Appeal 6006988
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
10 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
change of use from dwellinghouse (Use Class C3) to House in [name] (Use Class C4).
Section 02
Decision
The appeal is allowed and planning permission is granted for change of use from dwellinghouse (Use Class C3) to House in [name] (Use Class C4) at [site address] in accordance with the terms of the application, Ref 25/01448/FUL, subject to the conditions set out in the schedule to this decision.
Section 03
Applications for costs
An application for costs was made by the appellant against the Council. This is the subject of a separate decision.
Section 04
Preliminary Matters
I have used the description of development set out on the decision notice as this more accurately reflects the nature and scope of the proposal than the description provided on the application form.
Section 05
Main Issue
The main issue is whether the development would provide acceptable living conditions for the occupiers, having regard to the size, layout and functionality of the bedrooms and provision of communal space.
Section 06
Reasons
Policy H8 of the City of York Local Plan (2025) (YLP) requires that development for Houses in [name] (HMO) provides living accommodation of a high standard. The Council’s Supplementary Planning Document: Controlling the Concentration of HMOs (2014) (SPD) reinforces that the assessment should focus on whether a dwelling is capable of accommodating additional residents and whether acceptable living conditions would be secured in practice, having regard to the internal layout and environmental qualities.
The Council’s refusal is based on the contention that two of the four bedrooms would be small and constrained, resulting in cramped and confined living conditions, particularly when taken together with the communal space provision. The evidence indicates that the concerns relate specifically to Bedroom 1 and Bedroom 2, which in the appeal scheme measure approximately 7.25 sqm and 6.79 sqm respectively.
I have had regard to the Council’s detailed assessment, which identifies issues relating to room shape, door swing and circulation space, in addition to floor area. These are relevant considerations. However, the assessment must be considered in the wider context, including subsequent developments at the site. Of particular importance is the recent grant of planning permission under reference 26/00035/FUL for an amended scheme at the appeal site. That scheme retains the same use, the same number of occupants and a similar overall layout, while introducing internal alterations to increase the size of Bedrooms 1 and 2. Bedroom 1 is increased slightly to just above 7.5 sqm, and Bedroom 2 is enlarged more substantially to just above 10 sqm. The Council’s officer report for that scheme concludes that the previous reason for refusal has been addressed because all bedrooms now exceed 7.5 sqm, and that the development would therefore provide an acceptable standard of accommodation.
This attracts significant weight in my assessment. The approved scheme indicates that, in principle, the Council accepts that the property is capable of accommodating a four-person HMO, and that there are no inherent limitations in terms of overall space, communal provision or layout which would preclude such use. It also demonstrates that the identified harm was confined to the size and functionality of two bedrooms, rather than any wider deficiency.
Significantly, the approved scheme does not include any meaningful increase in communal accommodation. The kitchen/dining space remains essentially unchanged in size and arrangement. This indicates that the extent of communal space, or reliance upon bedrooms for day-to-day living, was not determinative in itself. Rather, the resolution of the refusal reason was achieved solely through the enlargement of the two smaller bedrooms.
In this respect, the difference between the refused and approved schemes is limited in overall planning terms. [name] 2 is enlarged more substantially, Bedroom 1 is increased only marginally. These changes do not fundamentally alter the overall arrangement of the accommodation, but instead reflect adjustments to the size and usability of individual rooms within an otherwise similar layout.
The Council’s reasoning for the approved scheme relies on achieving bedroom sizes of at least 7.5 sqm, drawing from the [name] (NDSS). However, neither Policy H8 nor the SPD prescribes a minimum bedroom size, and the Council’s officer report acknowledges that a smaller standard of 6.51 sqm is typically applied in the HMO context. Furthermore, the appeal decision referenced by the appellant1 confirms that the NDSS do not apply to HMOs and are not determinative.
Against that background, I find that the Council’s assessment in this case has effectively treated the 7.5 sqm NDSS figure as a decisive threshold. The approval of the amended scheme demonstrates the Council’s stance that once that threshold is exceeded, the accommodation is considered acceptable, notwithstanding that the communal space, overall layout and general arrangement 1 Appeal Ref: 6002556 remain largely similar. That approach sits uneasily with the policy framework, which does not prescribe a minimum bedroom size and instead requires a broader assessment of living conditions.
I accept that the two smallest bedrooms would offer more limited space and flexibility than those in the approved scheme. However, the evidence does not demonstrate that either room would be incapable of functioning as single bedrooms. Whilst the shortfall in floor area compared to the approved scheme is more pronounced in respect of Bedroom 2, its overall proportions and layout would still allow for the provision of essential furniture and circulation space. The shortfall in respect of Bedroom 1 is modest and, taken together, the identified limitations do not amount to a level of harm that would justify refusal.
Drawing these matters together, I find that the development would provide a satisfactory standard of living conditions for the occupiers. It therefore complies with Policy H8 of the YLP and with Policy D1 insofar as it relates to the provision of acceptable living conditions.
Section 07
Other Matters
I have noted the concerns raised by the [address] Planning Panel, including in relation to the loss of a family dwelling and the potential effects of additional HMOs in the area. However, the evidence before me indicates that the proposal would not result in an undue concentration of HMOs and would remain within the thresholds set out in Policy H8. Other matters raised, including parking arrangements and the absence of a planning history as a HMO do not indicate conflict with the development plan as a whole, nor do they outweigh my findings on the main issue. They therefore do not justify a different overall conclusion.
Section 08
Conditions
I have had regard to the conditions suggested by the Council and have assessed them against the tests set out in the National Planning Policy Framework and Planning Practice Guidance. Where necessary I have amended the wording in the interests of clarity and precision.
A condition specifying the approved plans is necessary to provide certainty. A condition requiring details of cycle storage to be submitted and approved prior to first occupation is necessary to ensure that adequate, secure and usable provision is made, and to promote sustainable modes of travel. A condition requiring adherence to the submitted Management Plan is necessary to ensure the appropriate operation of the development and to safeguard the living conditions of both future occupiers and neighbouring residents. Finally, a condition limiting the number of occupants to four is necessary to ensure that the level of occupation remains consistent with that assessed in this decision and to safeguard the living conditions of future occupiers and neighbouring residents.
Section 09
Conclusion
For the reasons given, the appeal should be allowed, subject to the specified conditions.
Section 10
SCHEDULE OF CONDITIONS
The development hereby permitted shall begin not later than three years from the date of this decision.
The development hereby permitted shall be carried out in accordance with drawings: Location Plan; Site Plan; Ground Floor Plan; First Floor Plan.
Prior to first occupation as a House in [name] (Use Class C4), secure and covered cycle storage shall be provided in accordance with details that shall first have been submitted to and approved in writing by the local planning authority. The approved cycle storage shall thereafter be retained for that purpose for the lifetime of the development.
The use hereby permitted shall operate in full accordance with the approved HMO Management Plan for: [site address] , and shall be adhered to for the lifetime of the development.
Notwithstanding the provisions of the Town and Country Planning ([name]) Order 1987 (as amended), the use of the property as a house in multiple occupation shall not exceed more than 4 residents at any one time.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Costs Decision
- Extracted inspector · page 1
- Inspector attribution ID 597No official casework-database value to compare
- Extracted decision date · page 1
- 3 June 2026Matches the official casework database
- Extracted site visit dates
- 26 May 2026 (page 1)
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 597No official casework-database value to compare
- Extracted decision date · page 1
- 3 June 2026Matches the official casework database
- Extracted site visit dates
- 26 May 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6006988
- Application reference
- 25/01448/FUL
- Lead case reference
- Not recorded
- Planning authority
- City of York Council
- Planning authority code
- E06000014
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Change of use
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Planning Appeals - Full
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 260 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- No
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 24 March 2026
- Valid date
- 31 March 2026
- Start date
- 9 April 2026
- Planning authority decision date
- 21 October 2025
- Appeal decision date
- 3 June 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Yes
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office-s78
- Dataset status
- Current release
- Catalogue record ID
- 89798
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 20 August 2026 at 16:29