Appeal 6005685
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
9 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
20 metre high streetworks pole with built in cabinet, 9no. radio antennas, 2no. small transmission dishes and associated cabinets.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
The provisions under Article 3(1) and Schedule 2, Part 16, Class A of the GPDO require the local planning authority to assess the proposed development solely on the basis of its siting and appearance, taking into account any representations received. My determination of this appeal has been made on the same basis, having regard to the policies of the development plan and the National Planning Policy Framework (the Framework) only insofar as they are material to the matters of siting and appearance.
Section 04
[name]
The main issues are the effect of the siting and appearance of the proposed telecommunications installation on i) pedestrian accessibility and convenience; ii) the character and appearance of the area; and iii) if any harm would occur, whether this would be outweighed by the need for the installation to be sited as proposed, taking into account any suitable alternatives.
Section 05
Pedestrian accessibility and convenience
The appeal site is located on the footway at the junction of [address] and [address], in close proximity to a primary school, a zebra crossing, local retail uses and a bus route. The evidence before me indicates that this location functions as a well-used desire line and informal gathering space, particularly at peak school times when parents and children congregate in the vicinity of the school entrance and crossing points.
The proposal would introduce a 20 metre streetworks pole together with multiple cabinets within the footway. This would reduce the effective width of the footway at certain points, with pinch points of around 2.0 metres identified.
I have had regard to the Leeds Transport Supplementary Planning Document (SPD), which identifies that wider footways, typically around 3.0 metres, are desirable in areas of high pedestrian activity such as those adjacent to schools. However, the SPD must be read as a whole and recognises that utilities apparatus may be accommodated within existing streets, subject to maintaining sufficient width for pedestrian movement.
In this regard, a clear width of around 2.0 metres may, in principle, be sufficient to allow wheelchair users to pass and to ensure basic accessibility. Nevertheless, the acceptability of such a width is highly context-specific, depending on the functional characteristics and intensity of use of the space.
The appellant submits that the available footway width would be significantly greater, indicating a gap of around 3.8 metres between the carriageway edge and the proposed apparatus. However, even if a greater overall width exists at parts of the site, the relevant consideration is the effective and useable width available to pedestrians, taking into account the position of the mast and cabinets, existing street furniture, and the way in which the space is used in practice. In this respect, the proposal would introduce localised narrowing and obstruction within an area of complex pedestrian activity, and it is these functional constraints, rather than any theoretical overall width, which are determinative.
The evidence from the school and local residents indicates that the appeal site lies within an area of concentrated pedestrian activity where users do not simply pass through but also gather, wait and interact. The presence of a nearby crossing, retail uses and access points further contributes to a more complex pattern of movement, including children, pushchairs and groups moving simultaneously.
The introduction of fixed infrastructure at this location would reduce the flexibility of the use of the space by pedestrians, introduce an additional obstruction within an already active environment, and increase the likelihood of conflict between pedestrians, particularly at peak times. This is materially different from a situation where a reduced width occurs along a simple through route. No detailed assessment of pedestrian movements or peak-time conditions has been provided to demonstrate that such impacts would not occur.
Taking all of the above into account, I conclude that the siting of the proposal would result in an unacceptable impact on pedestrian accessibility and convenience, and would fail to demonstrate compliance with the requirement under paragraph A.2(1)(d) of the GPDO, which requires that development does not impede pedestrian passage having regard to the needs of all users.
Although not determinative, the proposal also conflicts with the objectives of Policy T2 of the [name] ([name] 2019) and saved Policy GP5 of the Leeds Unitary Development Plan (Review 2006), insofar as they seek to ensure safe and convenient access for all users.
Section 06
Character and appearance
The appeal site lies within a mixed-use suburban environment characterised by residential development, open space, local retail uses and a range of street furniture. The streetscape includes vertical elements such as lighting columns, signage and trees, and there is variation in building heights and spatial openness.
The proposed monopole would be approximately 20 metres in height and would be taller than nearby street furniture. It would therefore be visible and would introduce a new vertical feature into the street scene. However, it would have a relatively slender, functional form typical of modern telecommunications infrastructure and would be viewed within an environment that already accommodates a variety of utilitarian features.
[name] recognise that the proposal would be more prominent than surrounding street furniture, the mixed character, the presence of existing vertical elements, and the utilitarian nature of the installation would allow it to be read as part of the wider urban environment rather than as an incongruous or visually harmful addition to the street scene.
Furthermore, the proposal would not give rise to unacceptable effects on the living conditions of nearby residential occupiers in terms of overbearing impact, given the separation distances and its slender profile.
Accordingly, I conclude that the proposal would not cause harm to the character and appearance of the area and would accord with Policies P10 and P12 of the [name] and saved Policy GP5 of the UDP in this regard.
Section 07
Alternatives
The proposal forms part of a replacement telecommunications installation necessitated by the loss of an existing site. The appellant explains that the siting of telecommunications infrastructure is constrained by operational requirements, including the need to maintain network coverage, avoid interference with other installations and respond to topographical conditions. A sequential approach to site selection has been undertaken, considering site sharing, existing structures and ground-based options within the defined search area. This attracts some weight in support of the proposal.
However, the key issue is whether it has been demonstrated that the installation must be sited in the particular location proposed, and that no less harmful alternative exists within the search area.
Although alternative sites have been considered, the supporting evidence is limited in its technical depth. In particular, there is no robust comparative analysis demonstrating why alternative locations that may give rise to less conflict with pedestrian movement could not reasonably be accommodated within the operational requirements. Nor is there substantive evidence to demonstrate how variations in siting would materially affect network performance.
The proposal would place infrastructure within a part of the highway that serves an important pedestrian function, rather than in a location where the interactions with pedestrians would be less pronounced. Having regard to my findings on pedestrian movement and convenience, I am not persuaded that the proposed siting represents the most appropriate or least harmful option.
Accordingly, whilst I accept that alternative sites may be limited, the evidence does not demonstrate that the specific siting is necessary so as to outweigh the harm identified.
I have considered the appeal decisions referred to by the appellant. However, each case must be determined on its own merits. In those instances, Inspectors were satisfied that the identified harm was outweighed by operational requirements, particularly where there were no unacceptable impacts on pedestrian movement.
In this case, my findings turn on the effect on pedestrian accessibility within a well-used part of the highway, associated with a school and local facilities. For the reasons given, I have found that the proposal would result in an unacceptable impact on the safe and convenient movement of pedestrians. The appeal decisions cited do not therefore alter my overall conclusion.
Section 08
Other Matters
I have noted the appellant’s references to the economic and social benefits of modern telecommunications infrastructure and the wider national policy support for digital connectivity. Advanced and reliable communications infrastructure is clearly important to economic growth and social well-being.
However, planning permission for the proposed development is granted by the provisions of the GPDO, subject only to a prior approval process in respect of siting and appearance. The principle of the development, and the general policy support for telecommunications infrastructure, are therefore already embodied within the GPDO.
Accordingly, the determination of this appeal is confined to the effects of the proposal in terms of its siting and appearance. It is not the role of the decision maker in a prior approval application to reassess those wider benefits or apply a general planning balance. Thus, whilst I have had regard to the appellant’s submissions, the wider benefits of the proposal do not alter my findings in respect of the main issues.
Section 09
Conclusion
For the reasons given above, the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 597No official casework-database value to compare
- Extracted decision date · page 1
- 11 May 2026Matches the official casework database
- Extracted site visit dates
- 28 April 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6005685
- Application reference
- 25/06013/DTM
- Lead case reference
- Not recorded
- Planning authority
- Leeds City Council
- Planning authority code
- E08000035
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Other minor developments
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Prior Approval
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 7 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- No
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 27 February 2026
- Valid date
- 3 March 2026
- Start date
- 3 March 2026
- Planning authority decision date
- 7 November 2025
- Appeal decision date
- 11 May 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office-s78
- Dataset status
- Current release
- Catalogue record ID
- 88599
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 20 August 2026 at 16:29