Skip to main content
Official casework recordAllowedCurrent release

Appeal 6006097

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

10 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

erection of up to two dwellings.

  1. Section 02

    Decision

    The appeal is allowed and permission in principle is granted for erection of residential development comprising a minimum of one dwelling and a maximum of two dwellings at [site address] , Ribchester [postcode] in accordance with the terms of the application reference 3/2026/0050, dated 22 January 2026.

  2. Section 03

    Preliminary Matters

    The application form was not completed with a full postal address. I have adopted an address which is an amalgamation of the description on the application form and the address on the Council’s Decision Notice, and which accurately describes the location of the appeal site. For completeness, I have also included the Easting and Northing co-ordinates in the banner above for clarity.

    The proposal is for Permission in Principle (PiP). Planning Practice Guidance (PPG) advises that this is an alternative way of obtaining planning permission for housing-led development. The PiP consent route has 2 stages: the first stage (or PiP stage) establishes whether a site is suitable in-principle, and the second ([name]) stage is when the detailed development proposals are assessed. This appeal relates to the first of these 2 stages.

    The scope of the considerations for PiP is limited to location, land use and the amount of development permitted1. All other matters are considered as part of a subsequent [name] application if PiP is granted. I have determined the appeal accordingly and treated any details related to a [name] as being illustrative only. There is no disagreement between the parties with regard to land use and amount of development and so my deliberations centre on whether the site is a suitable location for the proposed development.

  3. Section 04

    Main Issue

    Taking into account the above, the main issue is whether the site is a suitable location for the proposed development. 1 [name] in [name]: 012 [name]:58-[phone]

  4. Section 05

    Reasons

    The appeal site comprises an undeveloped parcel of land, broadly rectangular in shape and extending to approximately 0.19 hectares. It is located in Ribchester and fronts [address]. The site lies between existing residential properties along the road and is currently greenfield in nature. The topography of the site slopes gently downwards towards the main road. The land is bounded by vegetation along the frontage and north-western boundary, whilst the rear and south-eastern boundaries are more open. Access to the site is currently taken from the south-eastern boundary via an existing field gate.

  5. Section 06

    Suitable location

    The Council Officer’s Report refers to [name] DS1 of the Ribble Valley Core Strategy 2008 – 2028 (CS), adopted 16 December 2014 which sets out a development strategy for the Borough. The strategy directs the majority of new housing development to an identified strategic site and the principal settlements of Clitheroe, Longridge and Whalley. In addition, it states that development will be focused on Tier 1 Villages, which are the more sustainable of the defined settlements and states that new housing within and outside of the Borough’s Tier 2 village settlements will be more tightly controlled with such development being permissible where local needs housing or regeneration benefits can be delivered. The appeal site is adjacent the settlement boundary of Ribchester, which is identified as a Tier 2 Village.

    CS Policy DMG2 requires that, outside of defined settlement areas, development should meet at least one of several considerations. In addition, CS Policy DMH3 states that residential development within areas defined as open countryside is generally limited to specified types of development. In this case, the proposed development does not meet any of the listed considerations nor does it fall within the types of residential development typically supported for open countryside locations. As such, the proposal does not accord with the above policies. There is no evidence before me that would lead me to conclude differently.

    The Decision Notice refers to [name] DM12 and DMG3 of the Ribble Valley Core Strategy which seek to ensure that development is well related to the primary road network and can be accessed by sustainable modes of transport. These policies aim to promote development patterns which reduce reliance on private motor vehicles; in this respect there is disagreement between the parties regarding the suitability of the appeal site to access key services and facilities.

    From my site visit, I observed that the site is located on a primary route through Ribchester and it is well connected by footpaths to the centre of the village which is within a reasonable walking distance. Within the centre there are a range of services, including public houses serving food, a retail shop, a post office, cafes, places of worship, a village hall, and a primary school. In addition, there are recreational facilities including an outdoor playground, tennis courts, and football pitches, as well as a range of local businesses. Collectively, these facilities provide for a range of day-to-day needs and contribute positively to the overall accessibility of the site. 1 [name] in [name]: 012 [name]:58-[phone]

    I recognise that future occupants may need to travel further afield for employment, supermarkets and secondary schools, however, the site is located within close proximity of a bus stop providing an hourly service between 6am and 8.30pm. This offers a reasonable alternative to private car use, with journey time to Longridge which has a greater range of services, of approximately 8 minutes and onward connections to the wider area, such that future occupiers would not be wholly reliant on a private car.

    In addition, the presence of a designated cycle route running along the frontage of the site offers further opportunities for travel by modes other than the private car. This offers connectivity to the surrounding area, and its proximity is likely to encourage its use by future occupiers.

    Taking these factors together, future occupiers of the proposed development would not be wholly reliant on the private motor vehicle, and the site can therefore reasonably be regarded as being in an accessible location to local services by other modes of transport.

    Although the proposal conflicts with the spatial strategy set out in [name] DS1, DMG2 and DMH3, I find that the site is well related to the existing settlement and occupies an accessible location. As such, it would accord with the objectives of [name] DM12 and Policy DMG3 of the CS which among other things seek to ensure that development is safely and sustainably accessible, does not harm highway safety, and meets criteria relating to design, environmental protection and overall development quality.

  6. Section 07

    Other Matters

    The parties have drawn my attention to the appeal decision2 (The Chatburn Decision), where residential development outside a defined settlement boundary was allowed. My approach in this case is consistent with that decision. [name] is identified as a Tier 2 village, when its range of local services and public transport links are taken into account, I consider it to represent a suitable location for housing in principle.

    The appeal site is positioned within open countryside but between existing built development and as a result is visually and physically related to the established settlement pattern along [address]. Whilst it lies outside the formal settlement boundary, it does not form part of an isolated or particularly sensitive rural landscape and as such it is also a suitable location for development in this regard.

    I have had regard to the concerns raised by a neighbouring occupier in respect of the effect of the number of dwellings proposed on the character and appearance of the area, the living conditions of nearby residents and drainage. However, the application is made in the form of a PiP and the matter for consideration at this stage is whether the site is suitable for residential development of up to two dwellings. Whilst this establishes an upper limit, the precise form and layout of development, and the number of dwellings that would ultimately come forward within that parameter, would be determined at the technical details consent stage. Matters relating to parking provision for the dwellings, and any associated highway safety considerations, would also be assessed at that stage. Accordingly, whilst the indicative layout is a useful guide to how the site might be developed, it is not determinative. 2 APP/T2350/W/25/3372635

    I note that a public sewer crosses the site. However, this is a separate matter which can be addressed through engagement with the relevant statutory undertaker and considered at the technical details consent stage.

    The proposal would also generate temporary economic benefits during the construction phase, alongside a small degree of ongoing support for local services through additional household expenditure. Given the limited scale of the development, these benefits carry limited weight.

  7. Section 08

    Planning Balance

    The proposed development would conflict with the spatial strategy set out in CS Policy DS1, together with Policies DMG2 and DMH3, as it would introduce residential development outside the defined settlement boundary within a Tier 2 settlement. However, the degree of conflict with these policies is tempered by the particular characteristics of the appeal site. It is bounded by existing residential development and reads as part of the built frontage along [address]. As such, the proposal would not result in isolated or sporadic development in the countryside, nor would it undermine the overall spatial strategy to any great degree. Nevertheless, as the proposal would be in conflict with the spatial strategy of the CS, it would conflict with the development plan as a whole.

    The Council has not confirmed its current housing land supply position within the submitted evidence. However, having regard to the recent Chatburn appeal decision referenced by the appellant, issued in January 2026, it is understood that the Council’s supply was approximately 3.45 years at that time. Whilst it is acknowledged that this position may have changed in the intervening period, no updated evidence has been provided by the Council to demonstrate that a full five-year housing land supply can now be sustained. In the absence of such evidence, it is reasonable to conclude that the Council cannot demonstrate a five-year supply of deliverable housing sites.

    In these circumstances, the presumption in favour of sustainable development as set out in paragraph 11(d) of the Framework is engaged. As a result, the policies most important for determining the application, including those relating to the location and distribution of housing, are considered to be out-of-date.

    Against this backdrop, the provision of additional housing, even at the modest level of up to two dwellings, attracts significant weight. This is particularly the case given that the appeal site is reasonably accessible to a range of services and transport options, such that it can be considered a sustainable location in planning terms.

    In this context, I find that the adverse impacts of the proposal do not significantly and demonstrably outweigh the benefits when assessed against the Framework as a whole and planning permission should be granted.

  8. Section 09

    Conditions

    The PPG makes it clear that it is not possible for conditions to be attached to a grant of permission in principle. Therefore, whilst I acknowledge the conditions suggested by the Council, I have not imposed them. The terms of the application already include site location, type of development and amount, and the amount has been expressed as a range in the decision paragraph, as required by the PPG.

  9. Section 10

    Conclusion

    I find this is a case where there are material considerations that indicate that the appeal should be determined otherwise than in accordance with the development plan. For the reasons given above the appeal should be allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 6765No official casework-database value to compare
    Extracted decision date · page 1
    26 June 2026Matches the official casework database
    Extracted site visit dates
    12 May 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6006097
Application reference
3/2026/0050
Lead case reference
Not recorded
Planning authority
Ribble Valley Borough Council
Planning authority code
E07000124

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Minor Dwellings
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Planning Appeals - Outline
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
1,900 m²
Number of residences
2
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
9 March 2026
Valid date
9 March 2026
Start date
12 March 2026
Planning authority decision date
27 February 2026
Appeal decision date
26 June 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
91064
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29