Skip to main content
Official casework recordAllowedCurrent release

Appeal 6005790

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

single storey side and rear extensions.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for single storey side and rear extensions at [site address] , York [postcode] in accordance with the terms of the application, reference 25/02041/FUL, subject to the following conditions:

    The development hereby permitted shall be carried out in accordance with drawing nos; 125 - 02 Existing and Proposed Site Layouts, 125 - 04 Existing and [name] and 125 - 06 Existing and [name].

    The bin store as shown on Existing and [name] drawing no. 125/04 shall be retained and maintained in working order for the lifetime of the development.

  2. Section 03

    Applications for costs

    An application for costs was made by [name] against the decision of City of York Council. This application is the subject of a separate decision.

  3. Section 04

    Background and Main Issue

    At the time of my site visit, it was apparent that the extension had already been constructed. Retrospective as referred to in the application form and the decision notice does not constitute an act of development. I have dealt with the appeal on the basis that planning permission is being sought for the erection of a single storey side and rear extension.

    There is no dispute between the parties about the acceptability of the scale of the rear extension or the proposed bin storage arrangements. Based on the evidence before me, I am satisfied that these aspects of the appeal proposal would not cause harm to the character and appearance of the area or the living conditions of neighbouring properties. Therefore, I have confined my consideration to the storage of cycles for the development.

    In light of the above, the main issue is whether the cycle access and storage arrangements provide an acceptable level of provision, having regard to Policy T1 of the City of York Local Plan (LP).

  4. Section 05

    Reasons

    The appeal property is a mid-terraced house located in a predominantly residential area. The street is characterised by a mix of terrace, semi-detached and detached two-storey properties The appeal property appears to be typical of the terraces along the street with stepped access to the front door along with a shared a ginnel access with its neighbour No [address].

    LP Policy T1 seeks to ensure that development provides sufficient, convenient, secure and covered storage, ideally within the curtilage of new development. The supporting text makes clear that this requirement is directed primarily at new buildings and sets out that the aim is to encourage the ownership and use of cycles. In this case, the proposal relates to an extension to an existing dwelling, and a proportionate and context specific approach to the application of the policy is therefore required.

    At my site visit it was evident that cycles are currently stored safely within a ‘ginnel’ to the side of the property, which provides direct external access independent of the main dwelling. The ‘ginnel’ is of sufficient width to allow cycles to be moved conveniently and without obstruction, and I was able to walk through it unhindered. This arrangement avoids the need to move cycles through internal living space and represents a practical, established means of storage. In addition, secure cycle storage is provided to the rear of the property within a shed, offering additional weather-protected and enclosed storage within the curtilage of the dwelling. Whilst this rear storage is accessed via the dwelling, it nonetheless represents a suitable and reasonable arrangement in the context of an existing terraced property. Taken together, these measures provide functional and workable cycle storage solutions and negate the need for storage within the front curtilage. As a result, the development would not give rise to harm to the streetscene in this regard.

    [name] accept that LP Policy T1 also refers to provision for impaired mobility, the original dwelling was not designed to accommodate such needs. In these circumstances, it would be unreasonable and disproportionate to impose this requirement on an extension, as this would seek to remedy an inherent limitation in the original building rather than an impact arising from the appeal proposal itself.

    The City of York Council: [name] and [name] is guidance rather than development plan policy and is intended to be applied flexibly. In this case, the existing side access and rear storage arrangements adequately meet the aims of the SPD. Paragraph 8.4 does not impose a fixed requirement for a 0.9 metre access gap in all circumstances, and the absence of such a gap does not, in itself, indicate non-compliance.

    I have had regard to LTN 1/20, but as it is guidance rather than development plan policy, and LP Policy T1 sets no numerical requirement for cycle storage, I do not consider it to be determinative in this case.

    I am not satisfied that the Councils reasoning demonstrates a justified conflict with the development plan, having regard to the outcome-focused and proportionate application of the LP Policy T1. As a result, I find that the development is in accordance with Policies D1, D11 and T1 of the City of York Local Plan (2025) which, among other things, seek to promote sustainable modes of transport.

  5. Section 06

    Other Matters

    I note the neighbours’ comments regarding the scale of the development. However, there is no dispute between the Council and the appellant on this matter, either in relation to its appearance or any effect on living conditions, and I have no reason to disagree with those findings. This matter has not led me to an alternative conclusion on the main issue.

    I note the Lead Local Flood Authority’s observation that the extension has been constructed over a public sewer and that separate consent would be required from [name]. This is a matter for other regulatory regimes and does not indicate harm in planning terms. It therefore carries no weight in the determination of this appeal.

  6. Section 07

    Conditions

    A condition requiring the development to be carried out in accordance with the approved plans is necessary for certainty.

    A condition requiring the retention of the approved refuse storage in the front curtilage is also necessary to ensure that adequate refuse facilities remain available and that refuse storage does not give rise to harm to the character and appearance of the streetscene.

  7. Section 08

    Conclusion

    For the reasons given above the appeal should be allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Costs Decision

    Extracted inspector · page 1
    Inspector attribution ID 6765No official casework-database value to compare
    Extracted decision date · page 1
    26 June 2026Matches the official casework database
    Extracted site visit dates
    21 April 2026 (page 1)
  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 6765No official casework-database value to compare
    Extracted decision date · page 1
    26 June 2026Matches the official casework database
    Extracted site visit dates
    21 April 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6005790
Application reference
25/02041/FUL
Lead case reference
Not recorded
Planning authority
City of York Council
Planning authority code
E06000014

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Householder
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
183 m²
Number of residences
Not recorded
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
2 March 2026
Valid date
3 March 2026
Start date
10 March 2026
Planning authority decision date
9 December 2025
Appeal decision date
26 June 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Yes
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office
Dataset status
Current release
Catalogue record ID
91060
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21