Appeal 6005939
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
demolition of the existing cycle storage building and construction of a detached single storey building for cycle and refuse/recycle provision.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
The application the subject of this appeal was submitted in tandem with an application for prior approval to change the use of [site address] from commercial to residential. That application was refused, citing a failure to provide cycle and refuse/recycle storage or safe access, and has not been appealed. A resubmission remains undetermined1.
On my site visit I was able to view the appeal site and the adjoining property [address] (No 9). Both the Council and the appellant have referred to [address], but it is clear from the parties’ submissions that they have assessed the impact of the proposal on No 9.
Section 04
[name]
The main issues in this appeal are: • the effect of the proposal on the living conditions of adjoining properties with particular reference to outlook and noise; and • whether the proposal would make adequate provision for bin collection.
Section 05
Living conditions
The proposed storage building would be sited at the rear of [site address] , replacing an existing smaller storage building that backs onto the rear boundary of No 9. From my site inspection, the rear wall of the existing storage building forms 1 LPA references 2025/2983 and 2026/0553 the boundary wall of No 9, with the corrugated roof of the building sitting on top of it. The length of No 9’s boundary that is not bounded by the storage building has a brick wall of similar height.
The proposed building would likewise incorporate the boundary wall. It would be offset from [site address] slightly more than the existing building, but would extend all the way across No 9’s rear boundary. No 9 has a small garden which wraps around the front, side and rear of the house, with the private part of the garden located behind the house. There are no windows facing directly towards the rear wall, but the kitchen window is at right angles to it.
The proposed building would be flat roofed and slightly higher than the existing storage building. Whilst the increase in height would be modest, it would raise the height of nearly all the rear wall of No 9. Such an outcome would affect the outlook from the rear garden and the kitchen. Because the rear garden is of such limited dimensions, any loss of outlook would significantly affect the living conditions of occupiers of the dwelling. As proposed, the storage building would unacceptably harm the outlook from No 9’s garden and kitchen.
The proposed store would, like the existing storage building, have two doors facing into the appeal site. As such, activity and odours within the building are unlikely to directly affect nearby residents, provided the building is satisfactorily sound proofed and sealed, which could be controlled by condition were I minded to allow the appeal. Likewise, the risks of fire, vermin and spillages could be controlled through careful design and appropriate planning conditions.
The current building accommodates bicycles, whilst the proposed building would accommodate both bicycles and bins for the proposed residential accommodation. I observed on my site visit that, although the site is currently vacant, bins are located near the site entrance off [address]. Under the proposal, bin collection in future would take place further into the site, in an area bounded by residential properties. Such collections, even if weekly and lasting for a relatively short period of time, would introduce disturbance into an area where currently cars manoeuvring appears to be the main source of noise. In the absence of a noise report which confirms background noise levels and models refuse collection activities, I cannot be certain that disturbance would not be caused to residents.
I conclude that the proposal would harm the living conditions of adjoining properties owing to a loss of outlook and increased noise. The proposal would be contrary to Policy CS17 of the [name] 2011 (CS) and Policy DM2 of the Elmbridge Local Plan Development Management Plan April 2015 (DMP), which together require new development to deliver high quality design which protects the amenity of adjoining occupiers.
Section 06
Bin collection
The distance between the proposed bin store and the site entrance off [address] would be such that it would be likely to preclude bins being taken by hand to the site entrance. Consequently, refuse collection vehicles would need to drive into the site and, because the site is not wide enough for them to turn, they would need to either reverse into or out of the site.
The appellant has advised that collection vehicles currently visit [address] first and then reverse into the site entrance, and has supplied a swept path analysis which seeks to demonstrate how the existing arrangement could be adapted to serve the proposed bin store. However, the swept path relies on land outside the appellant’s control, and it is unclear whether the collection vehicle would reverse into or out of the site. Under either scenario, the collection vehicle would be required to reverse a significant distance along a route which the swept path analysis shows is very tight in places. Such a manoeuvre would raise safety concerns for both the collection vehicle and for other users of the access road.
The appellant has indicated that bin collection would be undertaken by a private refuse management company, which would either collect direct from the bin store or from a pre-arranged intermediate collection point. They point out that private operators routinely service sites with complex layouts, restricted access or extended drag distances, and are able to offer bespoke collection methods that local authority refuse vehicles cannot. However, in the absence of a clearly set out strategy for undertaking bin collection, it is not clear how bins would be collected safely. Such a strategy would need to explain how the gated access to [address] would be managed, and how [address] would be kept clear whilst bins were collected.
On the basis of the information before me, I conclude that the proposal makes inadequate provision for bin collection, with a consequent risk to highway safety. The proposal would conflict with Policy CS25 of the CS and Policy DM7 of the DMP, which together require the loading, unloading and turning of service vehicles to be designed to ensure highway and pedestrian safety. I have not found conflict with the Parking Supplementary Planning Document July 2020 which, in respect of servicing and loading facilities, covers only non-residential development.
Section 07
Conclusion
For the above reasons, the proposal conflicts with the development plan, when read as a whole. Material considerations do not indicate that a decision should be taken other than in accordance with the development plan. I therefore conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 5456No official casework-database value to compare
- Extracted decision date · page 1
- 28 May 2026Matches the official casework database
- Extracted site visit dates
- 12 May 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6005939
- Application reference
- 2025/2865
- Lead case reference
- Not recorded
- Planning authority
- Elmbridge Borough Council
- Planning authority code
- E07000207
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Other minor developments
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Planning Appeals - Full
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 1,900 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- No
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 5 March 2026
- Valid date
- 9 March 2026
- Start date
- 9 March 2026
- Planning authority decision date
- 16 February 2026
- Appeal decision date
- 28 May 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office-s78
- Dataset status
- Current release
- Catalogue record ID
- 89479
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 20 August 2026 at 16:29