Appeal 6004719
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
construction of a single-storey rear extension (retrospective), including the installation of a patio door to the extension (proposed).
Section 02
Decision
The appeal is dismissed.
Section 03
[name]
I note that part of the development has already been carried out. The extension has been constructed but the patio door has not been installed. For the avoidance of doubt, I have determined the appeal based on the submitted plans.
Section 04
[name]
The main issues in this appeal are: • whether the proposal provides acceptable living conditions for existing and future occupiers, with particular regard to the provision of amenity space; and • whether the development exposes existing and neighbouring occupiers to an unacceptable fire safety risk.
Section 05
Living conditions
The appeal site comprises a mid-terraced house in a residential street. There is a small hardstanding area in front of the dwelling. The properties in the terrace have small rear gardens and the site forms part of an approved development1 where permitted development rights for rear extensions and structures were restricted. The proposal is for a single storey rear extension.
The Council’s Householder Development Supplementary Planning Document 2025 includes guidance on rear extensions, stating that they must not take up more than 50% of the total rear garden space. 1 Planning permission ref 95/AP/0592
The Council indicates that the rear garden was originally around 22sqm. The parties dispute the amount of rear outdoor space that remains following construction of the extension, with the Council indicating this to be around 7.75sqm and the appellant stating that it is around 8.3sqm. Whichever figure is used, the extension occupies considerably more than 50% of the rear garden.
The rear garden space was modest to begin with, and only a relatively narrow strip sandwiched between boundary walls and fences now remains. Its small size makes this outdoor area inadequate for a family dwelling. As such, the proposed extension has resulted in an unacceptable loss of outdoor amenity space for existing and future occupiers of the house.
It is indicated that the extension only occupies around 37% of the original front and rear outside spaces. However, the front hardsurfaced area is open to the street, providing pedestrian and vehicular access to the property. As such, it does not function as private, usable outdoor space and does not replace the need to retain an adequately sized rear garden.
Therefore, I conclude that the proposal provides unacceptable living conditions for existing and future occupiers, with particular regard to the provision of amenity space. This is contrary to Policy D6 of the London Plan 2021 (London Plan) and Policies P15 and P56 of the Southwark Plan 2022. Together, these require development to provide high quality accommodation which does not cause an unacceptable loss of amenity to present or future occupiers, including the provision of usable private amenity space.
Section 06
Fire safety
Fire safety compliance is covered by the Building Regulations. Nonetheless, to ensure that proposals meet the highest standards of fire safety, Policy D12 of the London Plan 2021 (London Plan) sets out various requirements in this regard. This includes ensuring that developments are constructed in an appropriate way to minimise the risk of fire spread.
The appellant’s [name] (FSS) sets out measures to address fire safety issues. It indicates that as the extension is a dining room, there are no cooking appliances, open flames or electric heating elements, and this was evident at my site visit. It also outlines that no additional fire-resistant separation is required as it is a single storey extension.
The FSS states that the proposed construction materials are appropriate given the use and height of the extension and the presence of fire detection and suppression measures. However, due to the timber construction with uPVC cladding and the location of the extension less than 1m from the neighbouring property, the Council raises concerns regarding the potential for external fire spread.
No building control certificate has been submitted, and the Council’s Building Control Manager advises that the combination of combustible materials and the proposed siting give rise to fire safety concerns. The extension has a ceiling mounted smoke alarm and portable fire extinguisher, and the FSS sets out means of escape and provision for emergency access in the event of a fire. Nevertheless, these measures do not address the fire risks associated with the construction materials nor demonstrate how fire spread between buildings is to be mitigated.
Consequently, I conclude that it has not been demonstrated that the development does not expose existing and neighbouring occupiers to an unacceptable fire safety risk. Therefore, the proposal conflicts with Policy D12 of the London Plan.
Section 07
Other Matters
The proposed scheme is intended to provide usable dining accommodation for family members in a multi-generational household, including those with mobility needs. Therefore, I have had regard to the Public Sector Equality Duty (PSED) contained in section 149 of the Equality Act 2010. The duty includes having regard to the need to eliminate discrimination, harassment and advance equality of opportunity between those sharing relevant protected characteristics and those who do not. [name] am mindful of the needs of the family members, it has not been demonstrated that the scale of the proposal is specific to their needs, or that they cannot be met by a less harmful scheme. Thus, the PSED considerations do not outweigh the harm that I have identified, and following careful consideration of these matters, I am satisfied that the impact of dismissing this appeal is proportionate and justified.
The appellant states that the proposed development improves thermal performance, but there is no substantive evidence to demonstrate that this is a benefit of the proposed scheme.
There is reference to the Council’s approval of a several other single storey domestic extensions in the vicinity where it did not find harm in terms of living conditions and fire safety. However, limited information on those proposals has been submitted so I am unable to compare them with the scheme before me.
The Council did not find harm or development plan conflict in relation to several other matters, including character and appearance, neighbouring living conditions and impacts on heritage assets. Nonetheless, even if I were to agree with the Council on these points, the absence of harm is a neutral matter which does not carry weight in favour of the scheme.
The appellant has expressed general dissatisfaction with the Council’s validation and communication on the application, but this is a matter between those parties and does not in this instance have any bearing on my determination of this appeal.
Section 08
Conclusion
For the reasons given above, the proposal conflicts with the development plan and the material considerations do not indicate that the appeal should be decided other than in accordance with it. The appeal is therefore dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 7963No official casework-database value to compare
- Extracted decision date · page 1
- 13 March 2026Matches the official casework database
- Extracted site visit dates
- 9 March 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6004719
- Application reference
- 25/AP/2410
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Southwark
- Planning authority code
- E09000028
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Householder
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 68 m²
- Number of residences
- Not recorded
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 6 February 2026
- Valid date
- 6 February 2026
- Start date
- 12 February 2026
- Planning authority decision date
- 30 December 2025
- Appeal decision date
- 13 March 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office
- Dataset status
- Current release
- Catalogue record ID
- 85893
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21