Skip to main content
Official casework recordSplit DecisionCurrent release

Appeal 6004714

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

single storey rear extension following the demolition of an existing conservatory, rear dormer and internal reconfiguration throughout the existing dwelling.

  1. Section 02

    Decision

    The appeal is dismissed insofar as it relates to the proposed single storey rear extension and planning permission is refused for this aspect of the proposals. The appeal is allowed insofar as it relates to the rear dormer and internal configuration and planning permission is granted for these aspects of the proposals at [site address] in accordance with the terms of the application, Ref PA25/3502, and the plans submitted with it, so far as relevant to that part of the development hereby permitted and subject to the conditions set out in the schedule.

  2. Section 03

    Preliminary and Procedural Matters

    The original application was refused permission for 4 reasons. The Council had alleged in reasons for refusal 3 & 4 respectively that the appellant had failed to demonstrate that the proposed development would not detrimentally affect: (a) the living conditions of neighbours at [address] by reason of the impact on daylight and sunlight, and (b) the health and longevity of nearby trees.

    The appellant produced a Daylight and Sunlight and Arboricultural reports for the appeal. The Council was given the opportunity to comment on both reports. In its response the Council accepted that the reports suitably addressed reasons for refusal 3 & 4. However, an objection was made by the occupants of [address] as to the alleged impact of the proposal, and this is reflected in the main issue identified below. Arrangements had been made for me to visit [address] as part of my inspection of the appeal site and surroundings.

    A Right of Light report was also submitted at appeal stage but as explained in that report ‘..A right of light is a civil matter between neighbours and is independent of the planning system.’ I agree; accordingly, I have not taken this report into account.

    The appeal property is designated as a Building of [name] by the Council and therefore falls to be considered as a Heritage Asset as defined in the Framework1. Nevertheless, such local designation does not prevent the owner carrying out certain forms of permitted development, that is, development not requiring the Council’s previous permission.

    In this regard I note that since the date of the refusal leading to this appeal the appellant has obtained a Certificate of Lawfulness in respect of the rear dormer. The proposed dormer subject of the Certificate and appeal respectively appear strikingly similar if not identical. This is a significant fall-back to which I attach great weight, since in effect, the appellant has already received planning permission for the dormer.

    For the reasons set out in the officer report, the Council does not object to the design of the proposed single storey rear extension in terms of its appearance and effect on the character and appearance of the building and its surroundings. Judging from my site visit I have no reason to disagree with the Council’s view on this aspect.

  3. Section 04

    Main issue

    The main issue is the effect of the proposed single storey rear extension on the living conditions of the residents of [address] with reference to sunlight, daylight and visual impact.

  4. Section 05

    Reasons

    The parts of No 22 most susceptible to harm arising from the effects of the proposal on sunlight and daylight are the internal spaces within the rear ground floor and the patio area serving the dwelling. The rear ground floor space within No 22 is open plan, being a combined sitting/dining and kitchen area. The internal environment was light and airy during my visit, not least because it was a sunny morning.

    Bearing in mind that the proposed extension would replace another, that it projects further into the garden than before, and that the proposed roofing material is different, I consider the report produced by the appellant in respect of daylight and sunlight to have been professionally undertaken in accord with normally accepted practice. The report and my own visual assessment, having full regard to the sun’s usual daily pathway and current BRE advised standards2, satisfies me that the impact on sunlight and daylight affecting No 22’s internal environment and its patio area would be slight and not unacceptable. Accordingly, I do not consider that the proposed single storey extension would harm the residents of No 22 by reason of unacceptable loss of sunlight or daylight.

    From within No 22, its patio and garden the existing single storey structure to be replaced is perceived as a lightweight structure on account of its glazed upper panels and largely glazed roof structure. I note the proposed re-use of glazed panels above brickwork on the elevation facing No 22. Whilst understanding the design reasons for the proposed use of solid roof cladding panels, these would alter the current perception of lightness, particularly when combined with the proposed elongation of the extension into the garden. Since the structure would 1 National Planning Policy Framework. 2 Building Research Establishment stand virtually on the common boundary shared by Nos 20 and 22, I consider that the development would appear visually intrusive, dominating and oppressive when viewed from those parts of No 22’s garden and patio closest to it, and from its rear ground floor windows.

    I conclude that the proposed single storey extension would have an adverse and unacceptable effect on the living conditions currently enjoyed by No 22’s residents on account of its harmful visual impact. Accordingly, a conflict arises with those provisions of policy 46 of the Richmond upon Thames Local Plan requiring new development to protect the amenity and living conditions of the occupants of neighbouring properties and to ensure that proposals are not visually intrusive or have an overbearing impact.

  5. Section 06

    Overall conclusions

    I find the appeal proposals to be acceptable in part, but unacceptable in other respects. I have considered issuing a split decision and find that I can do so since the various elements appear to be clearly severable. In the light of the Certificate already granted, the proposed dormer, irrespective of the Council’s view on merits, may be built without a formal planning permission.

    Permission is therefore granted for the dormer element of the scheme. It is necessary to impose a condition identifying the approved plans in the interests of certainty. However, for the reasons already provided the appeal in respect of the rear single storey extension is dismissed.

  6. Section 07

    Other matters

    I have considered all other matters raised in the representations including the references to the Framework and the Council’s Supplementary Planning Document for [name] and [name]. I have also considered the representations made by the residents of No 22, the adjoining property. Regarding their comments on the accuracy of the plans, I found them, as did the Council, to be clear as to the appellant’s intentions, and I found no difficulty in fully understanding the proposals. No other matter raised is of such strength or significance as to outweigh the considerations leading to my conclusions.

  7. Section 08

    SCHEDULE OF CONDITIONS

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans in so far as they relate to the rear dormer and internal reconfiguration : 2.20.TED.E.01; 2.20.TED.E.02; 2.20.TED.E.03; 2.20.TED.E.04; 2.20.TED.E.10; 2.20.TED.E.11; 2.20.TED.E.12; 2.20.TED.E.13; 2.20.TED.P.01; 2.20.TED.P.02; 2.20.TED.P.03; 2.20.TED.P.03; 2.20.TED.P.10; 2.20.TED.P.11; 2.20.TED.P.12; 2.20.TED.P.13; 2.20.TED.S.01 & 2.20.TED.S.02.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 2949No official casework-database value to compare
    Extracted decision date · page 1
    27 April 2026Matches the official casework database
    Extracted site visit dates
    9 April 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6004714
Application reference
PA25/3502
Lead case reference
Not recorded
Planning authority
Richmond Upon Thames London Borough Council
Planning authority code
E09000027

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Householder
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
663 m²
Number of residences
Not recorded
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Split Decision
Decision category
Split decision
Received date
5 February 2026
Valid date
5 February 2026
Start date
12 February 2026
Planning authority decision date
5 December 2025
Appeal decision date
27 April 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office
Dataset status
Current release
Catalogue record ID
87908
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21