Appeal 6006074

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as “front porch and single-storey front extension; first-floor side extension; part first-floor rear extension; part single-storey rear extension; and loft conversion with rear dormer and three front roof lights”.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Appeal Procedure, [name] and [name]

    The site visit was undertaken by a representative of the Inspector whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal. The original description set out above accurately reflects the development. The main issues in regard to which are its effect on a) the character and appearance of the area; and b) the living conditions of the occupiers of Numbers 125, 127 and 129 (No 125, 127 and 129) [address] in terms of privacy.

  3. Section 04

    Character and Appearance

    The appeal building is a semi-detached dwelling which has been altered in the past but currently retains its primarily original appearance. Surrounding dwellings on the street have experienced significant extensions to the side and rear however, they remain clearly subservient and allow the evolution of the building to be read. Whilst some of the typical London suburb appearance feel has been noticeably diluted, there remains some quality in local consistency in this respect. This contributes positively to the character and appearance of the area.

    The first-floor side extension would be over the single storey existing element and is to meet the same eaves and ridge height of the existing dwelling with a hip to gable roofline. The Redbridge Supplementary Planning Document 2019 (SPD) advises that two storey side extensions should be set down and set back from the main dwelling to be proportionate and subordinate. The lack of this in the scheme would highlight its lack of subservience against the existing dwelling and create a dominant and obtrusive feature in the street scene. The resultant scheme would give the impression of a much larger width and span given its wrap around nature which would subsume the original dwelling. Whilst the SPD is only a guide, the departure from the guidance would create a dwelling unbefitting to the street scene and it would highlight its incongruity to the wider more sympathetic design forms.

    There is some dispute between the main parties on the proposed width of the first-floor rear element. However, in both circumstances it would be more than half that of the dwelling and include the new side extension element. The SPD references how extensions should generally not exceed this. There is some flexibility by virtue of the wording, however for this case it would be seen as a large and imposing feature on the rear elevation almost obscuring the original rear elevation. Collectively, the features described form a dwelling which would be large and stand out against the collective more consistent building forms on the street scene.

    The appellant has given examples of other similar development in the vicinity of a lack of subserviency in terms of ridge height or set back. I have no indication on the wider street scene which would justify these larger examples. They are not on the same road as the appeal site so their presence would not warrant a departure from my current recommendation. With this and the above in mind, the proposal would result in unacceptable harm to the character and appearance of the area. This would lead to conflict with Policies LP26 and LP30 of the Redbridge Local Plan

    Together, and amongst other things, these seek to ensure that development proposals are of a high-quality design and standard.

  4. Section 05

    Living Conditions

    The proposal features a new window on the side elevation which would face towards Nos 125, 127 and 129. The window serving bedroom 5 would not be obscurely glazed. Notwithstanding that a condition could be imposed to obscure the glazing, it would still give the impression of overlooking. However, there is a large separation distance and a change of land levels between the properties and even with the resultant room being a bedroom, the additional window would not result in harmful overlooking that would amount to an unacceptable loss of privacy. The views experienced would be no different than the existing window notwithstanding that it would be somewhat closer. Moreover, there is sufficient greenery to screen between the buildings to not give rise to harmful overlooking effects.

    With these matters in mind, the effect would not translate to harm to the living conditions of the occupiers of Nos 125, 127 and 129. Resultantly, this part of the proposal would comply with Policies LP26 and LP30 of the LP which, amongst other things, seek to ensure that the living conditions of the occupiers of properties are protected.

  5. Section 06

    Conclusion and Recommendation

    The scheme would conflict with the development plan on the first main issue. The lack of harm on the second would not weigh in its favour. It would be neutral. I have been given no other compelling reason, taking into account other material considerations advanced, to recommend an outcome other than in accordance with the development plan. I therefore recommend that the appeal should be dismissed.

  6. Section 07

    Inspector’s Decision

    I have considered all the submitted evidence and my representative’s report and on that basis the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 1895No official casework-database value to compare
    Extracted decision date · page 1
    19 May 2026Matches the official casework database
    Extracted site visit dates
    21 April 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6006074
Application reference
2779/25
Lead case reference
Not recorded
Planning authority
London Borough of Redbridge
Planning authority code
E09000026

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Householder
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
454 m²
Number of residences
Not recorded
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
7 March 2026
Valid date
7 March 2026
Start date
16 March 2026
Planning authority decision date
23 December 2025
Appeal decision date
19 May 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office
Dataset status
Current release
Catalogue record ID
89040
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21