Skip to main content
Official casework recordDismissedCurrent release

Appeal 6004719

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

construction of a single-storey rear extension (retrospective), including the installation of a patio door to the extension (proposed).

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    [name]

    I note that part of the development has already been carried out. The extension has been constructed but the patio door has not been installed. For the avoidance of doubt, I have determined the appeal based on the submitted plans.

  3. Section 04

    [name]

    The main issues in this appeal are: • whether the proposal provides acceptable living conditions for existing and future occupiers, with particular regard to the provision of amenity space; and • whether the development exposes existing and neighbouring occupiers to an unacceptable fire safety risk.

  4. Section 05

    Living conditions

    The appeal site comprises a mid-terraced house in a residential street. There is a small hardstanding area in front of the dwelling. The properties in the terrace have small rear gardens and the site forms part of an approved development1 where permitted development rights for rear extensions and structures were restricted. The proposal is for a single storey rear extension.

    The Council’s Householder Development Supplementary Planning Document 2025 includes guidance on rear extensions, stating that they must not take up more than 50% of the total rear garden space. 1 Planning permission ref 95/AP/0592

    The Council indicates that the rear garden was originally around 22sqm. The parties dispute the amount of rear outdoor space that remains following construction of the extension, with the Council indicating this to be around 7.75sqm and the appellant stating that it is around 8.3sqm. Whichever figure is used, the extension occupies considerably more than 50% of the rear garden.

    The rear garden space was modest to begin with, and only a relatively narrow strip sandwiched between boundary walls and fences now remains. Its small size makes this outdoor area inadequate for a family dwelling. As such, the proposed extension has resulted in an unacceptable loss of outdoor amenity space for existing and future occupiers of the house.

    It is indicated that the extension only occupies around 37% of the original front and rear outside spaces. However, the front hardsurfaced area is open to the street, providing pedestrian and vehicular access to the property. As such, it does not function as private, usable outdoor space and does not replace the need to retain an adequately sized rear garden.

    Therefore, I conclude that the proposal provides unacceptable living conditions for existing and future occupiers, with particular regard to the provision of amenity space. This is contrary to Policy D6 of the London Plan 2021 (London Plan) and Policies P15 and P56 of the Southwark Plan 2022. Together, these require development to provide high quality accommodation which does not cause an unacceptable loss of amenity to present or future occupiers, including the provision of usable private amenity space.

  5. Section 06

    Fire safety

    Fire safety compliance is covered by the Building Regulations. Nonetheless, to ensure that proposals meet the highest standards of fire safety, Policy D12 of the London Plan 2021 (London Plan) sets out various requirements in this regard. This includes ensuring that developments are constructed in an appropriate way to minimise the risk of fire spread.

    The appellant’s [name] (FSS) sets out measures to address fire safety issues. It indicates that as the extension is a dining room, there are no cooking appliances, open flames or electric heating elements, and this was evident at my site visit. It also outlines that no additional fire-resistant separation is required as it is a single storey extension.

    The FSS states that the proposed construction materials are appropriate given the use and height of the extension and the presence of fire detection and suppression measures. However, due to the timber construction with uPVC cladding and the location of the extension less than 1m from the neighbouring property, the Council raises concerns regarding the potential for external fire spread.

    No building control certificate has been submitted, and the Council’s Building Control Manager advises that the combination of combustible materials and the proposed siting give rise to fire safety concerns. The extension has a ceiling mounted smoke alarm and portable fire extinguisher, and the FSS sets out means of escape and provision for emergency access in the event of a fire. Nevertheless, these measures do not address the fire risks associated with the construction materials nor demonstrate how fire spread between buildings is to be mitigated.

    Consequently, I conclude that it has not been demonstrated that the development does not expose existing and neighbouring occupiers to an unacceptable fire safety risk. Therefore, the proposal conflicts with Policy D12 of the London Plan.

  6. Section 07

    Other Matters

    The proposed scheme is intended to provide usable dining accommodation for family members in a multi-generational household, including those with mobility needs. Therefore, I have had regard to the Public Sector Equality Duty (PSED) contained in section 149 of the Equality Act 2010. The duty includes having regard to the need to eliminate discrimination, harassment and advance equality of opportunity between those sharing relevant protected characteristics and those who do not. [name] am mindful of the needs of the family members, it has not been demonstrated that the scale of the proposal is specific to their needs, or that they cannot be met by a less harmful scheme. Thus, the PSED considerations do not outweigh the harm that I have identified, and following careful consideration of these matters, I am satisfied that the impact of dismissing this appeal is proportionate and justified.

    The appellant states that the proposed development improves thermal performance, but there is no substantive evidence to demonstrate that this is a benefit of the proposed scheme.

    There is reference to the Council’s approval of a several other single storey domestic extensions in the vicinity where it did not find harm in terms of living conditions and fire safety. However, limited information on those proposals has been submitted so I am unable to compare them with the scheme before me.

    The Council did not find harm or development plan conflict in relation to several other matters, including character and appearance, neighbouring living conditions and impacts on heritage assets. Nonetheless, even if I were to agree with the Council on these points, the absence of harm is a neutral matter which does not carry weight in favour of the scheme.

    The appellant has expressed general dissatisfaction with the Council’s validation and communication on the application, but this is a matter between those parties and does not in this instance have any bearing on my determination of this appeal.

  7. Section 08

    Conclusion

    For the reasons given above, the proposal conflicts with the development plan and the material considerations do not indicate that the appeal should be decided other than in accordance with it. The appeal is therefore dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 7963No official casework-database value to compare
    Extracted decision date · page 1
    13 March 2026Matches the official casework database
    Extracted site visit dates
    9 March 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6004719
Application reference
25/AP/2410
Lead case reference
Not recorded
Planning authority
London Borough of Southwark
Planning authority code
E09000028

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Householder
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
68 m²
Number of residences
Not recorded
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
6 February 2026
Valid date
6 February 2026
Start date
12 February 2026
Planning authority decision date
30 December 2025
Appeal decision date
13 March 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office
Dataset status
Current release
Catalogue record ID
85893
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21