Skip to main content
Official casework recordAllowedCurrent release

Appeal 6006620

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a two storey side extension to form additional living accommodation.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for a two-storey side extension at [site address] , Bridgeyate, [name] [postcode] in accordance with the terms of the application, Ref P25/02788/HH, subject to the following conditions:

    The development hereby permitted shall begin not later than three years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with drawing nos: 0100; 0110; 0200; 0201; 0202; and 0300.

    The external materials of the extension hereby permitted shall match those used in the existing dwelling.

  2. Section 03

    Main Issue

    The main issue is whether the proposal would be inappropriate development in the Green Belt having regard to the National Planning Policy Framework (the Framework) and any relevant development plan policies;

  3. Section 04

    Reasons

    The host dwelling is a detached 2-storey house within a row of other properties that extend along one side of [address]. To the rear of the properties are open fields and on the opposite side of the road are commercial premises behind a reasonably wide tree lined boundary. The appeal site is located within the Bristol and Bath Green Belt beyond any designated settlement boundary.

    The proposal would replace the existing single storey conservatory with a 2-storey extension.

    Paragraph 154 of the Framework states that development is inappropriate in the Green Belt unless it falls within 8 exceptions. The Council has found the proposal to be disproportionate to the host dwelling and paragraph 154 c) of the Framework requires that the extension or alteration of a building does not result in disproportionate additions over and above the size of the original building.

    Gloucestershire Local Plan: Policies, Sites and Places Plan (LP) Policy PSP7 refers directly to the Framework. [name] 3 of that policy concerned with what is a proportionate addition to a building. It states that in general a volume increase of up to 30% would likely be proportionate, and an increase exceeding 50% is likely to be considered disproportionate.

    Although the Framework does not provide a definition of ‘disproportionate additions’ the percentages set out in LP Policy PSP7 would be a reasonable starting point. Nevertheless, the use of the word ‘likely’ within the policy and its requirement for careful assessment of scale and proportion if the volume increase falls between 30% and 50%, confirms that planning judgement should still be used.

    The Council has calculated that the proposal would constitute an overall increase in volume of 44% but when combined with the volume of previous extensions this would increase to 65%. The appellant has not commented on these figures though has identified that the percentage change in building footprint would be smaller.

    However, the proposal would be modest in size and largely within the footprint of the existing conservatory. It would be set back from the front elevation of the host dwelling and would not extend beyond the rear elevation. The proposed first floor would be setback from the ground floor, and the overall height would be lower than the existing ridge of the host dwelling. This would mean the proposal would be visually subservient to the host dwelling and not overwhelm it. It would add additional volume, but this would be largely contained within the existing built envelope of the property and would not significantly add to the overall scale.

    Consequently, the proposal, although potentially exceeding the 50% outlined in LP Policy PSP7, would not overwhelm the host dwelling in terms of massing due to the subservient form and modest size of that proposed and would retain this property’s overall scale. Thus, in this specific instance, it is not found that the proposed extension would result in a disproportionate addition over and above the size of the original building. The proposal would therefore comply with Paragraph 154 c) of the Framework and would not cause the harm LP Policy PSP7 seeks to prevent.

    As the proposal would not be inappropriate development, it is not necessary to further consider the effect of the proposal on openness or the purposes of including land in the Green Belt, nor is it necessary to consider very special circumstances.

  4. Section 05

    Other Matters

    The Council has not found harm in relation to design, character and appearance, living conditions, highway safety, parking, and a nearby non-designated heritage asset. There is nothing before me to conclude otherwise.

    The appellant has highlighted 3 appeals1, it is not found they relate to this case as they 1 was not in the Green Belt, 1 was assessed under a different part of Framework Paragraph 154 and there were very special circumstances in the third. 1 APP/P0119/W/23/3323465, APP/P0119/W/25/3363032, and APP/P0119/D/25/3374214

  5. Section 06

    Conditions

    The main parties have not suggested any specific conditions so in addition to securing commencement within the relevant statutory timeframe, I have also imposed conditions requiring adherence to the approved plans and that matching materials should be used to ensure the proposal integrates acceptably within the character and appearance of the host dwelling.

  6. Section 07

    Conclusion

    For the reasons given above the appeal scheme would comply with the development plan when read as a whole and there are no sufficiently weighted material considerations, including the Framework, which would indicate a decision otherwise. The appeal is, therefore, allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 2199No official casework-database value to compare
    Extracted decision date · page 1
    25 June 2026Matches the official casework database
    Extracted site visit dates
    17 June 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6006620
Application reference
P25/02788/HH
Lead case reference
Not recorded
Planning authority
South Gloucestershire Council
Planning authority code
E06000025

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Householder
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
400 m²
Number of residences
Not recorded
Site in Green Belt
Yes
Agricultural holding
Not recorded
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
18 March 2026
Valid date
18 March 2026
Start date
27 March 2026
Planning authority decision date
30 January 2026
Appeal decision date
25 June 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office
Dataset status
Current release
Catalogue record ID
91000
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21