Appeal 6005391

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

hip to gable loft conversion with rear dormer and roof lights to front elevation, to include internal modification at first floor to allow for access to proposed loft space and new window to first floor side elevation.

  1. Section 02

    Decision

    The appeal is allowed, and planning permission is granted for hip to gable loft conversion with rear dormer and roof lights to front elevation, to include internal modification at first floor to allow for access to proposed loft space and new window to first floor side elevation) at [site address] [site address] , [name], Solihull, [postcode] Ref: PL/2025/01372/MINFHO and the plans submitted with it subject to the following conditions:

    The development hereby permitted shall be commenced before the expiration of three years from the date of this permission;

    The development hereby permitted shall be maintained in accordance with the following approved plans: location plan (planning portal reference PP- 14174652v1) and combined plans (site plan, proposed floor plans and proposed elevations – MB169 01 – H);

    The external materials of the extension hereby permitted shall match those used in the existing dwelling;

    Demolition or construction works shall take place only between 08:00 – 18:00 on Monday to Friday, 08:00 – 13:00 on Saturdays and shall not take place at any time on Sundays or on Bank or Public Holidays;

    The extension hereby permitted shall not be occupied until the new window in the first-floor side elevation has been fitted with obscured glazing. No part of that window, which is less than 1.7 metres above the floor of the room in which it is installed, shall be capable of being opened. Details of the type of obscured glazing shall be submitted to and approved in writing by the local planning authority before the window is installed and once installed the obscured glazing shall be retained thereafter.

  2. Section 03

    Procedural Matters

    I have utilised the Council’s description of the proposal as I find it describes the proposal more concisely.

  3. Section 04

    [name]

    The main issues are the impact of the proposal upon the character and visual amenity of the original dwelling, the pair of semi-detached dwellings and the street scene.

  4. Section 05

    Reasons

    The appeal site is a semi-detached property located within a residential area that is largely characterised by semi-detached dwellings that are of a similar character and appearance, largely as a result of symmetrical, hipped, roof forms. Whilst symmetry is not a protected design feature in itself it is, ultimately, a characteristic of [site address] which is notably consistent and, therefore, any changes have the capability of being an incongruous addition to the street scene where they would ultimately be in the minority in terms of design, character and appearance. Furthermore, changes to one side of a semi-detached pair will alter the symmetry of that pair which can then further exacerbate proposed changes in this context.

    At the time of my site visit I noted, a short distance along [site address] from the appeal site, that of 28 [site address] which is also highlighted within the appellant’s statement of case. The property has undergone a hip to gable extension combined with a dormer which has resulted in a loft conversion. The appellant has provided a copy of the certificate of lawfulness (PL/2021/00323/CLOPUD) albeit no copies of the certified plans are provided as part of that appendix. Despite this, the inclusion of the certificate is still demonstrative of the ability of properties within the locality to undertake amendments, including hip to gable extensions incorporating a loft conversion and dormer, beyond the control of the Council as a result of permitted development rights. 28 [site address] , as built, appears not dissimilar in basic terms to the proposal which is before me at the appeal site.

    The appellant has also included a second example, from [address], which is also acknowledged to have certified (PL/2020/00846/CLOPUD) a hip to gable conversion and a rear dormer. At the time of my site visit these works had also been completed and I also noted further, more minor, roof alterations along [site address] itself albeit these have maintained the hip roof structure. The examples provided, by the appellant, are noted to be part of the character of the area but I find that, overwhelmingly, the distinctive character of the area is created by pairs of symmetrical semi-detached dwellings with hipped roof structure. The proposal would, therefore, unbalance the symmetry between the pair of semi-detached dwellings and appear as an incongruous addition to the street scene.

    Solihull Local Plan 2013 (LP) Policy P15 is clear that development proposals should achieve good quality design which meets a list of key principles. The first key principle is that the proposal should conserve and enhance local character, distinctiveness and streetscape quality and ensure that the scale, massing, density, layout and materials of the development respect the surrounding built environment. In addition to this, the National Planning Policy Framework 2024 (the Framework) is clear within paragraph 135, that proposals should be sympathetic to local character. Cumulatively, I find that the hip to gable loft conversion with a rear dormer would fail to respect the character of the area as well as failing to respect the character of the original dwelling which would result in a discordant structure. [name] acknowledge examples, discussed above, of similar proposals having been undertaken within the locality I find that these examples do still stand out, within the street scene, as incongruous additions overall.

    The proposal would also be contrary to the guidance set out within the House Extensions Guidelines Supplementary Planning Document 2010 (SPD) which seeks to avoid large box dormers on rear elevations as well as acknowledging that care must be taken to not upset the symmetry of the architectural unit with regard to semi-detached dwellings. The proposal would, however, be consistent with some elements of the SPD with regard to the dormer being set down from the ridge and above the eave lines but, cumulatively, the proposal would still result in notable additional massing at roof level for the host dwelling. The bulk, scale, massing and design would not realistically respect the character of the host dwelling and would detract from the visual amenity of the appeal site.

    The proposal has been submitted as a planning application and, therefore, it falls to consider the proposal against the relevant Local Plan as is the starting point for determination taking into account all other material considerations. Assessed against the Local Plan policies, discussed above, I find that the proposal would be contrary to their objectives as well as being contrary to the Framework and the guidance set out within the SPD. Despite this, I find that it is a material consideration that, as evidenced by the appellant, in the event this appeal failed the appeal site benefits from a fallback position by virtue of Schedule 2, Part 1 Class B (additions etc to the roof of a dwellinghouse) of the Town and Country Planning (General Permitted Development) (England) Order 2015 (the GDPO).

    There is no evidence before me (such as in the constraint’s section of the Council’s delegated report) which would suggest that the appeal site does not benefit from permitted development rights which would ultimately enable a hip to gable loft conversion with a rear dormer which would result in broadly the same implications, and impacts, as I have highlighted in the context of this appeal proposal. I would, however, make it clear that this appeal is not a determination as to the proposal being, or not being, permitted development.

    My assessment is based upon the fact that in basic terms something with broadly similar implications could likely be constructed beyond the control of the Council which is sufficient to be a material consideration within this appeal. In the event this appeal failed, I find that it is entirely plausible, and a realistic prospect, that the appellant would seek to pursue the alterations via/within the scope of permitted development and this is a factor which I give significant weight in the consideration of this appeal. On this basis, I find this is sufficient to mean that the appeal should be allowed.

    The proposal also includes a new window to the first-floor side elevation. Based upon the proposed first floor layout the window would serve a WC i.e. not a habitable room and it has been labelled, on the plans provided, as being obscured. Given that the window is to be in a side elevation it is reasonable, combined with the intended use, to apply a further condition requiring the glazing to be obscured to mitigate any overlooking (including perceived overlooking) as a result of a new window to the first-floor side elevation. The Council’s delegated report raises no reason for refusal based upon the proposed skylights or the first-floor side window and, based upon the above and subject to conditions, I have no reason to conclude differently on these matters.

  5. Section 06

    Other Matters

    I note third party comments which have been received during the application process. I have dealt with matters relating to general design and character in the context of the main issue above. The Council raise no refusal reason based upon neighbouring residential amenity with regard to loss of privacy, overlooking or overbearing and dominant appearance. Based upon the evidence before me, and my site visit, I find no reason to conclude differently and whilst I note the rear dormer will introduce further windows in the rear elevation, I do not find their presence would result in sufficient reason for refusal. Natural views, from the windows in question, would generally be down the garden where a degree of intervisibility between gardens and dwellings is to be accepted within a residential area of this nature and development pattern.

    Comments have also been made regarding building works taking place, however, given the scale of the proposal, whilst I acknowledge there will be some impact to neighbouring properties during the construction phase, this is insufficient to warrant refusal. I have, however, applied a condition restricting the timings for building works and operations to ensure that this is kept to an appropriate time window each day to appropriately mitigate and control disruption during the construction phase.

    With regard to parking, and I am mindful that the proposal would increase the number of bedrooms as demonstrated by the proposed loft layout. The proposal is likely to result in further parking associated with the property, however, at the time of my site visit, which I appreciate is a snapshot in time, I did not find any particular issue with regard to on-street parking or the pavements being blocked. Again, I would raise that in the event this appeal failed it is a material consideration that, within the confines of permitted development, the appellant would be able to do a hip to gable loft conversion and a dormer with broadly similar implications. As a result of this fallback position, therefore, a refusal reason based upon displacement of parking on street cannot be substantiated in this case.

    Fear of a precedent is an insufficient reason for refusal as each case should be considered on its own merits, at the appropriate point of assessment, whether that be via a certificate of lawfulness or planning application as appropriate to sites elsewhere and in the future.

  6. Section 07

    Conditions

    A time condition is attached to comply with Section 51 of the Planning and Compulsory Purchase Act 2004. A condition requiring the development to be in accordance with the approved plans is required to control and define the development which is granted consent. A materials condition is required to ensure an appropriate finish in accordance with the details stated, on the application form, and in order to match those used the existing building where applicable to ensure a high quality and appropriate finish.

    A condition requiring the new first floor side elevation window to be obscurely glazed is required to protect the amenity of adjacent residential dwellings as a result of a first-floor side window and condition, controlling working hours and days is required in order to control and appropriately mitigate the impact of construction works on neighbouring properties during the construction period as a result of concern raised within the objections as outlined.

  7. Section 08

    Conclusion

    For the reasons outlined above, and taking into account all other matters raised, I conclude that the appeal should be allowed subject to conditions.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 6324No official casework-database value to compare
    Extracted decision date · page 1
    24 April 2026Matches the official casework database
    Extracted site visit dates
    9 April 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6005391
Application reference
PL/2025/01372/MINFHO
Lead case reference
Not recorded
Planning authority
Solihull Metropolitan Borough Council
Planning authority code
E08000029

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Householder
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
320 m²
Number of residences
Not recorded
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
20 February 2026
Valid date
20 February 2026
Start date
27 February 2026
Planning authority decision date
18 December 2025
Appeal decision date
24 April 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office
Dataset status
Current release
Catalogue record ID
87828
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21