Appeal 6005288
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
4 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a first floor rear extension and a single storey rear extension.
Section 02
Decision
The appeal is allowed and planning permission is granted for a first floor rear extension and a single storey rear extension at [site address] , [site address] , Hertfordshire [postcode] in accordance with the terms of the application, Ref 3/25/1692/HH, subject to the following conditions:
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: ELA/1A, ELA/2A, ELA/3A, ELA/4A, ELA/5A, ELA/6A, ELA/13A, ELA/14A and ELA/18A.
The materials to be used in the construction of the external surfaces of the extension hereby permitted shall match those used in the existing building, with the exception of external door materials as stated on the application form.
Section 03
[name]
The main issue is whether the proposal would be inappropriate development in the Green Belt.
Section 04
Whether inappropriate in the Green Belt
[address] is a street of mainly large, detached houses of varied architectural character, sitting back from the street on generously sized plots within this loosely built-up village. No 14 is typical in all these respects. It has an asymmetrical 2 storey rear wing, including a cat-slide roof that drops down to a flat roofed single storey section. The proposal would add to the first floor at the back, re-forming the rear wing into a full width 2 storey gabled section with the roof ridge running parallel to the main roof. A further single storey rear extension would be added behind the 2 storey section.
[site address] is washed over by the Green Belt. Paragraph 153 of the National Planning Policy Framework (the Framework) advises that inappropriate development is by definition harmful to the Green Belt and should not be approved except in very special circumstances. Paragraph 154 explains that development in the Green Belt is inappropriate unless one of the listed exceptions applies. These exceptions include: (c) the extension or alteration of a building provided that it does not result in disproportionate additions over and above the size of the original building. East Herts District Plan (DP) policy GBR1 states that planning applications for development in the Green Belt will be considered in line with the provisions of the Framework.
Neither the Framework nor DP policy GBR1 defines the term disproportionate additions, leaving this to a case by case assessment. The Framework refers to the size of the resulting building in relation to the original building. The cumulative physical size of additions in relation to the original structure (in this case as existing in 1948) is therefore the key consideration, though visual impact may also play a part in the assessment.
Based on a historic OS plan, the Council estimates that the original house had a footprint of about 72 sqm and a floorspace of about 143 sqm. Of these 2 measurements I take floorspace to be the more accurate representation of size, as footprint tends to overemphasise the scale of single storey sections. The Council measures the existing building to have a floorspace of about 205 sqm, nearly a 44% increase in comparison to the original building. It advises that this proposal would bring the cumulative increase in floorspace to about 65%.
The appellant does not dispute these figures, which indicate a cumulative increase significant enough to potentially be considered disproportionate. On the other hand, however, the proposal has been well-designed to minimise its bulk, massing and visual impact. The proposed first floor extension would consolidate the form of the house at the back, dropping down in height and making efficient use of the space without giving the impression of a significantly larger building. The proposed extensions would furthermore be almost entirely screened from public view by the existing building - even though some new views have been opened up by the ongoing construction of a new house on the site next door. The actual visual impact of the proposal would therefore be very limited.
On balance I conclude that the proposal, taken together with existing extensions, would not represent a disproportionate addition to the original building. The proposal is therefore not for inappropriate development in the Green Belt and accords with both the Framework and DP policy GBR1.
Neither the Council nor any third parties have raised any other objections to the proposal. I impose a condition specifying the relevant plans to provide certainty. A condition requiring the use of matching materials is needed to protect the character of the house and the local area.
I find that the proposal accords with the development plan and the Framework. For the reasons set out above, and having regard to all other matters raised, I conclude that the appeal should succeed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 890No official casework-database value to compare
- Extracted decision date · page 1
- 8 May 2026Matches the official casework database
- Extracted site visit dates
- 27 April 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6005288
- Application reference
- 3/25/1692/HH
- Lead case reference
- Not recorded
- Planning authority
- East Hertfordshire District Council
- Planning authority code
- E07000242
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Householder
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 1,245 m²
- Number of residences
- Not recorded
- Site in Green Belt
- Yes
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 18 February 2026
- Valid date
- 25 February 2026
- Start date
- 25 February 2026
- Planning authority decision date
- 4 February 2026
- Appeal decision date
- 8 May 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office
- Dataset status
- Current release
- Catalogue record ID
- 88514
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21