Appeal 6004939

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as the installation of 3 no. antennas and 1 no. GPS node located on existing support poles on the rooftop, and ancillary development thereto.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for the installation of 3 no. antennas and 1 no. GPS node located on existing support poles and ancillary development, on the [site address] in accordance with the terms of the application, Ref 25/12180/F, subject to the following conditions:

    The development hereby permitted shall begin not later than three years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with drawing nos: 799746_BRC039_68643_BS0195_M005 Issue B3 - 002 Site Location Plan; 799746_BRC039_68643_BS0195_M005 Issue B3 - 150 Proposed Site Plan; and 799746_BRC039_68643_BS0195_M005 Issue B3 - 250 Proposed Site elevations A.

  2. Section 03

    Main Issue

    The main issue is the effect of the proposed development on the character and appearance of the host building and the City Dock Conservation Area.

  3. Section 04

    Host building

    The host building is a 2-storey commercial building which, although its footprint is irregular, has a linear form. The roof is flat, but towards the side of the building which faces the [address] / [address] junction there is a rectangular plant room with a brick chimney like structure protruding from the top. The plant room is already used to support a collection of aerials including a tall pole aerial, as well as a series of support poles which are currently not in use. Although clearly functional in form it has some design merit including a double height clock tower.

    From the plans, the proposal would take the form of 3 solid box like structures located on 3 of the existing unused support poles, and associated works to link them into the existing equipment cabinet. No part of the proposal would extend beyond the hight of the chimney structure on top of the plant room.

    The proposal would be clearly visible from the vicinity of the host building, and it would physically increase the amount of telecommunication paraphernalia on the roof. However, it would be clustered around the functional plant room structure away from the clock tower and read in conjunction with the existing aerials. This would constitute change but, in my mind, would not be of such a quantum as to overwhelm the impact of the clock tower, or obscure the linear form of the host building or its clearly functional and commercial appearance.

    Consequently, the proposal would not cause harm to the character and appearance of the host building. It, therefore, complies with [name] BCS21 and Bristol Local Plan: Bristol Central Area Plan Policy BCAP41 insofar as they see high quality development to positively contribute to character and appearance, and Bristol Local Plan: Site Allocations and Development Management Policies (SADM) Policy DM36 insofar as it requires new or upgraded telecommunications equipment and installations to respect character and appearance.

  4. Section 05

    City Dock Conservation Area (CA)

    As the appeal site is within the CA special regard to section 72(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990 (as amended) (the Act) will be had.

    The CA’s significance is related to the [name], and the historic dock uses linked to it. The host building along with the surrounding similarly scaled commercial buildings forms the backdrop of [name] with the [address] passing next to it. This area of the CA has a very utilitarian appearance, and the host building is considered a character building within that. This is because it helps to inform the changing face of development along the [name], particularly of the smaller scale commercial uses which sprang up as the docks began to fall out of use. It therefore helps to inform both the character and appearance of this part of the CA.

    There are views of the host building across the [name], but these are limited to the clock tower and existing pole aerial above the chimney structure on the plant room. Accordingly, due to the proposal not extending above that chimney structure it is unlikely it would be visible in these longer distance views.

    Although the host building is obvious along the [address] and relatively instructive in the significance of this part of the CA, it is functional in form, and part of the functionality relates to the existing aerials. As identified in the first main issue, the proposal is not considered to be a magnitude of change to cause harm to the host building.

    Therefore, as the character and appearance of the host building will not be affected, it is found that the impact on the character and appearance of the CA would be neutral, thus ensuring no harm to its significance as a heritage asset. The proposal would therefore comply with the Act and [name] BCS22 as far as it seeks to safeguard heritage assets.

  5. Section 06

    Other Matters

    It is recognised the proposal would represent an upgrade of the existing telecommunication system, a position supported by the National Planning Policy Framework (the Framework). That alternative sites were considered within the area, that the proposal represents an opportunity to share the site with other providers, and that it conforms to the International Commission on [name] guidelines, means the proposal also complies with the other parts of SADM Policy DM36.

  6. Section 07

    Conditions

    In addition to the standard time limit condition, I have imposed a condition requiring the development to be carried out in accordance with the approved plans as this provides certainty. I have not found it necessary to impose any further conditions, and the main parties have not suggested any.

  7. Section 08

    Conclusion

    For the reasons given above the appeal scheme would comply with the development plan when read as a whole and there are no sufficiently weighted material considerations, including the Framework, which would indicate a decision otherwise. The appeal is, therefore, allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 2199No official casework-database value to compare
    Extracted decision date · page 1
    3 June 2026Matches the official casework database
    Extracted site visit dates
    12 May 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6004939
Application reference
25/12180/F
Lead case reference
Not recorded
Planning authority
Bristol City Council
Planning authority code
E06000023

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Other minor developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Planning Appeals - Full
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
1,000 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
10 February 2026
Valid date
10 February 2026
Start date
27 February 2026
Planning authority decision date
11 September 2025
Appeal decision date
3 June 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
89773
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29