Official casework recordDismissedCurrent release

Appeal 6006829

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

5 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as ‘use of existing access from [address] to serve dwelling approved under 17/01274/FUL’.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Main Issue

    The main issue in this appeal is whether the proposal constitutes development under the Town and Country Planning Act 1990 (the Act).

  3. Section 04

    Reasons

    The appeal site shown by the red line boundaries on plans 0815/S/02 and 0815/P/02 comprises a driveway access from [address] and adjacent gravelled areas beside and in front of the residential property at [address]. These plans also show blue line boundaries for the site of a dwelling granted planning permission on appeal in 20191. The new house within the blue line area is now largely complete.

    The original permission for the new dwelling included access via [address] which relied on third party land. However, the appellants have been unable to secure necessary rights over this land and therefore the originally proposed access is not deliverable. It is proposed to use the existing established access from [address] which previously served garages for access to the new house. As this is under the appellants’ control, they consider that use of this access for the new dwelling would provide a realistic and deliverable alternative to [address].

    Section 55 of the Act outlines that development means the carrying out of building, engineering, mining or other operations in, on, over or under land, or the making of any material change in the use of any building or other land.

    Article 7 of the Town and Country Planning (Development Management Procedure) (England) Order 2015 (DMPO) requires an application for planning 1 Appeal Ref APP/P3610/W/19/3222948 and application ref 17/01274/FUL “the original permission/approved scheme” permission to be accompanied by a plan which identifies the land to which the application relates.

    The Planning Practice Guidance (PPG)2 states that the application site should be edged clearly with a red line on the location plan and it should include all land necessary to carry out the proposed development (e.g. land required for access to the site from a public highway, visibility splays, landscaping, car parking and open areas around buildings). It indicates that a blue line should be drawn around any other land owned by the applicant, close to or adjoining the application site.

    The proposal relates to an existing hardstanding and access. It does not comprise building or engineering operations, a material change in the use of the land or any other type of works included within the meaning of development in section 55 of the Act.

    Whilst the development description refers to the use of the access to serve the dwelling in the approved scheme, the red line boundary does not include the site covered by the original permission. Given the requirements of the DMPO and the guidance in the PPG, the proposal cannot be considered on the basis of providing access to the adjoining site as this would require the red line boundary to encompass both sites.

    There is reference to various cases considered by the Courts. However, the full judgments have not been provided and there is no substantive evidence that the Courts have accepted the principle that adjacent land could be used for access to a site with a different red line boundary.

    Therefore, I conclude that the proposal does not constitute development under the Act. An application to use the appeal site for access to the approved scheme would need to include both the appeal site and the site of the original permission within the red line boundary. Given my findings, it is not necessary for me to consider the merits of any other issues raised in this case.

  4. Section 05

    Conclusion

    For the reasons given above, I conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 4490No official casework-database value to compare
    Extracted decision date · page 1
    18 June 2026Matches the official casework database
    Extracted site visit dates
    16 June 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6006829
Application reference
25/01487/FUL
Lead case reference
Not recorded
Planning authority
Epsom and Ewell Borough Council
Planning authority code
E07000208

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Change of use
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Planning Appeals - Full
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
130 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
23 March 2026
Valid date
31 March 2026
Start date
31 March 2026
Planning authority decision date
10 February 2026
Appeal decision date
18 June 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
90634
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29