Appeal 6005277
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
installation of new [address] Hub and associated display of advertisement panels to both sides of the unit. Appeal B Ref: 6005277 [site address]
Section 02
Decisions
Appeal A is dismissed.
Appeal B is dismissed.
Section 03
Preliminary Matters
Appeal A concerns the refusal of planning permission for the installation of a [address] Hub. Appeal B concerns the refusal of express consent to display advertisements on the hub which is proposed under Appeal A. As they are intrinsically linked and raise similar issues, I have combined both decisions into a single decision letter.
Section 04
[name]
The main issues are: • the effect of the proposals upon visual amenity; and, • the effect of the proposals on highway safety.
Section 05
Visual amenity
The appeal proposal would be located on an area of the pavement outside of [address], next to [address]. The proposed unit would be of a considerable height, incorporating advertisement screens sited on each side of the street hub. Appeal Decisions 6005275 and 6005277 This immediate area has a very strong commercial character. Within both the immediate street scene and broader locality, it was evident during my site visit that this strong commercial character is further heightened through the presence of street furniture. This furniture consists of various elements of differing scales including lampposts, traffic lights, litter bins, post boxes, flower planters and road signage, amongst other things.
The proposed development would introduce an additional item of street furniture into a location where similar items are prevalent. Its siting, adjacent to the highway, would be reflective of the position of existing road signage and lampposts along [address] and [address]. These are the main thoroughfares in this locality. In this context, both the advertisement displays on the hub and the physical form of it would integrate comfortably within the mixed streetscape, where modern street furniture and various forms of advertising, including those which are illuminated, are established and visually prominent elements.
Based on the above considerations, I conclude that the proposed street hub and its associated advertisements would not appear incongruous or visually harmful within this predominantly commercial location. The development would therefore not conflict with Policies SD1, SD2 and SE1 of the Cheshire East Local Plan 2017 (LP), Policies GEN1, GEN 3 and RET9 of the Cheshire East Site Allocations and Development Policies Document 2022 (SADP) and Policy PR1 of the Wilmslow Neighbourhood Plan 2017. Collectively, these policies require development and advertisements within the public realm to be appropriate to the character and appearance of that area, ensuring that they achieve a sense of place that is of an appropriate quality, amongst other things.
I recognise that the aforementioned policies are not decisive with regards to Appeal B. The Town and Country Planning (Control of Advertisements) (England) Regulations 2007 (as amended) Regulations are clear that advertisements should be subject to control only in the interests of amenity and public safety, I have therefore taken them into account as material considerations only.
Section 06
Highway safety
The proposed plans demonstrate that the hub would be positioned with its elevation facing the highway, allowing strong visibility of its advertisement screens to face drivers travelling in either direction along [address]. It would also be close to the highway, at the junction with Green Lane. This would not only present the advertisements directly towards oncoming drivers, but would also create an opaque barrier close to the highway. It is also a location where due to the presence of surrounding buildings and busy close proximity junctions, attention is significantly demanded.
My attention is firstly drawn to vehicles travelling in an eastward direction towards the appeal site. The advertisement displays would be highly visible to these drivers on their approach to it. By their very nature, advertisements are intended to capture the attention of individuals. The appellant themselves notes that the PPG states that all advertisements are intended to attract attention. But, proposed advertisements at points where drivers need to take more care are more likely to affect public safety, at junctions, for example. In this instance, the proposed position of the hub and its advertisement display which would face drivers travelling eastwards would attract their attention. Appeal Decisions 6005275 and 6005277
This is also a location where vehicles may wish to turn left onto the junction with Green Lane. At this point, a pedestrian may be waiting to cross Green Lane, to continue their journey eastwards. It would not be unusual for a pedestrian to cross at this point, especially if their vehicle is parked on the small parking area on Green Lane, or if an individual wishes to walk further along [address].
The turn from [address] into Green Lane is off a busy stretch of the highway, where multiple junctions meet. This is also a location where there is not a significant amount of time to react. Therefore, any sudden stoppage due to unexpected pedestrians would have the potential to have implications upon highway safety through following vehicles being required to suddenly stop. When the attention-grabbing nature of the proposed advertisement displays, and the physical presence of the hub are collectively considered, this leads me to the conclusion that the proposals would distract drivers, but would also present a physical barrier which would prevent clear visibility onto Green Lane for those wishing to turn left. Therefore, the location of the hub would obscure visibility of any pedestrian located in this space, leaving limited room to stop safely as they come into view when travelling eastward.
For vehicles travelling in a westward direction, drivers would be met with traffic signals prior to the junction with [address]. As such, this would require their concentration to be on the highway, preparing to stop when these signals turn to red. When travelling in this direction, the proposed advertisement display would be to the right of the driver. Due to the proposed advertisement’s position to the right of the highway, drivers approaching from this direction would need to turn their heads to view its content, thereby diverting their attention from the road ahead. [name] have stated previously, advertisements by their very nature are there to attract attention. The proposal would cause distraction near a signalised junction where drivers may be required to stop unexpectedly. This concern would be further compounded by the presence of other vehicles along this busy route, which would further restrict the space available for safe deceleration and stopping.
The appellant has provided various reasoning to overcome these apprehensions regarding highway safety. They note that the luminance of the advertisement screens are proposed to be kept to a technical minimum and that imagery would be static, changing only every 10 seconds. This is a matter that can indeed be controlled by the use of a planning condition. However, this would not overcome the concerns I have with regard to the physical position of the structure, or that any advert, static or otherwise, would attract the attention of drivers, as is intended with any advertisement. It is also contended that the footpath would retain a sufficient overall width. In my assessment of this matter, owing to the space that would be afforded across the footpath post construction, I do not disagree with this point. However, it would not overcome the concerns raised above with regard to the position of the proposals and how they would distract and reduce visibility for road users.
Several appeal decisions have been submitted for consideration in relation to highway safety. These decisions have been provided in full. However, the cited cases relate to locations such as Bracknell, York, Haringey, and Islington, with the nearest example being located in Bury. These areas are all a significant distance from the appeal site and are therefore likely to present materially different highway contexts. Moreover, appeal decisions are determined on their own merits. The fact Appeal Decisions 6005275 and 6005277 that a similar form of development has been allowed elsewhere does not, in itself, indicate that an appeal should be allowed at the appeal site location.
Therefore, to conclude, the proposed development and advertisements would have an unacceptable impact upon highway safety. No convincing technical evidence to demonstrate otherwise has been provided in the evidence before me. Therefore, the proposed development would conflict with Policy INF3 of the SADP, insofar as it is a material consideration with regards to Appeal B. This policy seeks for development to not have an unacceptable impact on highway safety, amongst other things.
Section 07
Planning Balance and Conclusion
The appellant suggests that any harm arising from the proposals would be minor and would be outweighed by the associated public benefits. The benefits of the development are clearly set out within the appeal submission. These include the provision of free Wi‐Fi, access to public services, device‐charging facilities, emergency and community messaging, renewable‐energy operation, a defined number of free advertising hours for the Council and local businesses, and equipment to monitor certain environmental conditions, among other features. Taken together, I afford these benefits moderate positive weight.
I also note that the proposed development would replace an outdated element of the BT telephone kiosk estate. Where such installations have become worn and visually tired, their replacement is a positive consideration. However, the kiosk to be removed is not located within the immediate vicinity of the appeal site. It is located a significant distance away. As a result, this matter attracts only very limited, albeit positive, weight.
In this case, although the identified public benefits collectively attract moderate positive weight, they do not outweigh the unacceptable impact the development would have on highway safety. Highway safety is a matter of paramount public importance, and the level of harm identified carries significant negative weight in my overall assessment. There are no material considerations of sufficient weight or significance before me to justify a decision other than in accordance with the development plan or the National Planning Policy Framework.
For the reasons given above, the appeals should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 4No official casework-database value to compare
- Extracted decision date · page 1
- 27 May 2026Matches the official casework database
- Extracted site visit dates
- 21 May 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6005277
- Application reference
- 25/3882/ADV
- Lead case reference
- Not recorded
- Planning authority
- Cheshire East
- Planning authority code
- E06000049
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Commercial Appeals Service (Adverts)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- No Application Type Assocaited
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- Not recorded
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 18 February 2026
- Valid date
- 18 February 2026
- Start date
- 26 February 2026
- Planning authority decision date
- 22 January 2026
- Appeal decision date
- 27 May 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office
- Dataset status
- Current release
- Catalogue record ID
- 89394
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 20 August 2026 at 16:29