Appeal 6004830
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
conversion of a single dwelling house into two self-contained houses (1 × 4-bed, 1 × 3-bed), involving a two-storey side extension, with vehicular access, associated hardstanding for parking, and provision for bicycle and refuse storage.
Section 02
Decision
The appeal is dismissed.
Section 03
Main Issue
The main issue is whether the proposed development would have an acceptable effect on the character and appearance of the area.
Section 04
Reasons
The appeal site is a semi-detached dwelling within a cul-de-sac characterised by a limited number of dwellings arranged in a simple and legible layout. The built form predominantly comprises two pairs of semi-detached dwellings, together with a detached dwelling at the head of the cul-de-sac. Notwithstanding some variation in detailing, these properties exhibit a consistent pattern of development, with semi-detached pairs displaying a clear symmetry in their original two-storey form, contributing to a cohesive and balanced streetscape.
The character of the cul-de-sac is also influenced by its spacious and verdant qualities, derived from the gaps between buildings and the presence of trees and vegetation. This is particularly evident towards the southern end, where larger gaps allow for soft landscaping and a greater sense of openness. These features contribute positively to the setting.
The proposed development would introduce an additional two-storey dwelling within the side garden of the host property, together with extensions to the existing dwelling, resulting in a marked increase in built form along this part of the cul-de-sac. The existing gap to the side of the dwelling makes a meaningful contribution to the sense of openness and spacing between buildings. The proposed 2-storey form, encompassing both the new dwelling and the extension, would be substantially wider than the existing dwelling and would largely erode this gap, diminishing the spacious character of the area.
As a result, the combined development would read as a broader and more continuous block of built form, rather than as a subordinate addition. This would be especially apparent in views along the cul-de-sac, where the short and enclosed nature of the street would make the increased width and massing readily perceptible. In this context, the development would appear as a prominent and visually dominant feature, at odds with the prevailing restrained pattern of development.
The development would incorporate design measures including a slightly reduced ridge height and a set-back front elevation. Whilst these measures would provide some degree of visual articulation, when viewed as a whole they would not sufficiently offset the fundamental issue arising from the overall width and combined massing of the development. Consequently, the proposal would introduce a form and scale of development that would not reflect the established character of the street.
For these reasons, I conclude that the proposed development, by virtue of its width and overall massing, would appear overly dominant and intrusive, resulting in harm to the character and appearance of the area. Accordingly, it would conflict with Policies D3 and D4 of the London Plan March 2021, Policy CP30 of The Enfield Plan Core Strategy 2010-2025, and Policies DMD6, DMD8, DMD14 and DMD37 of the Development Management Document (DMD) [name]
Collectively, these policies seek to ensure that development is high quality, design-led, responds appropriately to its context and respects local character. It would also conflict with the relevant provisions of the National Planning Policy Framework (the Framework), which have similar aims.
Section 05
Planning Balance
Paragraph 11 of the Framework outlines the presumption in favour of sustainable development. For decision-taking, paragraph 11.d) provides that where the most important policies for determining the application are out-of-date, permission should be granted unless the adverse impacts would significantly and demonstrably outweigh the benefits when assessed against the policies in the Framework taken as a whole.
The Council’s officer report acknowledges that it has not met the requirements of the [name], with the consequence that the presumption in favour of sustainable development is engaged. In these circumstances, footnote 8 of the Framework notes that the policies most important for determining the appeal should be treated as out-of-date. However, this does not mean that those policies should be afforded no weight. Rather, the weight to be afforded depends on their consistency with the Framework.
In this regard, my findings on the main issue identify clear conflict with development plan policies that seek to ensure that development is high quality, design-led, responds appropriately to its context and respects local character. These objectives are consistent with the Framework, which emphasises the importance of achieving well-designed places and recognises good design as a key aspect of sustainable development. Accordingly, notwithstanding the paragraph 11.d) balance, I give these policies significant weight.
Turning to the benefits of the proposal, the development would result in the provision of one additional dwelling. The Framework places significant weight on supporting the Government’s objective of significantly boosting the supply of homes. The proposal would also make efficient use of land within an established and sustainable residential location. These are matters that weigh in favour of the scheme.
However, the extent of this benefit is limited by the fact that the proposal would deliver only a single additional unit. Whilst this would be a positive contribution, it would make only a modest addition to the Borough’s housing supply and would not, in itself, materially alter the Council’s housing delivery position.
I note that the Council has identified no harm in terms of living conditions, highway safety, or internal accommodation standards. Whilst this is acknowledged, the absence of harm in these respects amounts to a neutral consideration rather than a benefit, as all developments are expected to meet such baseline requirements as a minimum.
Set against the identified benefits, I have found harm to the character and appearance of the area, which would conflict with development plan policies that are consistent with the Framework. I therefore conclude that the adverse impacts of the proposal would significantly and demonstrably outweigh its benefits when assessed against the policies of the Framework taken as a whole. Therefore, in this case, the proposal is not supported under the paragraph 11.d) balance.
Section 06
Conclusion
The proposed development would conflict with the development plan as a whole and there are no other considerations, including the provisions of the Framework, to indicate that a decision should be made other than in accordance with the plan. Therefore, for the reasons given, I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 4240No official casework-database value to compare
- Extracted decision date · page 1
- 26 May 2026Matches the official casework database
- Extracted site visit dates
- 30 April 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6004830
- Application reference
- 25/03124/FUL
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Enfield
- Planning authority code
- E09000010
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Other Major Developments
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Planning Appeals - Full
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 111 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- No
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 9 February 2026
- Valid date
- 9 February 2026
- Start date
- 17 February 2026
- Planning authority decision date
- 17 December 2025
- Appeal decision date
- 26 May 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office-s78
- Dataset status
- Current release
- Catalogue record ID
- 89333
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 20 August 2026 at 16:29