Appeal 6007101
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
11 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as: ‘To install electric gates to the opening of our driveway out to the road, similar to Bunting next door.’
Section 02
Decision
The appeal is dismissed.
Section 03
Appeal Procedure
The site visit was undertaken by a representative of the Inspector whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
[name]
During my site visit, I observed a development which appeared the same as that shown on the plans. I have therefore determined the appeal on the basis that planning permission is sought to retain the development that has been constructed and for clarity, based on what is shown on the plans.
Section 05
[name]
The appeal site is within the Green Belt and so the main issues are: • Whether or not the development is inappropriate development in the Green Belt, having regard to the National Planning Policy Framework and any relevant development plan policies. • The effect of the development on the openness of the Green Belt. • If the development is inappropriate development, whether the harm by reason of inappropriateness, and any other harm, is clearly outweighed by other considerations to amount to the very special circumstances required to justify the development.
Section 06
Whether or Not Inappropriate Development
The appeal site comprises a detached single-storey dwellinghouse with rooms in the roof space. It is located on the southern side of the heavily trafficked A245 ( [site address] ) in a row with several other properties. The northern side of the road is heavily vegetated. There is a footway between the road and the properties at this location and the appeal site has a wooden boundary fence and wooden access gates with crossovers at either end. The development subject to this appeal is the set of gates to the east side of the front boundary.
The National Planning Policy Framework (2024) (the Framework) identifies that the fundamental aim of Green Belt policy is to prevent urban sprawl by keeping land permanently open. The Framework outlines that the construction of new buildings should be regarded as inappropriate in the Green Belt subject to a number of exceptions as set out in paragraph 154. All other development not covered by any of the exceptions is therefore inappropriate. This includes boundary treatments.
The Elmbridge Borough Local Plan Development Management Plan (April 2015) (the Local Plan) Policy DM17 is consistent with the Green Belt aims of the Framework in terms of acknowledging that the construction of new buildings in the Green Belt will constitute inappropriate development, unless the buildings fall within the list of exceptions identified by the Framework.
The Town and Country Planning Act 1990 refers to buildings as including any structure or erection. Given the height of the fence and the span of the gates, this development should be considered as a building.
The development does not fall within any of the exceptions listed in paragraph 154 of the Framework and none have been suggested by the appellant. As such, it is inappropriate development in the Green Belt. This is a matter to which I afford substantial weight in the planning balance.
Section 07
Openness
The Framework outlines that one of the essential characteristics of Green Belts is their openness. Openness has both a spatial and a visual aspect. By its very nature of placing built development where there is currently none, the development cannot fail but to have a greater impact on the openness of the Green Belt in spatial terms.
I acknowledge that there are an existing boundary fence and an existing opening set of gates to one side of the site. The development is in keeping with this boundary treatment; however, it closes the free access to the other side of the site. Taking the overall size and scale of the development, the harm to the openness of the Green Belt from a spatial aspect is modest.
The development is approximately 1.7 metres(m) tall and approximately 5m wide. It continues the boundary treatment and the properties relationship with the road. Despite being set back from the road, it is clearly visible from the public highway and introduces additional width, size and scale to the boundary treatment that increases the overall extent of its visual perception. Nonetheless, that harm is modest.
Overall, I consider that the effect on the openness of the Green Belt is modest, and I therefore give this harm limited weight.
Section 08
[name]
Paragraph 153 of the Framework states that inappropriate development is, by definition, harmful to the Green Belt and should not be approved except in very special circumstances. Stating that very special circumstances will not exist unless the harm to the Green Belt by way of inappropriateness, and any other harm, is clearly outweighed by other considerations.
The development in this case amounts to inappropriate development in the Green Belt and the Framework requires that substantial weight be attached to the harm in that regard. It causes limited harm to the openness of the Green Belt.
I acknowledge that the appellant has raised matters of noise reduction, property security and safety of children visiting the property. However, I have no evidence before me that demonstrates how these considerations outweigh the harm I have identified. In the absence of any such evidence I conclude that these elements do not outweigh that harm.
I acknowledge a previous appeal for a similar set of gates to the other end of the front boundary. However, that appeal was determined on the issue of highway safety and I therefore distinguish it from the current appeal and afford it little weight.
I acknowledge that the matter of highway safety has not been raised in this appeal. However, compliance in this regard is a neutral matter that does not outweigh the harm identified.
I acknowledge the appellants frustration that other properties have similar developments. However, I have no evidence before me to demonstrate under which development plan and against which policies those developments at other properties were considered, or what the main considerations were, or if they even have planning permission at all. As such I afford them little weight.
Section 09
Planning Balance
The development constitutes inappropriate development in the Green Belt. When considered as a whole, modest harm is caused to the openness of the Green Belt. The substantial weight to be given to the cumulative Green Belt harm arising from the development is not clearly outweighed by the other considerations as outlined above. Consequently, the very special circumstances necessary to justify the development do not exist. Therefore, the development does not accord with the Green Belt aims of the Framework and the Local Plan.
Section 10
Conclusion and Recommendation
For the reasons given above and having had regard to all other matters raised, I recommend that the appeal should be dismissed.
Section 11
Inspector’s Decision
I have considered all the submitted evidence and my representative’s report and on that basis the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 145No official casework-database value to compare
- Extracted decision date · page 1
- 29 June 2026Matches the official casework database
- Extracted site visit dates
- 2 June 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6007101
- Application reference
- 2025/2880
- Lead case reference
- Not recorded
- Planning authority
- Elmbridge Borough Council
- Planning authority code
- E07000207
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Householder
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 10 m²
- Number of residences
- Not recorded
- Site in Green Belt
- Yes
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 26 March 2026
- Valid date
- 9 April 2026
- Start date
- 9 April 2026
- Planning authority decision date
- 10 March 2026
- Appeal decision date
- 29 June 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office
- Dataset status
- Current release
- Catalogue record ID
- 91141
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21