Skip to main content
Official casework recordAllowedCurrent release

Appeal 6005288

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

4 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a first floor rear extension and a single storey rear extension.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for a first floor rear extension and a single storey rear extension at [site address] , [site address] , Hertfordshire [postcode] in accordance with the terms of the application, Ref 3/25/1692/HH, subject to the following conditions:

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: ELA/1A, ELA/2A, ELA/3A, ELA/4A, ELA/5A, ELA/6A, ELA/13A, ELA/14A and ELA/18A.

    The materials to be used in the construction of the external surfaces of the extension hereby permitted shall match those used in the existing building, with the exception of external door materials as stated on the application form.

  2. Section 03

    [name]

    The main issue is whether the proposal would be inappropriate development in the Green Belt.

  3. Section 04

    Whether inappropriate in the Green Belt

    [address] is a street of mainly large, detached houses of varied architectural character, sitting back from the street on generously sized plots within this loosely built-up village. No 14 is typical in all these respects. It has an asymmetrical 2 storey rear wing, including a cat-slide roof that drops down to a flat roofed single storey section. The proposal would add to the first floor at the back, re-forming the rear wing into a full width 2 storey gabled section with the roof ridge running parallel to the main roof. A further single storey rear extension would be added behind the 2 storey section.

    [site address] is washed over by the Green Belt. Paragraph 153 of the National Planning Policy Framework (the Framework) advises that inappropriate development is by definition harmful to the Green Belt and should not be approved except in very special circumstances. Paragraph 154 explains that development in the Green Belt is inappropriate unless one of the listed exceptions applies. These exceptions include: (c) the extension or alteration of a building provided that it does not result in disproportionate additions over and above the size of the original building. East Herts District Plan (DP) policy GBR1 states that planning applications for development in the Green Belt will be considered in line with the provisions of the Framework.

    Neither the Framework nor DP policy GBR1 defines the term disproportionate additions, leaving this to a case by case assessment. The Framework refers to the size of the resulting building in relation to the original building. The cumulative physical size of additions in relation to the original structure (in this case as existing in 1948) is therefore the key consideration, though visual impact may also play a part in the assessment.

    Based on a historic OS plan, the Council estimates that the original house had a footprint of about 72 sqm and a floorspace of about 143 sqm. Of these 2 measurements I take floorspace to be the more accurate representation of size, as footprint tends to overemphasise the scale of single storey sections. The Council measures the existing building to have a floorspace of about 205 sqm, nearly a 44% increase in comparison to the original building. It advises that this proposal would bring the cumulative increase in floorspace to about 65%.

    The appellant does not dispute these figures, which indicate a cumulative increase significant enough to potentially be considered disproportionate. On the other hand, however, the proposal has been well-designed to minimise its bulk, massing and visual impact. The proposed first floor extension would consolidate the form of the house at the back, dropping down in height and making efficient use of the space without giving the impression of a significantly larger building. The proposed extensions would furthermore be almost entirely screened from public view by the existing building - even though some new views have been opened up by the ongoing construction of a new house on the site next door. The actual visual impact of the proposal would therefore be very limited.

    On balance I conclude that the proposal, taken together with existing extensions, would not represent a disproportionate addition to the original building. The proposal is therefore not for inappropriate development in the Green Belt and accords with both the Framework and DP policy GBR1.

    Neither the Council nor any third parties have raised any other objections to the proposal. I impose a condition specifying the relevant plans to provide certainty. A condition requiring the use of matching materials is needed to protect the character of the house and the local area.

    I find that the proposal accords with the development plan and the Framework. For the reasons set out above, and having regard to all other matters raised, I conclude that the appeal should succeed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 890No official casework-database value to compare
    Extracted decision date · page 1
    8 May 2026Matches the official casework database
    Extracted site visit dates
    27 April 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6005288
Application reference
3/25/1692/HH
Lead case reference
Not recorded
Planning authority
East Hertfordshire District Council
Planning authority code
E07000242

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Householder
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
1,245 m²
Number of residences
Not recorded
Site in Green Belt
Yes
Agricultural holding
Not recorded
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
18 February 2026
Valid date
25 February 2026
Start date
25 February 2026
Planning authority decision date
4 February 2026
Appeal decision date
8 May 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office
Dataset status
Current release
Catalogue record ID
88514
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21