Appeal 6005268
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
11 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
for the demolition of the building and the use of land as a surface car park (23 spaces) for a period of two years.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
The evidence suggests that the appeal has been made retrospectively. During my site visit, it was confirmed that the development under consideration appeared to be in general accordance with the plans submitted. I have therefore considered the appeal on a retrospective basis.
The appeal site is located within the [address] Conservation Area. Section 72(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990 requires special attention to be paid to preserving or enhancing the character or appearance of conservation areas. It is also located within the setting of the Grade II Listed No. [address]. Section 66 of the Planning (Listed Buildings and Conservation Areas) Act 1990 notes that in considering whether to grant planning permission, for development which affects a listed building or its setting, special regard shall be had to the desirability of preserving the building or its setting. I have had due regard to these duties within my decision.
Section 04
[name]
The main issues are: • whether the development would prejudice the delivery of future development proposals within the appeal site; • the effect of the scheme upon the character or appearance of the [address] Conservation Area (CA) and the setting of the Grade II Listed No. [address]; • the effect of the scheme upon highway safety, congestion, accessible car parking, sustainable travel and climate change; and, • whether the surface water drainage of the development has been adequately addressed.
Section 05
Future Development
The appeal site previously accommodated a single-storey building that formed part of [address] Studios, together with a two-storey brick building used as a small youth training and counselling centre. Both structures have since been demolished. The evidence suggests that their removal formed part of an extant planning permission for the wider redevelopment of 33–[address].
Policy CC19 of the Liverpool Local Plan 2022 (LP) is concerned with vacant sites and temporary uses. It notes that proposals for temporary uses will be supported, provided that it does not prejudice any future development proposals. Policy STP2 of the LP seeks to ensure the sustainable growth of Liverpool. Critically for this appeal, it seeks for development to make an effective use of land.
Crucially, the application seeks permission for a temporary two-year period. I am mindful of the time typically required to bring forward a redevelopment scheme, from initial conception through to delivery. From my review of the planning history, it does not appear that a temporary permission has previously been granted for this site, and I am therefore not persuaded that the current proposal represents a continuation of an earlier temporary use that might otherwise inhibit redevelopment.
A temporary car park would make effective use of the land pending implementation of the extant permission for the wider redevelopment, rather than leaving the site vacant. It would provide a functional and active interim use, and, once redevelopment is ready to proceed or the temporary period expires, the car park could be readily removed to allow the approved works to take place.
In conclusion, given the time typically required to assemble the necessary components to bring forward a redevelopment scheme, I am not persuaded that the granting of a temporary permission would prejudice the future development of the site. Instead, it would ensure that the land is put to an effective interim use during this period. Accordingly, the proposal would not conflict with Policies CC19 and STP2 of the LP.
Section 06
Heritage
[address]: Proposal for Designation as a Conservation Area report identifies the defining characteristics of the CA. It notes that the area, extending from [address] through to [address], contains a notable concentration of surviving 18th, 19th and 20th century commercial and domestic buildings. The prominence of many of these buildings provides an indication of the wealth and social history of Liverpool up to the 19th century. The report also highlights the presence of several listed warehouse buildings, which collectively trace the evolution of warehousing within the city. Accordingly, the significance of the CA is derived from the historic character of its tightly packed built form and its contribution to understanding the city’s commercial development, wealth and social history.
No. [address] is a [name] listed warehouse building constructed in the late 18th century for [name], a prominent Liverpool merchant. It is five storeys high, built of brown brick with a Welsh slate roof, and retains an elegant architectural quality despite its functional origins and subsequent alterations. In this context, I find that the building’s setting, so far as it relates to this appeal, was historically defined by its position within a tightly packed streetscape of industrial buildings grouped closely together, a relationship that persisted until the demolition of the structures formerly occupying the appeal site.
The removal of the former buildings, and their replacement with an open car park and its associated apparatus, has eroded the previously tight streetscape along this part of [address]. The site now presents as a wide and conspicuously open gap, occupied by contemporary and utilitarian features such as a metal cabin, low‐level boundary fencing and parked vehicles. These elements create a sense of incompleteness and openness that is uncharacteristic of the wider CA and detracts from the historic, enclosed setting of the [name] listed No. [address].
Given the above, I conclude that the development fails to preserve the setting of the listed building and the character or appearance of the CA. It results in less than substantial harm to both the setting of No. [address] and the significance of the CA. The proposal therefore conflicts with Policy HD1 of the Local Plan, which seeks to ensure that development conserves Liverpool’s historic environment. Consequently, I afford this harm considerable importance and weight in the heritage balance, to which I return later in this decision.
Section 07
Highways
The appeal development provides a car park accommodating 23 spaces. It lies within a central area of Liverpool that benefits from access to a wide range of sustainable transport options. The Liverpool Parking Strategy 2025 seeks to prioritise sustainable modes of travel within the city centre and aims to reduce the overall level of parking provision within Liverpool.
The provision of additional car parking within the city centre is a key factor in encouraging increased vehicle movements into this highly accessible area. Inevitably, drawing more vehicles towards a single core destination would contribute to greater congestion, heighten the potential for highway‐safety conflicts, and reduce the proportion of trips made by sustainable modes. This, in turn, would lead to increased emissions as a result of the convenient pull of city‐centre parking. Whilst these are discussed in a general sense, such outcomes would run counter to the broad overarching aims of the direction of travel for transportation around Liverpool, as set out in the [name] 2025. This document seeks to prioritise sustainable transport and reduce reliance on private car use within the city centre.
The strategy does not aim to prevent car parking within Liverpool. Rather, it seeks to consolidate and relocate city‐centre parking so that land in the heart of the city is used more efficiently. Parking must be provided in appropriate locations and to a high standard. The Liverpool Parking Strategy 2025 assesses off‐street parking and identifies both positive and negative attributes. Many of the negative attributes apply directly to the appeal site, including its temporary nature, its position on prime city‐centre land, and its poor‐quality, surface‐level form. While the development would generally increase congestion, elevate the risk of highway‐safety conflicts, and reduce the share of trips made by sustainable modes in a broad sense, these impacts also reinforce its further inconsistency with the objectives of the [name] 2025. This would be the case whether the car park was permanent, or temporary, as proposed in this appeal.
It has been suggested that a condition could be imposed to restrict long-stay commuter use. However, I am not persuaded that such a condition would address the broader issue of the development attracting additional vehicle trips into the city centre. The associated impacts, namely increased congestion, pressure on highway safety and reduced uptake of sustainable transport modes, would arise irrespective of the duration of any stay. As such, a condition of this nature would not overcome the fundamental conflict identified.
Turning to the design of the car park itself, a plan was submitted at the application stage delineating the parking spaces within the appeal site. However, these spaces were not in place at the time of my site visit. Notwithstanding this, and having regard to the submitted plans, the two accessible parking spaces are positioned on either side of the site entrance. While the number of accessible spaces is adequate, neither space provides a full dedicated zone around it, that would allow a disabled driver or passenger to safely enter or exit a vehicle once parked. Consequently, the spaces would not be fully usable by individuals with disabilities who rely on appropriately designed parking facilities.
The appellant contends that this matter could be resolved through the imposition of a planning condition requiring the provision of appropriately designed and accessible parking spaces. However, I am required to determine the appeal based on the plans submitted. For the reasons set out above, the development does not incorporate a layout that would deliver any fully compliant accessible parking spaces.
To conclude, the proposed development would conflict with Policies CC19, UD4, TP1, TP5, TP6 and TP9 of the LP, as well as the guidance set out within the [name] 2025. Taken together, these policies and guidance require development to accord with the city centre parking strategy, to demonstrate inclusive design, and to support sustainable modes of transport, among other objectives. The proposal would therefore run counter to these aims of the LP.
Section 08
[name] and Drainage
Policy R3 of the LP notes that developers will be required to demonstrate through a Flood Risk Assessment (FRA), at the planning application stage, that development proposals will not increase flood risk on site or elsewhere. It further notes that development will be required to contribute to flood mitigation, compensation or protection measures where necessary, to manage flood risk caused by the development, amongst other things.
The appeal site is wholly covered by hardstanding. The application was submitted without an FRA or a drainage strategy. The appellant argues that this omission could be addressed through a planning condition requiring the submission of a surface‐water management plan prior to the commencement of use. However, Policy R3 of the LP is explicit that an FRA must be provided at the planning application stage. This requirement is fundamental to ensuring that development can properly assess and mitigate flood‐risk implications from the outset.
The appellant also refers to the suggested condition being a pre‐commencement condition. Yet during my site visit, the appeal site was clearly in active use as a car park. Several vehicles were present, and there was no barrier preventing access. In these circumstances, a pre‐commencement condition could not operate effectively, as the use has already commenced. Consequently, the absence of an FRA cannot be remedied through the mechanism proposed.
Therefore, the development conflicts with Policy R3 of the LP, the requirements relevant to this application have been previously explored, but also Policy R5 of the LP. Policy R5 requires development to not have an unacceptable adverse impact on drainage infrastructure and the water environment through additional surface water run-off, amongst other things. As the appeal is absent of an FRA, it fails to adequately address this matter.
Section 09
Heritage Balance
The harm to the CA and the setting of the [name] listed No. [address] would be less than substantial, at the lower end of that scale, as set out in the terms of the National Planning Policy Framework (the Framework). The Framework is clear that great weight should be afforded to the conservation of heritage assets. Paragraph 215 of the Framework requires that such harm be weighed against the public benefits of the proposal.
The appellant argues that the development delivers public benefits, including maintaining the site’s appearance, security, and economic use. However, as set out earlier in this decision, its appearance is a specific factor contributing to harm to the heritage assets within the locality. It is also claimed that the proposal would support nearby businesses and visitors. There is no evidential basis for this assertion. While any car-park use in such a central location will inevitably facilitate the movement of people into an area where expenditure occurs, the site’s highly accessible setting means I am not persuaded that visitors would refrain from spending money locally in the absence of this particular car park. Accordingly, these considerations attract only limited weight in the overall planning balance.
It is suggested that the presence of a car park avoids dereliction and anti-social behaviour. It is also contended that it would enable time for the preparation and delivery of a redevelopment scheme. I have acknowledged these matters earlier in my decision. I ascribe moderate weight to these considerations in this appeal.
In this case, the identified public benefits, taken together, do not outweigh the harm that would result to the character or appearance of the CA or the setting of the [name] listed No. [address]. In the absence of any significant public benefit, I conclude that, on balance, the proposal would fail to preserve or enhance the character or appearance of the CA and fails to preserve the setting of the listed building. Accordingly, the scheme conflicts with the approach to heritage assets set out in Section 16 of the Framework. As such, the Framework does not lend support to the proposal through the application of the public benefits to this heritage balance.
Furthermore, I consider that the proposal conflicts with the development plan taken as a whole. Material considerations do not outweigh the conflict with the development plan. A decision should therefore be taken in accordance with the
Section 10
Other Matters
The Council, through its officer report, identified the planning obligations it would have sought, including contributions towards tree planting and monitoring. The appellant argues that securing a tree‐planting contribution would be neither justified nor reasonable in the context of this proposal. This matter did not form part of the reasons for refusal. As the appeal is dismissed for other reasons, and as any conclusion on this point would not alter the overall outcome, I have not considered this matter further.
Section 11
Conclusion
For the reasons given above and in taking all of the material considerations of the proposal into account, the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 4No official casework-database value to compare
- Extracted decision date · page 1
- 10 June 2026Matches the official casework database
- Extracted site visit dates
- 2 June 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6005268
- Application reference
- 25F/0911
- Lead case reference
- Not recorded
- Planning authority
- Liverpool City Council
- Planning authority code
- E08000012
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Other minor developments
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Planning Appeals - Full
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 742 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- No
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 18 February 2026
- Valid date
- 18 February 2026
- Start date
- 25 February 2026
- Planning authority decision date
- 20 August 2025
- Appeal decision date
- 10 June 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office-s78
- Dataset status
- Current release
- Catalogue record ID
- 90174
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 20 August 2026 at 16:29