Appeal 6006963
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
conversion and extension of an existing dwelling to create usable second storey space, without complying with a condition attached to planning permission [name]/2021/00751, dated 14 May 2021.
Section 02
Decision
The appeal is allowed and planning permission is granted for conversion and extension of an existing dwelling to create usable second storey space at [site address] , Crosby [postcode] in accordance with the application [name]/2025/01624, without compliance with condition No. 2, previously imposed on planning permission [name]/2021/00751 dated 14 May 2021 and subject to the following conditions:
The development shall be carried out in accordance with the following approved plans and documents: • Drawing 110 REV 5 (Proposed Site, Block and Location Plan) • Drawing 112 REV 5 ([name]) • Drawing 113 REV 5 ([name])
The materials to be used in the construction of the external surfaces of the development must be of similar appearance to those used in the existing building.
Section 03
Preliminary Matters
The application form states that the development had commenced but was not yet complete. However, during my site visit, the extension subject to this appeal appeared to be fully constructed and broadly consistent with the submitted plans. I have therefore considered the appeal on a retrospective basis.
Section 73A of the Town and Country Planning Act 1990 relates to development already carried out, including development carried out without complying with a condition subject to which planning permission was granted, as is the case for this appeal. An approval of a S73A application effectively creates a new planning permission, with the extant approval remaining intact.
The appeal site is located within the Moor Park Conservation Area. Section 72(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990 requires special attention to be paid to preserving or enhancing the character or appearance of conservation areas. I have had due regard to this duty within my
Section 04
Main Issue
The main issue is the effect of the revised design upon the character and appearance of the Moor Park Conservation Area (CA).
Section 05
Reasons
The Moor Park Conservation Area Appraisal identifies the defining characteristics of the CA, noting strong evidence of [name] principles in its planning and layout. This is reflected in the informal, winding street pattern, broad grass verges without kerbs, and the abundance of trees and hedges, with buildings set well back within generous plots. Collectively, these features create a sense of openness. The Appraisal also highlights that buildings are predominantly individually designed or form part of small, coherent groups. Taken together, the significance of the CA is derived from its spacious layout, its verdant character, and the individuality of the properties within it.
When viewed from [address], No. 24 presents as a detached bungalow set well back from the highway and enclosed by trees and hedging. From public vantage points, it appears as an unassuming building due to its single-storey form, its set back position among larger two-storey properties and established boundary planting. As a result, the appeal property makes a neutral contribution to the significance of the CA overall.
The development under consideration comprises a two‐storey rear extension with a mansard‐style roof. Given that the host property is predominantly single‐storey, the increased height and massing mean that the extension cannot be regarded as subservient. However, its impact is mitigated by its position to the rear, where visibility is limited. [address] curves around the side of the appeal site, views of the extension are substantially screened by the dense, leafy boundary planting in this location. I am also mindful that, as these trees lie within the CA, they benefit from a degree of protection and are therefore likely to remain in place, continuing to restrict visibility.
Nevertheless, I recognise that the boundary planting will not provide the same level of screening throughout the year, particularly during the winter months when it is not in leaf. During these periods, a side-on view of the extension would be available, and its height and form would be more readily perceived. It is also relevant that the rear boundary of the appeal site adjoins The Tithebarn Retirement Home, from where the development, particularly when viewed from the car park area, would be more visible. However, these viewpoints are not among the most publicly accessible within the CA overall.
During my site visit, I observed that the CA contains a wide variety of architectural designs and roof forms, as noted in the Appraisal. While gabled and hipped roofs are the most prevalent, other forms, including mansard, flat, catslide and dome roofs, are also present alongside taller tower strictures. In most cases, these neighbouring properties are more visually prominent from within the CA than the appeal proposal. The appellant has provided several examples of mansard roofs within the CA. Although most of these are single-storey and therefore less visually pronounced than the appeal scheme, their presence, alongside other atypical roof forms such as catslide and dome roofs, contributes to an environment in which such variations in roof design and a change in the heights of one building are not unexpected.
Taking the above factors into account, I conclude that, on balance, the development preserves the significance of the CA. The limited degree of visibility, combined with the strong variation in architectural design and roof forms within the CA, means that the proposal does not undermine its character or appearance, where it is seen. The scheme therefore satisfies the requirements of the Planning (Listed Buildings and Conservation Areas) Act 1990, the National Planning Policy Framework, and does not conflict with Policies EQ2, NH9 and NH12 of the Sefton Local Plan 2017, which collectively seek development that responds positively to local character and distinctiveness and is sympathetic to established patterns of development within conservation areas.
Section 06
Other Matters
An interested party has suggested that the property could be subdivided into two residential units. However, this appeal, and the planning application from which it arises, relates solely to an amended design to a previously approved scheme. No permission has been sought for the subdivision of the property, and such a proposal would require a separate application.
Section 07
Conditions
A revised plans condition [1] has been included for the avoidance of doubt. The PPG makes clear that decision notices for the grant of planning permission under Section 73 should also restate the conditions imposed on earlier permissions that continue to have effect. I have therefore imposed a materials condition [2] to ensure that the appropriate materials are retained for the lifetime of the development. As the appeal has evidently commenced, I have omitted the time
Section 08
Conclusion
For the reasons given above, and having regard to all other matters raised, I conclude that the proposal would not be in conflict with the development plan. I therefore grant a new planning permission without the disputed condition, and a time condition which is no longer applicable, but with a revised condition which identifies the approved plans and a materials compliance condition.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 4No official casework-database value to compare
- Extracted decision date · page 1
- 4 June 2026Matches the official casework database
- Extracted site visit dates
- 2 June 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6006963
- Application reference
- DC/2025/01624
- Lead case reference
- Not recorded
- Planning authority
- Sefton Metropolitan Borough Council
- Planning authority code
- E08000014
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Removal or Variation of Conditions
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 2,164 m²
- Number of residences
- Not recorded
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 24 March 2026
- Valid date
- 26 March 2026
- Start date
- 26 March 2026
- Planning authority decision date
- 2 February 2026
- Appeal decision date
- 4 June 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office
- Dataset status
- Current release
- Catalogue record ID
- 89850
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21