Appeal 6008536
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
9 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
residential ground floor rear / side extension to outrigger.
Section 02
Decision
The appeal is allowed and planning permission is granted for residential ground floor rear / side extension to outrigger at [site address] , Bromley [postcode] in accordance with the terms of the application Ref 26/00452/HPA and the plans submitted with it, subject to the following conditions:
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: 2027/209, 2027/210, 2027/220.
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.
Section 03
[name]
The site benefits from an extant Lawful Development Certificate under reference 25/05728/LDC. That certificate establishes the lawfulness of single-storey development at the appeal property, including an infill element with a greater height to the top of a flat roof, albeit of reduced depth when compared with the appeal proposal. Concerns have been raised regarding the legitimacy of the certificate. However, there is no substantive evidence before me to indicate that it has been revoked, quashed, or otherwise rendered incapable of implementation. On the evidence before me, the certified development represents a realistic fallback position. I therefore attach moderate weight to it in respect of the extent of single-storey development that could lawfully take place at the appeal site and its relationship with neighbouring dwellings.
Section 04
Main Issue
The main issue is the effect of the proposed development on the living conditions of the occupiers of [address] (No.79), particularly in terms of outlook.
Section 05
Reasons
The appeal property is a two-storey mid-terrace dwelling on the southern side of [address]. It has an existing two-storey rear outrigger, a common feature of this terrace. The adjoining properties, including 75 (No.75) and [address], retain a broadly comparable rear outrigger arrangement, although there are various single-storey rear and infill extensions elsewhere within the terrace and surrounding area. These vary in their detailed form, depth and roof design.
The proposal would infill the side return and provide a single-storey rear extension, so that the new addition would wrap around the existing outrigger. Along the common boundary with No.79, the extension would have a length of about 7.2 metres. The boundary wall would be about 2.43 metres above the adjoining ground level, with the roof then sloping away from the boundary.
The proposal would introduce built form along a boundary where the outlook from No.79 is presently more open. It would be visible from windows in the rear and flank elevations of that property. Given the relatively narrow side-return relationship between the outriggers, I accept that the proposal would change the outlook from No.79 to some degree.
Although the flank wall would be higher than a typical domestic fence, it would not be of excessive height in the context of the existing two-storey rear outrigger arrangement, the close-grained terraced form of development, and normal domestic boundary conditions. Importantly, the roof would slope away from No.79, reducing the visual mass of the extension as perceived from that dwelling.
While the length of development along the boundary would be appreciable, its height and roof form would limit its enclosing effect. The retained open aspect beyond and above the extension, particularly from the principal rear-facing outlook of No.79, would further moderate its effect. I am not persuaded that the proposal would create an unacceptable sense of enclosure, tunnel effect or an unduly overbearing relationship.
I also attach weight to the fallback position. I acknowledge that the certified development is not identical to the appeal proposal. It would have a different configuration and would not be a full replication of the wraparound form now before me. However, the fallback would itself introduce single-storey built form close to the same neighbouring outlooks and within the same rear/side relationship. It therefore shows that the outlook from No.79 is not one which would necessarily remain unaffected by lawful development at the appeal site.
The Council’s Urban Design Guide Supplementary Planning Document (2023) advises that extensions should avoid uncharacteristically large additions that harm neighbouring amenity. However, that guidance must be applied having regard to the specific circumstances of the site. In this case, when noting the height, roof form sloping away from No.79, the existing outrigger relationship, and material fallback position, I find that the proposal would therefore accord with the broad amenity objectives of the guidance.
The Council did not find that the proposal would result in any unacceptable loss of light to No.79. Based on the evidence before me, and having regard to the height, siting and roof form of the proposed extension, I see no reason to reach a different
Section 06
conclusion.
I therefore conclude that the proposal would not unacceptably harm the living conditions of occupiers of No.79, having had particular regard to outlook. As such, the proposal would not conflict with Policy D3 of the London Plan (2021) or Policies 6 and 37 of the Bromley Local plan (2019), which amongst other matters, require development to be of a high standard of design, provide appropriate outlook and be compatible with surrounding development.
Section 07
Other Matters
The Council concluded that the proposal would not have an unacceptable impact on the living conditions of the occupiers of No.75. Based on the evidence before me and my observations on site, I find no reason to disagree. The proposal would not project significantly beyond the rear of No.75 and would not result in unacceptable dominance, enclosure, loss of outlook or loss of light to that property.
Concern has been raised regarding noise and disturbance. The proposal is a domestic extension to an existing dwelling. Construction activity would be temporary and subject to normal controls. Once completed, the development would not introduce a materially different or more intensive residential use. I therefore find no unacceptable harm in this respect.
Section 08
Conditions
I have considered the conditions suggested by the Council against the tests of paragraph 57 of the National Planning Policy Framework and advice in the Planning Practice Guidance: Use of planning conditions. In addition to the statutory time limit condition, a condition specifying the relevant plans is necessary to provide certainty. A condition requiring the external materials to match those of the existing dwelling is also necessary to ensure a satisfactory appearance.
Section 09
Conclusion
For the reasons given above, and having regard to all other matters raised, I conclude that the appeal should be allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 5558No official casework-database value to compare
- Extracted decision date · page 1
- 29 June 2026Matches the official casework database
- Extracted site visit dates
- 15 June 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6008536
- Application reference
- 26/00452/HPA
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Bromley
- Planning authority code
- E09000006
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Householder
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 165 m²
- Number of residences
- Not recorded
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 22 April 2026
- Valid date
- 22 April 2026
- Start date
- 11 May 2026
- Planning authority decision date
- 2 April 2026
- Appeal decision date
- 29 June 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office
- Dataset status
- Current release
- Catalogue record ID
- 91153
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21