Skip to main content
Official casework recordDismissedCurrent release

Appeal 6006788

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

removal of an existing [name], and the deployment of a replacement [name] 3 unit.

  1. Section 02

    Decisions

    Appeal A is dismissed.

    Appeal B is dismissed.

  2. Section 03

    Preliminary Matters

    There are 2 appeals concerning refused applications for planning permission and advertisement consent for a smart hub with integrated advertisement screens. Although the appeals are determined under separate legislation, they are intrinsically linked. Therefore, for the sake of expediency, and to avoid duplication, I have dealt with both appeals in the same decision letter.

    In respect of Appeal A, the Town and Country Planning (Control of Advertisements) (England) Regulations 2007 (the Regulations) require that advertisement appeal decisions are made only in the interests of amenity and public safety, taking account of any material factors. The National Planning Policy Framework (the Framework) and the Planning Practice Guidance (PPG) confirm this approach. The development plan policies referred to by the Council in the decision notice for Appeal A are therefore not determinative with regards to the advertisement, but I have taken them into account as a material consideration where they are relevant. Appeal Decisions 6006788 & 6006790

  3. Section 04

    [name]

    The main issues are as follows: • The effects of the proposals in both appeals on the character and appearance/amenity of the area with particular regard to the Hammersmith Broadway Conservation Area (CA). • The effects of the proposals on public safety and pedestrian mobility.

  4. Section 05

    Character and Appearance/Amenity

    The appeal site is located on the footpath outside the entrance to the adjacent shopping centre and tube station. It currently includes an existing street hub which would be removed to make way for the proposed unit with integrated advertising screens. The proposed unit would be marginally taller with a larger footprint but most significantly would be wider and have larger display screens than the existing. The footpath at present includes other street furniture such as advertising totems, refuse bins, cycle racks and streetlights.

    The site is also within the CA. I have therefore had regard to Section 72(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990 (the Act) which states that with respect to any buildings or other land in a conservation area special attention shall be paid to the desirability of preserving or enhancing the character or appearance of that area.

    There is nothing before me to establish the significance of the CA as required by paragraph 207 of the Framework. From all that I have seen and read, this is derived in part from the high quality of its imposing buildings of varying architectural styles and materials which is also telling of the development of the area over the years. Today, the area is commercial in character, but it has retained much of its architectural integrity above street level, such as ornate detailing and traditional sash windows upon former civic and governmental buildings.

    In the context of the area, the additional width of the hub over that existing would be relatively minor in its impact given the large scale of buildings, size of the footpath upon which it would sit and other street furniture adjacent. Its black colour would be somewhat stark giving it a more solid appearance overall, as the silver colour of the existing unit matches with other elements in the street scene and has a tapered bottom. On balance however, I do not consider the replacement hub to be harmful in its size or design set against the baseline situation.

    With regards to the advertisement screens, while they are significantly larger than the existing, I observed larger advertisement displays in the area, including above the entrance to the shopping centre/tube station, and in shop and café windows. In many views of the screens from various locations in the area, these would be seen against the backdrop of existing displays without appearing overwhelming or harmful.

    Taken together, in the context of the location I do not find that the proposed street hub and advertisement displays would harm the character and appearance/amenity of the area, nor harm the significance of the CA. Appeal Decisions 6006788 & 6006790

    This would accord with section 72(1) of the Act and policies DC1, DC9 and DC10 of the Hammersmith and Fulham Local Plan (adopted February 2018) (HFLP). Among other things, these seek to ensure that the siting and design of telecommunications apparatus should minimise impacts upon the character and appearance of the surrounding area while advertisements which are excessive or obtrusive and adversely affect the character and appearances of the neighbourhood will be resisted.

  5. Section 06

    Highway and [name] and Mobility

    On my site visit, I observed the local area to be extremely busy with pedestrian footfall and vehicular traffic. The environment was chaotic even in the mid-afternoon hour, outside of traditional rush-hour periods.

    With regards to pedestrian mobility, guidance in the Council’s Planning Guidance Supplementary Planning Document (SPD) (February 2018) advises that a width of 3.5 metres (m) should be retained in town centre locations in order to avoid impeding pedestrian mobility. Even with the addition of around 0.3m width over the existing unit, a distance of 5.4m would be retained. This would be well in excess of the advised, while I observed that the majority of street furniture was concentrated towards the road. The appeal site is in close proximity and as such, I see no reason why the proposal would impede the convenient flow of pedestrians as a result of its installation given it would leave ample clearance.

    However, I also observed that due to the orientation of the street hub at present, the advertisement screen would be positioned directly behind traffic lights for motorists approaching the pedestrian controlled crossing from the south. This road was extremely busy at the time I was in the area and at 3 lanes wide, near the confluence of several other roads, and adjacent the entrance to a busy underground station, I saw several near misses between motorists and pedestrians as well as other motorists.

    While the images displayed would not move, and luminance is in line with industry standards which could be controlled by conditions, I share the concerns of the Council that this would serve as a dangerous distraction for drivers approaching the crossing in a hectic environment which requires absolute attention on safety. Regardless of the prevalence of hubs and adverts across the country, the position of the display screens in this case could confuse drivers when backdropped against the traffic lights and as such, it would be a danger to public safety. Regardless of the Council’s assessment of another application which it approved1, I am not beholden to this, and I have assessed the scheme before me on its own merits.

    Insofar as they are relevant to matters of public safety, this would conflict with policies T1, T3 and DC9 of the HFLP and T1, T2 and D5 of the London Plan (March 2021) (TLP). These seek, among other things, to ensure safe environments for cyclist and pedestrians.

  6. Section 07

    Other Matters

    The Council references two listed buildings in its assessment of character and appearance/amenity. These are The George Public House2 and The Swan Public 1 2021/03489/FUL 2 [name]: 1358573 Appeal Decisions 6006788 & 6006790 House3, both of which are grade II listed. The Council did not find harm to the setting of either listed building and, given my conclusion that the proposal would not be harmful to the character and appearance/ amenity of the area, I see no reason to disagree.

    I am informed of the benefits of the street hubs and advertising’s role in funding these benefits. This includes free public wi-fi, free UK calls, device charging, wayfinding assistance and an emergency services button are continued within the immediate area. The Framework includes a full section on supporting high quality communications networks, and that decisions should support the expansion of these networks. I don’t doubt the support in principle for development of this type.

    I agree that any impacts of the replacement unit must be considered against the existing scenario. This would mean assessing the slightly larger size of the unit and larger screens rather than a completely new feature in the area. I have assessed the proposal on this basis. On that basis, the benefits must be treated with the same approach. The existing unit appeared to be functional on my site visit and evidently hosts a number of phone calls and wi-fi connections as the appellant points out. I understand that technology may require an upgrade, but there is nothing before me to indicate that it is incapable of these functions anymore. Moreover, there were other street hubs in the area that I also observed.

    [name] acknowledge that there would be some benefits to upgrading the unit, and that advertisement revenue is crucial to ensure these services are free, to my mind the benefits over the existing would therefore be marginal based on the evidence before me and these would not outweigh the considerable weight I attach to the potential risk and harm to public safety that I have identified. Regardless of the Council’s record of refusing applications of this type, I have assessed the proposals on their own merits.

  7. Section 08

    Conclusion

    For the reasons given above, both appeals would be contrary to the development plan, albeit in the case of Appeal A this would not be determinative. However, given the harm I have identified, and taking into account the benefits which would not outweigh these matters, I conclude that both appeals should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 550No official casework-database value to compare
    Extracted decision date · page 1
    22 May 2026Matches the official casework database
    Extracted site visit dates
    27 April 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6006788
Application reference
2025/00584/ADV
Lead case reference
Not recorded
Planning authority
London Borough of Hammersmith and Fulham
Planning authority code
E09000013

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Commercial Appeals Service (Adverts)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
No Application Type Assocaited
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
Not recorded
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
20 March 2026
Valid date
20 March 2026
Start date
27 March 2026
Planning authority decision date
12 February 2026
Appeal decision date
22 May 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office
Dataset status
Current release
Catalogue record ID
89270
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29