Appeal 6005198
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
11 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
hybrid application seeking outline planning permission for the erection of 19 dwellings with all matters reserved except for means of access and detailed permission for the conversion of a barn into a dwelling.
Section 02
Decision
The appeal is dismissed.
Section 03
Applications for costs
An application for costs was made by [name] against Stafford Borough Council. This application is the subject of a separate decision.
Section 04
Preliminary Matters
During the Council’s determination of the application the appellant submitted, amongst other things, a revised illustrative layout plan, which reduced the number of dwellings being sought under the outline element of the application from 19 to
It also included a pedestrian link to [address] and a [name] (BNG) mitigation/planning area as well as a footpath along the internal access road. I understand that the Council did not accept this amendment and the application was determined as originally submitted.
It has been requested that I consider the revised scheme as part of my determination of this appeal. However, it includes a substantial and fundamental change to the application that was considered by the Council. Considering the revised scheme would cause procedural unfairness to interested parties and deprive those entitled to be consulted on an application the opportunity to make representation. As such, my decision is based on the proposed development considered by the Council when the application was determined. This includes the illustrative layout plan showing 19 dwellings covered by the outline element of the application, and I have taken this plan into account for indicative purposes only.
Section 05
[name]
The main issues are the effect of the proposed development on: the character and appearance of the area, including upon green infrastructure; highway safety, with particular regard to footway provision along the south side of [address] and the access arrangement on [address]; and whether the proposal would make adequate provision for BNG.
Section 06
Character and appearance
There is no dispute between the parties that the site is designated as green infrastructure in The Plan for Stafford Borough 2011-2031 (PSB) and within the settlement boundary of Gnosall. The site is located between [address] and [address], to the rear of traditional cottages, a modern residential development, a community fire station and a hot food takeaway that are positioned towards the junction of these roads. Ground levels rise along its southwestern and northwestern boundaries as well as its northern boundary, where it backs onto existing housing and shares a boundary with [address] respectively.
The application form states that the site’s existing use is grazing land and whilst there was no livestock present at the time of my visit, the condition of the grass with the greater variety of vegetation to much of the site’s boundaries gave it a very pleasant rural agricultural landscape. This is also complemented by the low traditional stone wall along [address]. Moreover, due to the open nature of the site’s boundary to [address] and at the existing access off [address], it is seen as an open field within a sunken bowl, adding to its landscape quality. Whilst not accessible to the public, the site meets the National Planning Policy Framework’s (the Framework) definition of green infrastructure.
Except for an area containing an attenuation pond adjacent to the site’s boundary with The Rank and a narrow strip of land, containing a seating and play area, next to the existing barn on the site, the illustrative layout plan shows the vast majority of all other undeveloped land within the curtilage of the proposed dwellings. This would result in the loss of the site’s existing open countryside character and appearance, which I found to be a rural oasis surrounded by built development and a positive contribution to the locality’s sense of place. The urbanising impact of the proposed development would be highly visible from public vantage points as well as surrounding properties. Moreover, due to the site’s positioning within the built-up area of Gnosall, its contribution on the character and appearance of the area is unique to this setting.
Although matters including landscaping and layout are reserved, on the basis of the evidence before me and from my observations, I am not satisfied that the quantum of development being sought could be delivered on the site in a manner that would be landscape led, which would respect the site’s natural features and the wide range of benefits it currently delivers.
For the above, reasons, the proposed development would cause significant harm to the character and appearance of the area, including upon green infrastructure. This would conflict with PSB Policy N1, which includes the need for high design standards that take into account the local character, context, density and landscape. Moreover, it would be contrary to PSB Policy N4, which seeks to protect, enhance and expand the Borough’s defined green infrastructure by requiring, amongst other things, new developments to be set within a well-designed and maintained green setting and provide a variety of spaces to meet the needs of people and nature.
Section 07
Highway safety
The Highways Report accompanying the proposals identifies that the frontage accesses to serve the [address] would not be able to achieve the required visibility splays looking to the left out of each access. Research carried out for ‘Manual for Streets 2’, which found no evidence that a failure to provide visibility in accordance with values recommended in Manual for Streets or the [name] for Roads and Bridges actually resulted in an increased risk of injury collisions, is not before me. Moreover, assertions that there are a number of accesses on [address] with restricted visibility splays have not been substantiated. In light of this and the absence of data to demonstrate that the speed of vehicles on [address] is below the 30mph speed limit, I cannot conclude with reasonable certainty that the visibility splays to the new accesses off [address] would not lead to unacceptable harm to highway safety.
To the west of the site’s existing access off [address], which would be utilised by the proposed development, is a narrow footway. Although it is not suitable to all users, there is an alternative wider footway to the opposite side of [address]. Moreover, the footway is wider to the east of the access that leads towards a range of services and facilities as well as bus stops.
The provision of footways of suitable width on both sides of [address] is clearly desirable, and the appellant has also suggested a pedestrian crossing could be secured via a condition. Due to the alternative footway provision within the immediate vicinity of the [address] access, I am satisfied that in this case it would not result in an increase in potential conflicts between pedestrians and vehicles to the detriment of highway safety.
In conclusion I have found that the existing narrow footpath to the west of the [address] access would not unduly restrict safe and suitable access to the site for all users. This accords with PSB Policy T1 that includes the need to encourage walking and cycling through links to existing routes. However, I have identified harm to highway safety as a result of inadequate visibility splays from the new accesses off [address]. Accordingly, I conclude that the proposed development would have an unacceptable effect on highway safety, with particular regard to the access arrangement on [address]. This conflicts with PSB Policy T2, which requires, amongst other things, all new developments to have safe and adequate means of access and not materially impair highway safety.
Section 08
BNG
Schedule 7A of the Act introduced a statutory framework for BNG and, with some exceptions, every grant of planning permission is deemed to have been granted subject to the [name] (BGC). This requires that at least a 10% increase in biodiversity value is met. It follows that the proposal is subject to the general BGC, as set out in the Act.
The submitted [name] and [name] state that the proposal would result in the loss of 3.79 habitat units, which represents a 70.03% negative change. Concluding that it would not be possible to compensate for the loss of habitat within the application site, the statement highlights that at least 4.34 habitat units and 0.01 hedgerow units would be required. In this case it is indicated that this would be achieved off-site and it would also need to meet the metric trading rules. This would be secured by the BGC.
I am mindful that the Planning Practice Guidance (PPG) states that it would generally be inappropriate for decision makers, when determining a planning application for a development subject to BNG, to refuse an application on the grounds that the BNG objective will not be met. However, the PPG continues that decision makers may need to consider more broadly whether the BNG condition is capable of being successfully discharged, with matters for consideration including the appropriate balance expected between on-site gains, off-site gains and the use of statutory biodiversity credits for the development, taking account of the [name].
I appreciate the Council’s concerns that there is limited information on how the BNG requirement would be achieved. Nevertheless, there is no compelling evidence before me that the 10% increase in biodiversity value could not be delivered off-site. This would be a statutory requirement for later consideration should permission be granted.
To conclude, sufficient information has been provided at this stage that the proposal would make adequate provision for BNG.
Section 09
Other Matters
The appeal site falls within the Zone of Influence for the Cannock Chase Special Area of Conservation (SAC), which is a European Site as defined in the Conservation of Habitats and Species Regulations 2017 (as amended). A ‘Statement of Willingness’ has been submitted in relation to the provision of a final contribution to mitigate the likely negative impacts to the SAC, though there is no mechanism to secure the contribution before me.
Whilst details have not been provided by the Council on the European Site, based on my knowledge of the SAC, this approach accords with the mitigation developed for the SAC, and Natural England has raised no objection. Nevertheless, as I have found the appeal scheme would be unacceptable for other reasons, it is not necessary for me to consider whether there would be any likely significant effects on the integrity of the SAC or undertake an Appropriate Assessment.
A lack of harm or policy compliance in respect of protected species, flood risk, heritage assets and private amenity space would have a neutral effect, which weigh neither for nor against the proposal.
Section 10
Planning Balance
The Framework states that due weight should be given to relevant policies in existing plans according to their degree of consistency with the Framework. I give significant weight to the conflicts with [name] N1, N4 and T2, which are consistent with the Framework in ensuring that development is sympathetic to local character, incorporates green infrastructure, and has an acceptable impact on highway safety. As a result, I find that there is conflict with the development plan as a whole.
There is no dispute that the Council currently does not have a 5-year supply of deliverable housing sites, and a figure of 3.37 years has been given by both parties. Consequently, paragraph 11 d) of the Framework is applicable. Paragraph 11 d) ii) identifies that planning permission should be granted unless any adverse impact of doing so would significantly and demonstrably outweigh the benefits, when assessed against the policies in the Framework taken as a whole, having particular regard to certain key policies including well-designed places and providing affordable homes.
The proposed development would make a positive contribution in the delivery of 19 new build dwellings and a further dwelling in the form of a conversion, that would represent the efficient use of land within Gnosall with access to services and facilities. On this basis, the provision of housing attracts considerable weight in favour of the appeal scheme.
There would also be associated social and economic benefits during the period of construction and once the dwellings are occupied, as well as the delivery of BNG. Given the scale of the proposed development, these benefits carry modest weight in support of the scheme
In the absence of a legal agreement to secure the delivery of affordable housing, as well as financial contributions towards education and open space provision, I afford this limited weight.
I have considered paragraph 73 of the Framework. Nevertheless, not all proposals within existing settlements will be acceptable.
On the other side of the balance, there would be significant harm to the character and appearance of the area, including upon green infrastructure, and an unacceptable effect on highway safety, which would be contrary to paragraphs 116 and 135 of the Framework. Given the long-lasting effects on the character and appearance of the area and highway safety, I attribute significant weight to this conflict.
Accordingly, having carefully considered the balance of factors, the adverse impacts of the proposal would significantly and demonstrably outweigh the benefits when assessed against the policies in the Framework taken as a whole. As such the presumption in favour of sustainable development set out in paragraph 11 d) of the Framework does not apply.
Section 11
Conclusion
The proposal conflicts with the development plan as a whole and the material considerations, including the Framework, do not indicate that the appeal should be decided other than in accordance with it. Therefore, the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 4578No official casework-database value to compare
- Extracted decision date · page 1
- 2 June 2026Matches the official casework database
- Extracted site visit dates
- 27 May 2026 (page 1)
Costs Decision
- Extracted inspector · page 1
- Inspector attribution ID 4578No official casework-database value to compare
- Extracted decision date · page 1
- 2 June 2026Matches the official casework database
- Extracted site visit dates
- 27 May 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6005198
- Application reference
- 24/40076/FUL
- Lead case reference
- Not recorded
- Planning authority
- Stafford Borough Council
- Planning authority code
- E07000197
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Major dwellings
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Planning Appeals - Outline
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 11,000 m²
- Number of residences
- 19
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- No
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 17 February 2026
- Valid date
- 23 February 2026
- Start date
- 23 February 2026
- Planning authority decision date
- 20 November 2025
- Appeal decision date
- 2 June 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Yes
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office-s78
- Dataset status
- Current release
- Catalogue record ID
- 89703
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 20 August 2026 at 16:29