Appeal 6006315

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

Installation of a small scale domestic 30 panel above ground solar PV array ([name]).

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    The decision notices cites conflict with Policy SP03 of the Babergh and Mid Suffolk Joint Local Plan (2023) (JLP) which relates to the location of new housing development. Given the nature of the proposed development, this policy has not been determinative.

    Since the determination of the application Natural England have updated their advice with regard to how the habitats found beneath solar panels are recorded within the biodiversity net gain metric. Consequently, the Council have confirmed that as grassland already exists on site beneath where the solar panels are proposed to be installed, the application is exempt from further biodiversity net gain requirements and withdraw their second reason for refusal which related to an absence of biodiversity net gain information.

  3. Section 04

    [name]

    The main issues in the appeal are: • the effect of the proposal on Great crested newts, and • the effect of the proposal on the living conditions of the occupiers with particular regard to noise.

  4. Section 05

    Great crested newts

    Policy LP25 of the JLP supports renewable energy proposals subject to, amongst other matters, that impacts on ecology have been fully taken into consideration and where appropriate, effectively mitigated.

    Great crested newts (GCN) are a [name] (EPS). GCN’s require both terrestrial and aquatic habitats, spending the majority of time within grassland, woodlands, scrub and hedgerows, migrating to ponds to breed.

    Under the provisions of the Conservation of Habitats and Species Regulations 2017 (as amended) (Habitat Regulations), I am required to consider whether any EPS, such as Great crested newts, would be affected by the proposed development and whether any measures would be effective in mitigating any harm.

    The Council’s ecologist advises that the site is within an ‘amber risk zone’ for GCN’s, a designation covering areas that comprise suitable habitats for this protected species. The ecologist also states that there are eight waterbodies within 500 metres of the proposed development, five within 250 metres, with the closest pond located approximately 75 metres away to the south east of the proposed development site and have advised a precautionary working method statement should be submitted.

    The appellant has submitted a GCN statement (no author, no date) with the appeal. It is not clear whether this has been completed by a suitably qualified ecologist. Notwithstanding this, the statement indicates that there are 4 ponds within the local area, although the distances of these ponds from the appeal site vary from those stated by the Council’s ecologist, 3 of them are listed as being within 250 metres and all within 500 metres of the appeal site. However, the statement appears to largely comprise of observational evidence from the appellant and a screenshot from MAGIC (an online mapping portal), which suggests that there are no GCN’s present. The submitted information does not appear to comprise of an ecological survey of the site and, furthermore, the information from MAGIC appears to only reference pond surveys from some years ago, between the period of 2017 to 2019. The appellant considers that because they consider GCN’s to be absent, a precautionary working method statement is unnecessary.

    Standing advice from Natural England for GCNs, outlines several criteria for when it is appropriate to seek a survey for GCN’s. One criterion is where there is a suitable water body such as a pond or ditch within 500 metres of the development, even if it only holds water for some of the year.

    Circular 06/20051 states that it is essential that the presence or otherwise of protected species, and the extent that they may be affected by development, is established before planning permission is granted, otherwise all relevant material considerations may not have been addressed in making the decision. A planning condition would therefore not be appropriate.

    Given the presence of waterbodies within close proximity to the site and in the absence of a recent site specific GCN survey, undertaken by a suitably qualified ecologist, I cannot be satisfied that GCN’s are not present in the area. I am therefore unable to make an informed decision about the effect of the proposal on the protected species, and in the absence of a precautionary working method statement I am also unable to assess whether any mitigation measures would adequately safeguard against any harm. 1 Circular 06/2005: Biodiversity and Geological Conservation

    Consequently, on this issue, I am not satisfied that sufficient evidence has been submitted to demonstrate that the proposal would have an acceptable effect on ecology with regard to GCN’s. The proposal would therefore conflict with Policy LP25 of the JLP as it has not been sufficiently demonstrated that the proposal would not have an adverse effect on ecology. It would also conflict with the Habitat Regulations.

  5. Section 06

    Living conditions

    Policy LP25 of the JLP supports renewable energy proposals subject to, amongst other matters, the impacts on residential amenity having been fully taken into consideration and where appropriate, effectively mitigated.

    The Council raised concerns that limited information was submitted with regard to the location of the inverters and associated plant equipment and that potential noise emanating from these could cause disturbance to the living conditions of nearby residents.

    As part of the appeal the appellant has stated that the invertors and associated plant would be located within the red line boundary where the solar panels would be located. I have no reason to doubt this. The appellant has also submitted information on the type of inverter unit and battery storage that would be installed, included anticipated levels of noise being less than 30decibals.

    The solar panels would be located in the field adjacent to [site address] and would be a substantial distance away from the property and any other residential property. Given the anticipated levels of noise from the equipment and separation distance from the nearest dwelling, the proposal would not result in any harm to the occupiers living conditions with regard to noise. [name] have been minded to allow the appeal, I am satisfied that a suitably worded condition would secure the technical details and location of the plant equipment. I also note that the [name] raised no objection, subject to the invertor being installed as described by the appellant, including the stated decibel level.

    Given the above, the proposal would not have an adverse effect on the living conditions of the occupiers with particular regard to noise. The proposal would therefore accord with Policy LP25 of the JLP in so far as relevant to this main issue.

  6. Section 07

    Planning Balance and Conclusion

    Section 38(6) of the Planning and Compulsory Purchase Act 2004 sets out that planning decisions must be made in accordance with the development plan unless material considerations indicate otherwise.

    The proposal would make a positive contribution towards renewable energy generation and the National Planning Policy Framework (the Framework) directs me to give significant weight to the benefits arising from this. However, the Framework also advises that planning permission should be refused if significant harm to biodiversity resulting from a development cannot be avoided or adequately mitigated.

    For reasons previously stated, insufficient information has been submitted with regards to GCN’s. I cannot therefore be sure that significant harm would not arise to this EPS. I am thus also unable to discharge my duty under the Habitats Regulations. Consequently, notwithstanding the benefits, I must dismiss the appeal.

    I conclude that the proposal conflicts with the development plan and the material considerations do not indicate that the appeal should be decided other than in accordance with it. The appeal is therefore dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 5200No official casework-database value to compare
    Extracted decision date · page 1
    16 June 2026Matches the official casework database
    Extracted site visit dates
    10 June 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6006315
Application reference
DC/25/03941
Lead case reference
Not recorded
Planning authority
Mid Suffolk District Council
Planning authority code
E07000203

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Planning Appeals - Full
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
60 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
11 March 2026
Valid date
11 March 2026
Start date
20 March 2026
Planning authority decision date
29 October 2025
Appeal decision date
16 June 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
90484
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29