Skip to main content
Official casework recordDismissedCurrent release

Appeal 6006628

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a two storey rear infill extension, single storey front extension, garage conversion, raising ridge height to incorporate a new first floor and rendering of existing walls.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Main issue

    The main issue is the effect of the proposal on the character and appearance of the area.

  3. Section 04

    Reasons

    The appeal property lies distinctly within a row of quite modest bungalows on the edge of the village. The properties are visible in long views on the approach to the village above the level of the road, with their spacing and the surrounding open countryside contributing to an impression of rurality. The roof forms at the nearby bungalows vary to some degree but there is a common feature of hipped and pitched roofs, generally of quite a low height and restricted building mass at upper levels of the bungalows.

    There are properties further from the appeal site with higher and larger roofs which, along with the decisions permitting them provided referred to by the appellant, I have considered and viewed at my visit. They are discernible from the appeal property by virtue of their location, respective positions in relation to other buildings, and intervening gaps, so are consequently seen within their established landscape features. They are not viewed in the closer visual context of the appeal property, which is part of a distinctive established modest row and has a character and appearance reflecting this.

    The proposed works would infill an existing courtyard area with a new roof form across the bungalow. This roof would be higher than the existing double ridge height at both the front and rear of the property. A new crown roof form would be created with gables to the side elevations, which would run the depth of the extended property.

    The increased height, depth, extent, form and markedly increased massing and volume of this new roof would be notably at odds with the modest form and appearance of the existing bungalow. Notwithstanding it being a detached property, and the gaps between neighbouring bungalows, the larger roof would be a prominent feature that would contrast with the pattern of development established by the host property and the modest forms and features of the neighbouring bungalows either side of it.

    This somewhat dominant and incongruent roof design would be seen from the front of the building, and particularly in side views of the deep roof; views that would be notable and intrusive in the longer vistas towards the site and area when approaching the village. The design of other properties in the wider area, and aspects such as proposed rendering, materials and coherency of the elevations, would not outweigh or mitigate this harm. Thus the appeal scheme as a whole would not represent an overall enhancement.

    I note the findings of an Inspector for what appellant suggests is a decision letter relating to similar circumstances as the appeal scheme before me. However, I do not have the full plans, details and evidence that was before that Inspector, and moreover, each appeal scheme should be considered on its own merits, impacts and visual context. [name] concluded views of that development were limited to within very close proximity, which is not the case for the appeal scheme before me. I attribute that decision limited weight and it does not persuade this appeal scheme, in its specific visual context, should be allowed

    The National Planning Policy Framework seeks to achieve well-designed places, and requires developments to be sympathetic to local character. Policy DM9 of the Epping Forest District Local Plan (2023) requires all new development to achieve a high quality of design and contribute to the distinctive character of the local area and says that development proposals must, amongst other matters, relate positively to their locality, having regard to building heights, and the form, scale and massing around the site. The proposed development would be harmful to the character and appearance of the area and would be conflict with the aspects of Policy DM9 and the Framework I have set out above.

  4. Section 05

    Other matters

    The appeal property lies within the Green Belt. Both the Council and the appellant agree the proposal is not inappropriate development as it would fall within the exception in Framework paragraph 154c) and Policy DM4 of the Local Plan, as an extension or alteration that does not result in disproportionate additions over and above the size of the original building. I understand no previous planning history exists for the appeal property, and the Council finds the proposal constitutes proportionate additions to the size of the original building. Based on the evidence before me regarding what constitutes the original building, I see no reason to disagree that the scale, footprint and siting of the proposal meet the stated exception. This is a neutral matter in the balance.

  5. Section 06

    Planning balance and conclusion

    The appellant refers to benefits of the appeal scheme such as meeting modern living requirements, enhancing functionality, more efficient use of land, possible energy efficiency savings, and a benefit to the local community. There would also be some economic benefits such as from its construction and possibly some small on-going support to local services. However, these are limited benefits that attributed limited weight. [name] to agree the scheme is compliant with policies such as in respect of matters such as the living conditions of neighbouring occupiers and highway matters these would be neutral matters in the balance. Compliance with Green Belt policies is also a neutral matter that does not weigh in favour of the scheme. Overall, the benefits and matters of policy compliance do not outweigh the harm from the appeal scheme, which attracts the greater weight.

    The proposal conflicts with the development plan read as a whole and the Framework read as a whole. There are no material considerations, including the policies of the Framework, which indicate the decision should be made other than in accordance with the development plan. Therefore, for the reasons given, the appeal should not succeed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 97No official casework-database value to compare
    Extracted decision date · page 1
    15 June 2026Matches the official casework database
    Extracted site visit dates
    19 May 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6006628
Application reference
EPF/1935/25
Lead case reference
Not recorded
Planning authority
Epping Forest District Council
Planning authority code
E07000072

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Householder
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
525 m²
Number of residences
Not recorded
Site in Green Belt
Yes
Agricultural holding
Not recorded
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
18 March 2026
Valid date
18 March 2026
Start date
23 March 2026
Planning authority decision date
22 January 2026
Appeal decision date
15 June 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office
Dataset status
Current release
Catalogue record ID
90427
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21