Appeal 6006564
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described on the application form as “the conversion of four existing agricultural buildings as detailed on the attached drawings, including the removal of lean to additions; the existing access to the site is to be retained as an emergency access with a main access utilising the existing field access which provides improved visibility for the new dwellings”.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
Schedule 2, Part 3, Class Q of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (GPDO) provides for the change of use of either (i) a building that is part of an established agricultural unit and land within that building’s curtilage, or (ii) a former agricultural building that was (but is no longer part) of an established agricultural unit and any land within that building’s curtilage, to a use falling within Class C3 (dwellinghouse) of the Use Classes Order 1987 (as amended), together with the extension of the building, or and any building operations reasonably necessary to convert the building to such use or to extend that building.
Schedule 2, Part 3, [name](3) of the GPDO states that a local planning authority may refuse an application where the proposed development does not comply with any specified conditions, limitations or restrictions. Paragraph Q1 states that development is not permitted by Class Q if one or more criteria apply. This includes Q1(p) where the building does not have suitable existing access to a public highway. It was on this basis that the Council refused the application.
Section 04
Main Issue
The main issue is whether the development would be permitted by Paragraph Q1 of Class Q, Part 3, Schedule 2 of the GPDO.
Section 05
Reasons
The appeal site contains four barns at [site address] that are currently used for the stabling of horses as a livery business. The barns are mostly steel framed with corrugated roofs and metal / timber cladding, although one is brick with a timber frame. The current access into the site is via a driveway in the northern corner.
The road past the site is a minor country lane that connects the village of Palterton to junction 29 of the M1. There is no speed limit or street lighting, and heavy goods vehicles are restricted. At the time of my late morning site visit, there was a regular flow of traffic past the site. Although this is only a snapshot, it is clear that the road is used by through traffic to access the M1 and beyond.
There is a sharp bend just beyond the northern corner of the site, which greatly restricts visibility to the north for vehicles looking to exit the site from the current access. This presents a considerable collision and highway safety risk and the local highway authority has raised objections. Even if the levels of traffic generated by the proposal are comparable to the site’s current levels, it is apparent that the existing access is not safe. Therefore, the buildings proposed for conversion would not have a suitable existing access to the public highway via this route.
The proposed site layout plan shows an alternative access along the southern boundary of the site. There is an existing gate into the adjoining field from a straighter stretch of the road. Notwithstanding sales particulars from 2018, when the application was submitted and determined in 2025 there was no route from this access through to the site, only the field and boundary fencing. There is little recent evidence to show that this access was being used by large vehicles and machinery to reach the site. Moreover, any previous hardsurfacing had largely disappeared long ago based on aerial photographs.
In the first half of 2026, construction of a carriageway from the site to this access was commenced. However, this has been subject to enforcement action and works have ceased, with a retrospective planning application submitted for its retention. The carriageway has not been fully surfaced and does not appear to fully reflect the route shown on the site layout plan. It is also evident that planning permission has yet to be granted for the carriageway and the works have yet to be fully implemented, even if the local highway authority has raised no objections to the retrospective application. Thus, the alternative access does not provide a suitable existing access to a public highway for the buildings.
The appellant’s suggestions to turn the existing access into an emergency access only, to have a one-way system from the existing access to the alternative access, or to close the existing access completely, do not resolve the current lack of a suitable existing access to a public highway. In conclusion, the proposal would not comply with the requirements set out in Schedule 2, Part 3, Class Q, Paragraph Q1(p) of the GPDO and so would not constitute permitted development.
The Council has noted that it is unclear if some of the buildings meet the maximum floor space permitted under paragraph Q1(c) due to difficulties in scaling from the plans. Given my findings on paragraph Q1(p) I have not addressed this matter. Additionally, as the proposal would not be permitted development, it has been unnecessary to consider any prior approval matters under paragraph Q2.
Section 06
Conclusion
For the above reasons, I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 521No official casework-database value to compare
- Extracted decision date · page 1
- 23 June 2026Matches the official casework database
- Extracted site visit dates
- 17 June 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6006564
- Application reference
- 25/00398/A2DDET
- Lead case reference
- Not recorded
- Planning authority
- Bolsover District Council
- Planning authority code
- E07000033
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Change of use
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Planning Appeals - Full
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 5,000 m²
- Number of residences
- 4
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- No
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 17 March 2026
- Valid date
- 17 March 2026
- Start date
- 30 March 2026
- Planning authority decision date
- 18 December 2025
- Appeal decision date
- 23 June 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office-s78
- Dataset status
- Current release
- Catalogue record ID
- 90872
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 20 August 2026 at 16:29