Skip to main content
Official casework recordDismissedCurrent release

Appeal 3307317

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

5 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

erection of single storey, oak framed orangery to rear.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Main Issue

    The main issue in this appeal is whether the proposed extension in relation to the cumulative enlargement of the dwelling is acceptable, as regards development plan policy which seeks to safeguard the distinctive character and appearance of the New Forest National Park and maintain a balance in the housing stock within it, whilst also taking account of all other material considerations.

  3. Section 04

    Reasons

    The appeal property is a detached house on a large plot, with further extensive land holdings in the same ownership. It is on the east side of [address] (B3058), within a loose group of dwellings of different sizes on both sides of the road. It lies within the countryside, and outside of any of the defined settlements.

    The proposal would construct a rear extension described as an orangery, with brick elevations and extensive glazing, with a flat roof and two lantern rooflights. It would be a sizeable extension extending, on the basis of the submitted plans, some 7.83 metres across the rear elevation with a depth varying between 5.22m and 4.0m.

    Policy DP36 of the New Forest National Park Local Plan (Local Plan) sets out a limit of 30% for extensions to an existing dwelling, which is defined as it existed on 1 July 1982 (or as originally built or legally established if later than 1 July 1982). The supporting text explains that the objective of the policy is twofold; one to ensure that incremental extensions do not affect the locally distinctive character of the built environment of the New Forest and secondly, to seek to maintain a balance in the range and mix of housing stock available. The National Planning Policy Framework (Framework) confirms at paragraph 176 that great weight should be given to enhancing landscape and scenic beauty in National Parks.... which have the highest status of protection in relation to these issues.

    Although there is disagreement over the precise figures, the Council and Appellant agree that the property was extended with a sizeable addition in 1988 which approximately doubled the floorspace of the property. This proposal would add further to the size of the property resulting in an overall increase since 1982 of around 130%, depending on the figures used by the Council and the Appellant. I do not consider it necessary to analyse the figures in further detail as there is no disagreement over the order of increase in size, in terms of comparing the property as of 1982; with the extension granted permission in 1988 and the proposed extension.

    On the basis of the figures, and the resultant scale of increase over the size of the property as of 1982, it is clear that the proposal would not be in accordance with Policy DP36 of the Local Plan. I recognise that it is already a large house on a generous sized plot but it would still result in an even larger house given the scale and proportions of the proposed extension, although I have insufficient information before me to address whether the further addition would materially affect the range and mix of housing stock available. However, the Appellant’s case appears in part to be a criticism of the policy objectives and content, suggesting that once a house is large or over a certain value it is unlikely to result in a further imbalance in the range and mix of housing stock available. I do not have the evidence before me to conclude on this matter and, furthermore, these are arguments that would more properly need to be debated at a future Local Plan review, assuming the same or a similar policy was proposed.

    I agree that the proposed extension would not be seen from the road but it would be a further incremental increase on the size of the property and would therefore not meet the objectives of the policy to protect through limiting cumulative and incremental increases to properties, the locally distinctive character of the built environment of the New Forest.

    The Appellant has referenced an appeal decision where permission was granted for an extension, albeit that the property had already exceeded the floorspace increase as a result of earlier permissions (Appeal Ref: APP/B9506/D/21/3288303). It is a fundamental planning objective that each decision must be considered on its planning merits. Nonetheless, I have taken that decision into account in my decision, so far as the information has been made available to me. Whilst referencing the same policy, it does not seem to me that the proposal was identical, particularly in its size and form, with the proposal before me.

    It is my view that there are no material considerations in this particular case which would justify me making a decision other than in accordance with development plan policy. Accordingly, I conclude that the proposed extension in relation to the cumulative enlargement of the dwelling would not be acceptable and would conflict with Policy DP36 and Policy SP17 of the Local Plan, which seek, through limiting the size of extensions to existing properties, to safeguard the distinctive character and appearance of the New Forest National Park and maintain a balance in the housing stock within it.

  4. Section 05

    Conclusion

    For the reasons given above and having regard to all other matters raised, I conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 257No official casework-database value to compare
    Extracted decision date · page 1
    2 March 2023Matches the official casework database
    Extracted site visit dates
    24 January 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3307317
Application reference
22/00074
Lead case reference
Not recorded
Planning authority
New Forest
Planning authority code
E26000009

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
33 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
20 September 2022
Valid date
20 September 2022
Start date
16 November 2022
Planning authority decision date
13 July 2022
Appeal decision date
2 March 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
29141
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21