Appeal 6007070
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as retrospective application for new boundary wall and fence. Existing hedges removed.
Section 02
Decision
The appeal is dismissed.
Section 03
Appeal Procedure
The site visit was undertaken by a representative of the Inspector whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
[name]
I saw on my site visit that the development proposed has already been constructed and appeared to be in accordance with the plans before me. I have therefore considered the appeal on the basis that planning permission is sought retrospectively.
Section 05
Main Issue
The main issue is the effect of the development on highway safety.
Section 06
Reasons for the Recommendation
The Council’s Transport SPD (2023) (SPD) sets out that 2m x 2m sight lines should be provided where a drive meets the back of the footway, to ensure appropriate visibility between vehicles emerging from the driveway and pedestrians. In this case, the driveway is flanked on either side by brick pillars which abut the pavement edge, with no meaningful set back of the gates from the footway. This arrangement clearly conflicts with the guidance in the SPD and, even accounting for the railings that punctuate the wall, significantly impedes intervisibility between vehicles using the access, cyclists and drivers travelling along [address], and pedestrians using the footway.
There is also no provision within the site for turning, meaning vehicles would need to reverse into or out of the highway. This would increase the likelihood of conflict with pedestrians and other road users. While there is little evidence to suggest that the raised kerb would result in damage to the highway, the absence of a dropped kerb would reduce pedestrians’ ability to anticipate vehicle movements across the pavement. This would be particularly problematic for those with visual impairments or limited mobility, who depend on clear visibility and predictable vehicle movements to navigate safely. Such a risk is exacerbated by the site’s position at the [address] junction and opposite the parade of shops where pedestrian and vehicle movements are higher and more varied. Furthermore, as the gates are not set back from the edge of the highway, vehicles would likely need to wait on the footpath for them to be opened, causing additional obstruction and harm to pedestrian safety.
I note that a driveway appears to have existed for some time and that the former boundary hedge would likely have restricted visibility between the road and driveway. However, the wall, pillars and gates formalise this access and restrict visibility permanently. No evidence has been provided regarding the accident data in this location. Even if no collisions have been recorded, this would not capture near misses nor does it convince me that a potentially unsafe arrangement should be maintained in perpetuity. Accordingly, the previous arrangement does not justify a development that is detrimental to highway safety.
I accept that the access is set some distance from the bus stop, and that no changes have been made to the road, pavement or level of parking. There is also no dispute regarding the effect on the character and appearance of the area. However, these matters do not overcome the identified risk or justify a harmful development where the effects could be significant and long lasting. I have also considered nearby properties, including Nos 23, 27 and [address], which take access across the pavement. I do not know the planning history of these schemes. However, from what I saw, these either benefit from a dropped kerb or do not occupy a corner plot position. That said, these properties are also likely to encounter similar highway safety issues, and do not serve to demonstrate that the development is acceptable.
Consequently, the development has an unacceptable effect on highway safety. It therefore conflicts with Policy P10 of the [name] (as amended by the [name] 2019) and Saved Policy GP5 of the Leeds Unitary Development Plan (Review 2006) insofar as they require, amongst other things, for developments to provide good design and maximise highway safety. It is also contrary to the public safety aims of the National Planning Policy Framework.
Section 07
Conclusion and Recommendation
For the reasons given above and having had regard to all other matters raised, I recommend that the appeal should be dismissed. S Jamieson APPEAL PLANNING OFFICER
Section 08
Inspector’s Decision
I have considered all the submitted evidence and my representative’s report and on that basis the appeal is dismissed. [planning inspector] INSPECTOR
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 494No official casework-database value to compare
- Extracted decision date · page 1
- 19 June 2026Matches the official casework database
- Extracted site visit dates
- 13 May 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6007070
- Application reference
- 25/06456/FU
- Lead case reference
- Not recorded
- Planning authority
- Leeds City Council
- Planning authority code
- E08000035
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Householder
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 264 m²
- Number of residences
- Not recorded
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 26 March 2026
- Valid date
- 26 March 2026
- Start date
- 27 March 2026
- Planning authority decision date
- 29 January 2026
- Appeal decision date
- 19 June 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office
- Dataset status
- Current release
- Catalogue record ID
- 90716
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21