Skip to main content
Official casework recordDismissedCurrent release

Appeal 6005493

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

10 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

Permission in Principle (Stage 1) for up to 7 dwellings through the reuse of the farmbuildings.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    The proposal is for permission in principle. Planning Practice Guidance advises that this is an alternative way of obtaining planning permission for housing-led development. The permission in principle consent route has 2 stages: the first stage (or permission in principle stage) establishes whether a site is suitable in-principle and the second (technical details consent) stage is when the detailed development proposals are assessed. This appeal relates to the first of these 2 stages.

    The scope of the considerations for permission in principle is limited to location, land use and the amount of development permitted. All other matters are considered as part of a subsequent technical details consent application if permission in principle is granted. I have determined the appeal accordingly.

    Permission in principle has previously been granted1 for up to 4 dwellings on part of the current appeal site. However, the Council advises that this was on the basis that this would be achieved via the conversion of the existing stone-built farm buildings. From the submissions made by the appellant, it does not appear likely that either the grain store or the [name] would be suitable for conversion. It is not suggested that the further [address] needed in order that the permitted 4 can be delivered. My assessment of this appeal is therefore focussed on what would be an uplift of up to 3 dwellings in comparison to what has previously been approved.

    The number of dwellings was reduced from 9 to 7 during the course of the determination of the application. I therefore proceed on the basis that the proposal is for 7 dwellings and this is reflected in the description set out in the banner header above. 1 NE/24/00276/PIP

    In terms of the matter which forms reason for refusal 2 and which relates to the impact on character and appearance, residential dwellings could in principle be designed to be appropriate in the context of a former farmstead. Although this would extend the extent of the residential development that would take place in land take terms, the additional buildings would be clustered close to the stone-built farm buildings, and they would replace existing agricultural buildings. I therefore see no reason why this is not a matter which could be left to consideration at technical details consent stage in this instance.

  3. Section 04

    Main Issue

    The main issue is whether the site is suitable for residential development, having regard to its location, the proposed land use and the amount of development.

  4. Section 05

    Reasons

    The appeal site is located outside of the settlement envelope of [site address] as defined in the development plan, and as such it is within the open countryside. Policy EN1 of the East Northamptonshire Local Plan Part 2 2023 (LP) states that development will be refused for new build residential development units in locations beyond the built area of settlements. Policy EN1 does however make an exception in a case where there would be a re-use or conversion of an existing building. Therefore, in terms of any elements of the proposal that would not represent the re-use or conversion of existing buildings, there is no policy support in the development plan for such development in this location.

    It would appear from the submissions that there is little confidence that the grain store and Dutch barn could be retained and converted. There is no substantive evidence or feasibility study to demonstrate that this might be possible. I am not therefore satisfied that what would ultimately take place would include a re-use or conversion of those buildings. This speaks to each of the matters of location, proposed land use and the amount of development when the proposal is assessed against the relevant development plan policies, in the sense that there is no provision in those policies for what would occur. This matter is therefore central to whether the proposal would be compliant with the development plan and could not be left to technical details consent stage.

    In conclusion, it has not been demonstrated that the proposal would accord with Policies 1, 11, 13, 25 and 29 of the [name] 2016 and Policies EN1, EN2 and EN3 of the LP where, taken together, they set out the strategic approach to new development and to its location.

  5. Section 06

    [name]

    The tilted balance set out in paragraph 11d) of the National Planning Policy Framework (the Framework) is engaged because the Council cannot demonstrate a five year housing land supply. The figure is put at 4.6 years. It has not been suggested that the provisions of paragraph 11d)i) are applicable in this instance. In terms of paragraph 11d)ii), this states that planning permission should be granted unless any adverse impacts of doing so would significantly and demonstrably outweigh the benefits, when assessed against the policies in the Framework taken as a whole, having particular regard to key policies for directing development to sustainable locations, making effective use of land, securing well-designed places and providing affordable homes, individually or in combination.

    The proposal would make a contribution to boosting the supply of new homes in the face of the current housing land supply position, albeit this is a modest undersupply, and would make an effective and efficient use of land in comparison to what are said to be redundant agricultural buildings. There would be some economic benefits including during construction and then from spend in the local economy by future occupants. At technical details stage matters such as landscaping and biodiversity would be considered, and there may be a benefit in both regards too. The uplift from this proposal in comparison to that which has already been permitted via the conversion of the stone-built farm buildings would be up to 3 dwellings, and collectively these considerations offer moderate weight in favour of the proposal.

    Balanced against this is the poor locational sustainability credentials of the appeal site. There are very limited services and facilities available in [site address] . The bus service referred to appears to be infrequent in terms of the number of daily services that it provides. The settlement of Oundle is not within reasonable walking distance and, without any substantive evidence to the contrary, I have significant reservations that it would be an attractive proposition for a cyclist to travel there given the nature of the road which leads to it. In any event, that form of transport would almost certainly not be viable in order to access the schools and the GP surgery which the appellant highlights are found in Oundle. There would therefore be a heavy reliance on the use of private motor vehicles to access services and facilities.

    The thrust of the Framework is to focus new development on locations which are or can be made sustainable, through limiting the need to travel and offering a genuine choice of transport modes. There is no explicit support in the Framework for new market housing in locations such as the appeal site and in the circumstances proposed, nor is there any substantive evidence as to how this proposal would enhance or maintain the vitality of rural communities. There is also no evidence provided of a specific need for the proposed dwellings in this particular rural location. These considerations weigh significantly against the

  6. Section 07

    appeal proposal.

    In conclusion, I find that the harm in locational terms would significantly and demonstrably outweigh the benefits I have identified. The presumption in favour of sustainable development does not therefore apply.

  7. Section 08

    Other Matters

    The appellant suggests that there may be an opportunity to reuse or redevelop the site to provide self-build and custom housing. However, this does not appear to be a firm commitment, and they have provided no commentary on how or to what degree such provision might add support to their case. I am not persuaded that what is proposed would represent rural diversification.

    They further refer to a fallback of utilising permitted development rights under Class Q of the Town and Country Planning (General Permitted Development) (England) Order 2015. However, there are no details to suggest that this is an option open to them, and if the grain store and Dutch barn are not capable of conversion then it would not be.

    This proposal seeks to provide 7 dwellings, which is a net increase from the 4 which has previously been approved. The appellant considers that it is in accordance with paragraph 3.5.1 of the Village Design Statement which acknowledges a need to be progressive and look to increase the size of the village. However, it remains that development which does not represent re-use or conversion is not supported by the policies of the development plan.

    I acknowledge that the Council has previously accepted that 4 dwellings are acceptable on land which includes part of the current appeal site. However, such a proposal was deemed to be in accordance with the relevant policies of the

  8. Section 09

    Planning Balance & Conclusion

    The proposal would fail to accord with the strategic policies set out in the development plan. There would as a result be a failure to accord with the development plan, taken as a whole.

    There would be some benefits of the scheme, to which I have collectively afforded moderate weight, but I have found that the presumption in favour of sustainable development does not apply. Those benefits do not outweigh the conflict with the

  9. Section 10

    development plan.

    In conclusion, I do not find that material considerations indicate that a decision should be made at variance with the development plan, and consequently the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 183No official casework-database value to compare
    Extracted decision date · page 1
    28 May 2026Matches the official casework database
    Extracted site visit dates
    5 May 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6005493
Application reference
NE/24/00838/PIP
Lead case reference
Not recorded
Planning authority
North Northamptonshire
Planning authority code
Not recorded

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Minor Dwellings
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Planning Appeals - Full
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
9,400 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
24 February 2026
Valid date
24 February 2026
Start date
2 March 2026
Planning authority decision date
7 October 2025
Appeal decision date
28 May 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
89476
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29