rattery itself are also rural without streetlights and footways for much of their length, the nucleated form of the village allows pedestrian movements between the facilities where driving speeds are limited to 20mph, influenced also by the presence of dwellings and buildings within a constrained street environment.
Given that residents in Rattery itself do not have access to public transport services from the village itself, they too are highly reliant on private vehicles. However, whereas residents located within the built form of Rattery could access its modest village facilities on foot, residents at the appeal site would not have an option to do so without endangering themselves or other highway users. This means that all journeys to and from the appeal site to enable residents to meet most of their day-to-day and social needs would be by vehicle. The creation of such a degree of dependency on the private vehicle would be in conflict with the aforementioned development plan policies when taken as a whole and would not align with the JLP’s promotion of sustainable growth for Rattery by means that would more directly grow the village and increase the use of its facilities. Whilst it may seem a marginal difference to allow development ‘within’ Rattery and not a modest distance outside of Rattery, the pattern of development that would result if these distinctions were repeatedly diminished would clearly be at odds with the well-considered spatial objectives of the development plan.
I have noted the description of development refers to the dwelling being ‘self-build’, presumably referring to the form of housing so defined under the Self-Build and [name] Regulations1. Whilst the Council has a duty to ensure that sufficient plots are consented to meet the needs for self-build dwellings, no detail has been provided to indicate whether this duty is being met or whether the proposal could count as a contribution to any shortage in plots. Furthermore, there has been no planning obligation offered to secure the dwelling as anything other than an open market dwelling with unrestricted occupation.
Taking all these aspects together, the nature and location of the development conflicts with JLP policies STP1, STP2, TTV1 and TTV26 with regard to access to services and minimising the need to travel, particularly by private vehicle. 1 Self-build and Custom Housebuilding Act 2015 (as amended by the Housing and Planning Act 2016)
Section 06
[name]
The Council indicate that it cannot demonstrate an adequate five year supply of housing land with associated buffer as required by the National Planning Policy Framework (the Framework). The Council’s evidence indicates that the supply position is in the region of around 2.53 years, albeit from an unspecified base date and without any quantification of the extent of the shortfall in numbers of units. Nonetheless, I have adopted the position that the shortfall, at around half the required amount, should be considered substantial.
Section 07
Planning Balance and Conclusion
As the Council cannot demonstrate a five year supply of housing at the present time, the provisions of paragraph 11 d) of the Framework are engaged. This requires that in such circumstances, permission should be granted unless (i) any particular Framework policies that protect areas or assets of particular importance provide a strong reason for refusal, or (ii) any adverse impacts of granting permission would significantly and demonstrably outweigh the benefits, when assessed against the Framework taken as a whole and having particular regard to key policies for directing development to sustainable locations, making effective use of land, securing well-designed places and providing affordable homes.
The scheme would deliver a single open market dwelling which would contribute to the substantial shortfall in housing land supply. It would also generate some economic benefits during the construction period. I attribute these benefits modest weight, commensurate with the modest scale of the scheme.
I have noted that the appellant has offered to include sustainable construction measures within the proposed dwelling which attracts limited weight in support of the development. I have also noted the absence of other technical objections in relation to highways, drainage, arboricultural impacts, neighbour and landscape effects which could not otherwise be addressed by way of condition and/or at reserved matters stage. The absence of other harms weighs is a neutral factor in the overall balance.
However, the adverse impacts would be a future household entirely reliant on private vehicle which would be at odds with the objectives of the development plan. Owing to their accordance with the Framework’s policies that direct development to sustainable locations, these policies still attract considerable weight. As such, the adverse impacts of granting permission would significantly and demonstrably outweigh the modest benefits. In the circumstances, the presumption in favour of sustainable development does not apply.
The development conflicts with the development plan when taken as a whole. There are no other considerations that indicate that a decision should be made other than in accordance therewith.
Consequently, the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 160No official casework-database value to compare
- Extracted decision date · page 1
- 17 June 2026Matches the official casework database
- Extracted site visit dates
- 9 June 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6004707
- Application reference
- 0797/25/OPA
- Lead case reference
- Not recorded
- Planning authority
- South Hams District Council
- Planning authority code
- E07000044
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Minor Dwellings
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Planning Appeals - Outline
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 960 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- No
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 5 February 2026
- Valid date
- 18 February 2026
- Start date
- 18 February 2026
- Planning authority decision date
- 10 October 2025
- Appeal decision date
- 17 June 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office-s78
- Dataset status
- Current release
- Catalogue record ID
- 90542
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 20 August 2026 at 16:29