Appeal 6005198

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

11 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

hybrid application seeking outline planning permission for the erection of 19 dwellings with all matters reserved except for means of access and detailed permission for the conversion of a barn into a dwelling.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Applications for costs

    An application for costs was made by [name] against Stafford Borough Council. This application is the subject of a separate decision.

  3. Section 04

    Preliminary Matters

    During the Council’s determination of the application the appellant submitted, amongst other things, a revised illustrative layout plan, which reduced the number of dwellings being sought under the outline element of the application from 19 to

    It also included a pedestrian link to [address] and a [name] (BNG) mitigation/planning area as well as a footpath along the internal access road. I understand that the Council did not accept this amendment and the application was determined as originally submitted.

    It has been requested that I consider the revised scheme as part of my determination of this appeal. However, it includes a substantial and fundamental change to the application that was considered by the Council. Considering the revised scheme would cause procedural unfairness to interested parties and deprive those entitled to be consulted on an application the opportunity to make representation. As such, my decision is based on the proposed development considered by the Council when the application was determined. This includes the illustrative layout plan showing 19 dwellings covered by the outline element of the application, and I have taken this plan into account for indicative purposes only.

  4. Section 05

    [name]

    The main issues are the effect of the proposed development on:  the character and appearance of the area, including upon green infrastructure;  highway safety, with particular regard to footway provision along the south side of [address] and the access arrangement on [address]; and  whether the proposal would make adequate provision for BNG.

  5. Section 06

    Character and appearance

    There is no dispute between the parties that the site is designated as green infrastructure in The Plan for Stafford Borough 2011-2031 (PSB) and within the settlement boundary of Gnosall. The site is located between [address] and [address], to the rear of traditional cottages, a modern residential development, a community fire station and a hot food takeaway that are positioned towards the junction of these roads. Ground levels rise along its southwestern and northwestern boundaries as well as its northern boundary, where it backs onto existing housing and shares a boundary with [address] respectively.

    The application form states that the site’s existing use is grazing land and whilst there was no livestock present at the time of my visit, the condition of the grass with the greater variety of vegetation to much of the site’s boundaries gave it a very pleasant rural agricultural landscape. This is also complemented by the low traditional stone wall along [address]. Moreover, due to the open nature of the site’s boundary to [address] and at the existing access off [address], it is seen as an open field within a sunken bowl, adding to its landscape quality. Whilst not accessible to the public, the site meets the National Planning Policy Framework’s (the Framework) definition of green infrastructure.

    Except for an area containing an attenuation pond adjacent to the site’s boundary with The Rank and a narrow strip of land, containing a seating and play area, next to the existing barn on the site, the illustrative layout plan shows the vast majority of all other undeveloped land within the curtilage of the proposed dwellings. This would result in the loss of the site’s existing open countryside character and appearance, which I found to be a rural oasis surrounded by built development and a positive contribution to the locality’s sense of place. The urbanising impact of the proposed development would be highly visible from public vantage points as well as surrounding properties. Moreover, due to the site’s positioning within the built-up area of Gnosall, its contribution on the character and appearance of the area is unique to this setting.

    Although matters including landscaping and layout are reserved, on the basis of the evidence before me and from my observations, I am not satisfied that the quantum of development being sought could be delivered on the site in a manner that would be landscape led, which would respect the site’s natural features and the wide range of benefits it currently delivers.

    For the above, reasons, the proposed development would cause significant harm to the character and appearance of the area, including upon green infrastructure. This would conflict with PSB Policy N1, which includes the need for high design standards that take into account the local character, context, density and landscape. Moreover, it would be contrary to PSB Policy N4, which seeks to protect, enhance and expand the Borough’s defined green infrastructure by requiring, amongst other things, new developments to be set within a well-designed and maintained green setting and provide a variety of spaces to meet the needs of people and nature.

  6. Section 07

    Highway safety

    The Highways Report accompanying the proposals identifies that the frontage accesses to serve the [address] would not be able to achieve the required visibility splays looking to the left out of each access. Research carried out for ‘Manual for Streets 2’, which found no evidence that a failure to provide visibility in accordance with values recommended in Manual for Streets or the [name] for Roads and Bridges actually resulted in an increased risk of injury collisions, is not before me. Moreover, assertions that there are a number of accesses on [address] with restricted visibility splays have not been substantiated. In light of this and the absence of data to demonstrate that the speed of vehicles on [address] is below the 30mph speed limit, I cannot conclude with reasonable certainty that the visibility splays to the new accesses off [address] would not lead to unacceptable harm to highway safety.

    To the west of the site’s existing access off [address], which would be utilised by the proposed development, is a narrow footway. Although it is not suitable to all users, there is an alternative wider footway to the opposite side of [address]. Moreover, the footway is wider to the east of the access that leads towards a range of services and facilities as well as bus stops.

    The provision of footways of suitable width on both sides of [address] is clearly desirable, and the appellant has also suggested a pedestrian crossing could be secured via a condition. Due to the alternative footway provision within the immediate vicinity of the [address] access, I am satisfied that in this case it would not result in an increase in potential conflicts between pedestrians and vehicles to the detriment of highway safety.

    In conclusion I have found that the existing narrow footpath to the west of the [address] access would not unduly restrict safe and suitable access to the site for all users. This accords with PSB Policy T1 that includes the need to encourage walking and cycling through links to existing routes. However, I have identified harm to highway safety as a result of inadequate visibility splays from the new accesses off [address]. Accordingly, I conclude that the proposed development would have an unacceptable effect on highway safety, with particular regard to the access arrangement on [address]. This conflicts with PSB Policy T2, which requires, amongst other things, all new developments to have safe and adequate means of access and not materially impair highway safety.

  7. Section 08

    BNG

    Schedule 7A of the Act introduced a statutory framework for BNG and, with some exceptions, every grant of planning permission is deemed to have been granted subject to the [name] (BGC). This requires that at least a 10% increase in biodiversity value is met. It follows that the proposal is subject to the general BGC, as set out in the Act.

    The submitted [name] and [name] state that the proposal would result in the loss of 3.79 habitat units, which represents a 70.03% negative change. Concluding that it would not be possible to compensate for the loss of habitat within the application site, the statement highlights that at least 4.34 habitat units and 0.01 hedgerow units would be required. In this case it is indicated that this would be achieved off-site and it would also need to meet the metric trading rules. This would be secured by the BGC.

    I am mindful that the Planning Practice Guidance (PPG) states that it would generally be inappropriate for decision makers, when determining a planning application for a development subject to BNG, to refuse an application on the grounds that the BNG objective will not be met. However, the PPG continues that decision makers may need to consider more broadly whether the BNG condition is capable of being successfully discharged, with matters for consideration including the appropriate balance expected between on-site gains, off-site gains and the use of statutory biodiversity credits for the development, taking account of the [name].

    I appreciate the Council’s concerns that there is limited information on how the BNG requirement would be achieved. Nevertheless, there is no compelling evidence before me that the 10% increase in biodiversity value could not be delivered off-site. This would be a statutory requirement for later consideration should permission be granted.

    To conclude, sufficient information has been provided at this stage that the proposal would make adequate provision for BNG.

  8. Section 09

    Other Matters

    The appeal site falls within the Zone of Influence for the Cannock Chase Special Area of Conservation (SAC), which is a European Site as defined in the Conservation of Habitats and Species Regulations 2017 (as amended). A ‘Statement of Willingness’ has been submitted in relation to the provision of a final contribution to mitigate the likely negative impacts to the SAC, though there is no mechanism to secure the contribution before me.

    Whilst details have not been provided by the Council on the European Site, based on my knowledge of the SAC, this approach accords with the mitigation developed for the SAC, and Natural England has raised no objection. Nevertheless, as I have found the appeal scheme would be unacceptable for other reasons, it is not necessary for me to consider whether there would be any likely significant effects on the integrity of the SAC or undertake an Appropriate Assessment.

    A lack of harm or policy compliance in respect of protected species, flood risk, heritage assets and private amenity space would have a neutral effect, which weigh neither for nor against the proposal.

  9. Section 10

    Planning Balance

    The Framework states that due weight should be given to relevant policies in existing plans according to their degree of consistency with the Framework. I give significant weight to the conflicts with [name] N1, N4 and T2, which are consistent with the Framework in ensuring that development is sympathetic to local character, incorporates green infrastructure, and has an acceptable impact on highway safety. As a result, I find that there is conflict with the development plan as a whole.

    There is no dispute that the Council currently does not have a 5-year supply of deliverable housing sites, and a figure of 3.37 years has been given by both parties. Consequently, paragraph 11 d) of the Framework is applicable. Paragraph 11 d) ii) identifies that planning permission should be granted unless any adverse impact of doing so would significantly and demonstrably outweigh the benefits, when assessed against the policies in the Framework taken as a whole, having particular regard to certain key policies including well-designed places and providing affordable homes.

    The proposed development would make a positive contribution in the delivery of 19 new build dwellings and a further dwelling in the form of a conversion, that would represent the efficient use of land within Gnosall with access to services and facilities. On this basis, the provision of housing attracts considerable weight in favour of the appeal scheme.

    There would also be associated social and economic benefits during the period of construction and once the dwellings are occupied, as well as the delivery of BNG. Given the scale of the proposed development, these benefits carry modest weight in support of the scheme

    In the absence of a legal agreement to secure the delivery of affordable housing, as well as financial contributions towards education and open space provision, I afford this limited weight.

    I have considered paragraph 73 of the Framework. Nevertheless, not all proposals within existing settlements will be acceptable.

    On the other side of the balance, there would be significant harm to the character and appearance of the area, including upon green infrastructure, and an unacceptable effect on highway safety, which would be contrary to paragraphs 116 and 135 of the Framework. Given the long-lasting effects on the character and appearance of the area and highway safety, I attribute significant weight to this conflict.

    Accordingly, having carefully considered the balance of factors, the adverse impacts of the proposal would significantly and demonstrably outweigh the benefits when assessed against the policies in the Framework taken as a whole. As such the presumption in favour of sustainable development set out in paragraph 11 d) of the Framework does not apply.

  10. Section 11

    Conclusion

    The proposal conflicts with the development plan as a whole and the material considerations, including the Framework, do not indicate that the appeal should be decided other than in accordance with it. Therefore, the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 4578No official casework-database value to compare
    Extracted decision date · page 1
    2 June 2026Matches the official casework database
    Extracted site visit dates
    27 May 2026 (page 1)
  • Costs Decision

    Extracted inspector · page 1
    Inspector attribution ID 4578No official casework-database value to compare
    Extracted decision date · page 1
    2 June 2026Matches the official casework database
    Extracted site visit dates
    27 May 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6005198
Application reference
24/40076/FUL
Lead case reference
Not recorded
Planning authority
Stafford Borough Council
Planning authority code
E07000197

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Major dwellings
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Planning Appeals - Outline
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
11,000 m²
Number of residences
19
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
17 February 2026
Valid date
23 February 2026
Start date
23 February 2026
Planning authority decision date
20 November 2025
Appeal decision date
2 June 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Yes
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
89703
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29