Skip to main content
Official casework recordDismissedCurrent release

Appeal 6006820

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the construction of part one/two storey side extension and front porch, roof alterations comprising two dormers to front and extended dormer to rear, rooflights to front and back and relocation of existing solar panels, elevational alterations including glazed façade to side and replacement of cladding.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Procedural Matter

    The banner heading above uses the description that was given on the Council’s decision notice and which was repeated by the appellant on the appeal form. This accurately describes the proposal and gives a clarified version of the description that was originally given on the application form.

  3. Section 04

    Main Issue

    The main issue is the effect of the proposal upon the character and appearance of the area.

  4. Section 05

    Reasons

    The appeal relates to a detached dwelling with first-floor accommodation contained within its roof space. The property has a distinctively steep, dual-pitched roof with low eaves to ground-floor level and with a forward facing, full height gabled entrance feature incorporating a first-floor window in its apex, as is also the case to both end gables. There is a small, flat roof dormer to the rear elevation. The dwelling occupies a large rectangular corner plot adjacent to the junction where [address] is bisected by [address] and sits within the Park Langley Area of Special Residential Character (ASRC), described by the Council as an identifiable and coherent area comprising almost exclusively of large detached two-storey family houses on generous plots. Notwithstanding, I observed that properties within the area are mostly individually styled with no particular sense of uniformity to their architectural composition.

    The orientation and layout of No 111 is atypical for the area. Plots generally within the ASRC are rectangular, with more narrow frontages, deep and spacious rear gardens, and with limited space between neighbouring houses. In contrast, due to the configuration of the plot and the orientation of the dwelling, the appeal property’s principal private garden space is to the side, where there is a large gap between the dwelling’s north-west facing side elevation and [address]. The south-east facing side gable aligns with the forward building line of neighbouring properties along [address], where the appeal property follows the more conventional local development pattern by its setting close to the boundary with [address]. As a consequence, whilst spacious in its setting when seen from [address], No 111 has extremely limited space to the rear and no rear garden to speak of.

    The proposal involves a number of clearly self-identifiable elements which include a full height side extension to the north-west side of the dwelling in lieu of an existing, subservient single-storey element; two dormer windows to the front elevation facing [address] to either side of the gabled feature; enlargement of the dormer window to the rear elevation facing [address]; and a new front entrance porch extension. The implementation of these works would involve the use of silicone render in place of existing white painted, timber cladding to the existing upper levels of the gables and to the rear dormer, with its use also included upon the proposed new dormers.

    I accept that front dormers are not common features within the ASRC, and that those that do exist locally are mostly modest in size. Those proposed at No 111 would be larger than others nearby but would not be excessively large nor disproportionate within the expanse of the existing roof slope. Furthermore, they would be gable fronted with roof pitches mirroring the existing front gable, they would be set in from the roof’s sides, up from the eaves and down from the ridge, and would be squarely aligned with the fenestration pattern below. These are all positive attributes. The use of white render is common in the area and would simply reflect the dwelling’s materials choice at its upper level. Although the dormers would be fairly prominent features within the street scene they would not, in my judgement, dominate the roofscape but would instead appear as well-considered and integrated parts of the dwelling’s remodelled form, which would remain to be seen as a unique piece of architecture and comfortable within its setting.

    The front porch would project just over 1m in front of the gable, across its full width, as a single-storey element with a tiled hipped roof over. It would remain set back from the front boundary by around 3m and, as a modest subservient addition, I am not persuaded that it would add any meaningful bulk or prominence to the dwelling’s already unique position and presence within the street scene, including when also viewed within the context of its overall remodelled form.

    The existing dormer window to the rear is very modest, measuring just over 3.2m wide and just 1.7m high. The proposal would extend its width noticeably to almost 9m. Nevertheless, its height would remain unchanged and it would continue to be set well away from the roof’s sides, up from the eaves and down from the ridge. Whilst it would be visible in oblique views from [address] through the gap with No 6, it would remain as a reasonably modest addition within the vast expanse of the rear roof slope, which would retain its original profile. I do not share the Council’s view that the use of render to its façade and cheeks would intensify its presence to any degree that would be visually harmful. The glazing proposed would all be obscure. [name] been minded to allow the appeal, this could have been controlled by condition to ensure that the living conditions at No 6 would be safeguarded.

    The new side extension would simply project the form of the existing dwelling sideways by a distance of 3m. The enlarged building would retain its already horizontal proportions and would remain comfortable in its plot, with ample side garden space and separation with [address]. I share the Council’s view that the scale and general form of this component of the works would appear as a fully integrated and appropriate part of the dwelling overall. However, its flank elevation would be fully glazed. This would face towards, and provide outlook over, the property’s private side garden. Notwithstanding any form of reasonable boundary enclosure, a significant proportion of this side gable would be clearly visible within the street scene when looking south on the approach along [address].

    I share the Council’s concern that this detailing would introduce an overtly contemporary feature. The glazed gable would clash with the more traditional styling of the existing dwelling and would significantly erode the important role this plays in maintaining a balance between the unique qualities of No 111 and the wider established character of the ASRC. The contrast between traditional and contemporary styling would be stark and would be particularly so during hours of darkness when light could readily spill from inside the building in a dominant and intrusive manner without any reasonable means of control, and which would be readily perceived from beyond the confines of the appeal site.

    I am mindful that the appellant has acknowledged the potential for this part of the proposal to impact upon the character of the area, and as part of the appeal submissions has offered to amend the gabled elevation to reflect the architectural language of the original dwelling. However, this would substantially change the nature of the proposal that is before me. As such, it would not be appropriate to secure any such amendments by way of condition. The appeal has therefore been considered on the basis of the original application plans.

    Notwithstanding my findings upon other elements of the proposal, I find overall that the part one/two storey side extension would appear incongruous and out of keeping with the more traditional character and appearance of the host dwelling and wider ASRC. In this regard there would be conflict with the aims and objectives of the Council’s Urban Design Guide Supplementary Planning Document, adopted July 2023, and the requirements of Policies 6, 37 and 44 of the Bromley Local Plan, January 2019, and Policy D4 of The London Plan 2021. Between them these seek to secure a quality of design, including for residential extensions, which respects the host dwelling and is compatible with the distinctive qualities of its surroundings.

  5. Section 06

    Other Matters

    I note comments made by some local interested parties relating to the removal of vegetation and the installation of new fencing around the perimeter of the site. However, these matters are unrelated to the original planning application and the subsequent appeal that is before me.

  6. Section 07

    Conclusion

    For the reasons given above, the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 286No official casework-database value to compare
    Extracted decision date · page 1
    30 April 2026Matches the official casework database
    Extracted site visit dates
    20 April 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6006820
Application reference
25/05217/HPA
Lead case reference
Not recorded
Planning authority
London Borough of Bromley
Planning authority code
E09000006

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Householder
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
684 m²
Number of residences
Not recorded
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
22 March 2026
Valid date
22 March 2026
Start date
27 March 2026
Planning authority decision date
6 March 2026
Appeal decision date
30 April 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office
Dataset status
Current release
Catalogue record ID
88125
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21