Appeal 6006139
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
for the renovation of existing jetty and change of use from mooring of leisure craft boats to mooring of up to five residential houseboats.
Section 02
Decision
The appeal is dismissed.
Section 03
[name]
The first main issue is the effect of the proposal on the character and appearance of the riverside and the visual amenities of the area. The second main issue is the effect of the proposal on the living conditions of the occupiers of neighbouring properties with particular regard to noise and disturbance.
Section 04
Character and appearance
The appeal site is located along a stretch of [address] that is characterised by detached and semi-detached bungalows and two storey dwellings. It is an area where the [name] is flanked by a diverse range of commercial and residential developments. On the southern side of the river and a short distance to the west of the appeal site is a row of typically older houseboats. They are located immediately alongside Riverbank, where they are set back from the main route of the river.
Opposite the appeal site, on the north side of the river, is a row of modern houseboats. They occupy a recessed position between a boatyard and a commercial site and are seen against a large multi-storey modern commercial and residential development. To the front of these houseboats are several jetties that project into the river and which were used for the mooring of recreational boats at the time of the appeal site visit.
The appeal site occupies a ‘backland’ position to the rear of the gardens to three detached dwellings. There is a small parking/yard area immediately to the rear of two of the gardens and a long jetty beyond the parking area which projects into the river. There are similar projecting jetties on either side, as well as opposite the appeal site. Further to the east on both sides of the river are wharfs which accommodate a range of older commercial sites, a modern housing development and a small marina. These developments create a more formal edge to the river that is quite distinct from the area in which the appeal site is located.
Amongst other things policy 11 of the Adur Local Plan 2017 (ALP) seeks to protect the setting of the [name] and to support opportunities to improve public access to and along the river and open up views to it. New development adjacent to the river must respect its character and appearance. ALP Policy 15 expects proposals to respect and enhance the character of the site. They should make a positive contribution to the sense of space, local distinctiveness and character as well as the distinctiveness of the area.
With the proposal the existing jetty would be renovated and whilst few details regarding the proposed works are provided, this is a matter that could be satisfactorily dealt with by condition. The appellant has also indicated that the site would be tidied up and that stored materials would be removed. Again, this is a matter that could be dealt with by condition. Subject to such conditions, the renovation of the existing jetty and tidying up of the site would improve the quality and appearance of the appeal site, without compromising its modest character and appearance.
Unlike the existing houseboat moorings, the proposed houseboat moorings would be located on the outside of a slight bend and would project further into the river. As a consequence, the houseboats using the moorings would be highly prominent and would be seen as encroaching into the river. Due to their combined siting, size, design and appearance the houseboats would materially detract from the spacious and informal character of this part of the [name] when viewed from the river and the surrounding area, including [address] where it crosses the river. This harm would materially outweigh the benefits resulting from the renovation of the existing jetty.
For this reason, I conclude on the first main issue that the proposal would undermine and unacceptably harm the prevailing character and appearance of this stretch of the [name]. Accordingly, it would conflict with [name] 11 and 15.
Section 05
Living conditions
Together and amongst other things [name] 15 ad 34 seek to ensure that proposals do not have an unacceptable impact on the living conditions of the occupiers of adjacent properties. New development should be located in areas most suitable to the use proposed and should avoid risks from noise or light pollution.
Access to the appeal site is via a narrow track between the bungalow at [address] (No.31) and the two storey house at [address] (No.33). The dwelling at No.31 projects up to the edge of the access track and includes two clear glazed habitable room windows in its side elevation which abuts the track. The dwelling at No.[address] to the access track and there is a tall fence along the adjacent boundary with the track. There is a ground floor side widow in the wall facing the access track, although it is largely screened by the boundary fence. There is also a larger clear glazed window at first floor level which provides an outlook over the access track.
Currently the appeal site does not appear to be extensively used. This could change if the site and jetty were restored and fully used for the mooring of leisure crafts. This would be highly likely to increase current activity levels, with owners arriving and departing from the site when loading and unloading their boats. Having regard to the proximity of the dwellings and associated rear gardens at No.31 and No.33 to the access track, this would result in some noise and disturbance for the occupiers of those properties. However, as indicated in the council’s delegated report a previous planning permission restricts the use of the site access for purposes associated with the loading and unloading of boats.
Conversely, the houseboats that would use the proposed moorings would be occupied for extended periods day and night. Collectively they would generate numerous daily pedestrian or vehicular movements, including during the evenings, at night and early in the morning. This, together with the day-to-day on-site activities of the occupiers, would result in a material level of activity, noise and light pollution.
Having regard to the quiet and unlit nature of this river front site, such activities would unacceptably harm the living conditions of the occupiers of No.31and No.33 in particular and to a lesser extent No.35. The comings and goings along the access track would in particular be intrusive for the occupiers of No.31 and No.33. This is due to their close proximity to the access track and side facing windows. The occupies of the adjacent rooms would experience noise, disturbance, light pollution and loss of privacy.
I conclude on the second main issue that the proposal would unacceptably harm the living conditions of the occupiers of No.31, No.33 and No.35 for the reasons stated above. Accordingly, the proposal conflicts with [name] 25 and 34.
Section 06
Other matters
No parking or highway safety concerns have been raised by the council or the Highway Authority. [name] note the concerns raised by residents regarding pressure for on-street parking, having regard to the size and nature of the proposal, I am satisfied that the proposed parking area would be satisfactory to deal with the day-to-day needs of the occupiers of the proposed houseboats. From the information submitted and the comments set out in the council’s delegated report I am satisfied that drainage and flood risk could be adequately dealt with by
Section 07
conditions.
Paragraphs 11, 34, 124 and 125 of the National planning Policy Framework 2024 (the Framework), state a presumption in favour of sustainable forms of development, making full and effective use of land and set out the Government’s objective to significantly boost the supply of homes. The houseboats that would use the proposed moorings would potentially provide five homes in an accessible location. The proposal would also make full use of a site that is currently under-used. In these respects, the proposal accords with current planning policies which promote new housing in accessible locations and making full and effective use of previously developed land.
However, paragraph 131 of the Framework states that good design is a key aspect of sustainable development. Paragraph 135 of the Framework seeks to ensure that developments function well and add to the overall quality of the area. They should be sympathetic to local character and history, including the built environment and landscape setting and create places which promote health and well-being.
In this instance the harm that would be caused both to the character and appearance of the riverside and the living conditions of various local residents would clearly outweigh the benefits stated in paragraphs 7, 16 and 17 of this decision. Further, this harm is not a matter that could be satisfactorily dealt with by the imposition of conditions.
Section 08
Conclusion
Having regard to the conclusions on the main issues and all other matters raised, the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 1220No official casework-database value to compare
- Extracted decision date · page 1
- 24 June 2026Matches the official casework database
- Extracted site visit dates
- 11 June 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6006139
- Application reference
- AWDM/1195/24
- Lead case reference
- Not recorded
- Planning authority
- Adur District Council
- Planning authority code
- E07000223
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Change of use
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Planning Appeals - Full
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 1,051 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- No
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 9 March 2026
- Valid date
- 9 March 2026
- Start date
- 20 March 2026
- Planning authority decision date
- 1 October 2025
- Appeal decision date
- 24 June 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office-s78
- Dataset status
- Current release
- Catalogue record ID
- 90938
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 20 August 2026 at 16:29